Return-Path: =?utf-8?q?=3CBATV+c85c106e07b9920ebbc6+5464+infradead=2Eorg+d?= =?utf-8?q?wmw2=40twosheds=2Esrs=2Einfradead=2Eorg=3E?= Received: from mail.linutronix.de (146.0.238.70:993) by crypto-ml.lab.linutronix.de with IMAP4-SSL for ; 09 Aug 2018 19:20:59 -0000 Received: from twosheds.infradead.org ([2001:8b0:10b:1:21d:7dff:fe04:dbe2]) by Galois.linutronix.de with esmtps (TLS1.2:RSA_AES_256_CBC_SHA256:256) (Exim 4.80) (envelope-from =?utf-8?q?=3CBATV+c85c106e07b9920ebbc6+5464+infradea?= =?utf-8?q?d=2Eorg+dwmw2=40twosheds=2Esrs=2Einfradead=2Eorg=3E=29?= id 1fnqUT-0005MH-2N for speck@linutronix.de; Thu, 09 Aug 2018 21:20:58 +0200 Received: from [2001:8b0:10b:1:cad3:ffff:fe76:b9bc] by twosheds.infradead.org with esmtpsa (Exim 4.90_1 #2 (Red Hat Linux)) id 1fnqUS-000Dr1-5l for speck@linutronix.de; Thu, 09 Aug 2018 19:20:56 +0000 Message-ID: <1533842451.1986.9.camel@infradead.org> Subject: [MODERATED] Re: Cache load gadgets From: David Woodhouse In-Reply-To: References: <1533736415.3615.64.camel@infradead.org> Date: Thu, 09 Aug 2018 20:20:51 +0100 Mime-Version: 1.0 Content-Type: text/plain; charset="utf-8" Content-Transfer-Encoding: 8bit To: speck@linutronix.de List-ID: On Thu, 2018-08-09 at 21:00 +0200, speck for Thomas Gleixner wrote: > On Wed, 8 Aug 2018, speck for David Woodhouse wrote: > > > If we aren't disabling hyperthreading, then we get to lose sleep over > > what a VM guest can trick us into loading into L1$ while a sibling runs > > the attack. > >  > > For this they only need half a Spectre-v1 gadget; they only need to > > load something into L1. We've tweaked our scanner and trawled through > > the false positives, and we have a handful of patches which look > > something like the one below. > > > > Should we be getting these into the tree for next Tuesday's release? > > They look simple enough. So yes, why not as it needs to be fixed anyway. Well... a lot of people are busy making production builds and testing them, and getting things ready to release on Tuesday. If we pile more stuff on now, we're basically making a lot of people throw it all away and work through the weekend. Which is fine if it's necessary... but we should only really do if it if *is* necessary. I'm inclined to suggest the gadget fixes can wait until Tuesday.