From: Eric Barton Date: Thu, 25 Sep 2008 16:54:51 +0100 Subject: [Lustre-devel] Simpifying Interoperation Message-ID: List-Id: MIME-Version: 1.0 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit To: lustre-devel@lists.lustre.org Here are some first thoughts on Huang Hua's idea to simplify version interoperation, and an invitation for further comments... 1. This scheme should not interfere with upgrade via failover pairs, and it must also allow the MDS to be upgraded separately from the OSSs. I think this means in general that we have to allow piecemeal server upgrades. 2. This scheme need a mechanism that... a) notifies clients when a particular server is about to upgrade so that update operations are blocked until the upgrade completes and the client reconnects to the upgraded (and/or failed over) server. b) notifies the server when all clients have completed preparation for the upgrade so that no further requests require resend. c) notifies clients when all outstanding updates have been committed. If the server crashes before this point, client replay is still required. Clients must not poll for this since the server is shutting down. The DLM seems the right basic mechanism to notify clients, however current assumptions about acquisition timeouts might be an issue. We must also ensure that the race between this server upgrade process and connection establishment (including any new notification locks) by new clients is handled consistently. 3. It's not clear to me that we need to evict, or even clean the client cache provided the client doesn't attempt any more writes until it has connected to the failover server. The client can re-acquire all the locks covering its cache during recovery after the upgrade - and there is no need for request refomatting here since locks are replayed explicitly (i.e. new requests are formatted from scratch using the correct protocol version). It does seem advisable however to clean the cache before such a significant system incident. 4. We can avoid reformatting requests during open replay if this is also done explicity. 5. This scheme prevents recovery on clients that were disconnected when the upgrade began. Such clients will simply be evicted when they reconnect even though the server should actually have committed all their replayable requests. If this can be prevented, we can probably also dispense with much of the notification described in (2) above. However it would require (a) a change in the connection protocol to get clients to purge their own replay queue and (b) changes to ensure resent requests can be reconstructed from scratch (but maybe (b) is just another way of saying "request reformatting"). If this is doable - it further begs the question of whether simply making all server requests synchronous during upgrades is enough to simply most interoperation issues. 6. This is all about client/server communications. Are there any issues for inter-server interoperation? 7. Clients and servers may have to run with different versions for extended periods (one customer ran like this for months). Does this raise any issues with this scheme? Cheers, Eric