Received: from lo.gmane.org ([80.91.229.12]) by linuxtogo.org with esmtp (Exim 4.72) (envelope-from ) id 1QQx73-00012T-Ou for openembedded-devel@lists.openembedded.org; Mon, 30 May 2011 09:42:09 +0200 Received: from list by lo.gmane.org with local (Exim 4.69) (envelope-from ) id 1QQx40-0002jJ-GA for openembedded-devel@lists.openembedded.org; Mon, 30 May 2011 09:39:00 +0200 Received: from ip545070eb.adsl-surfen.hetnet.nl ([84.80.112.235]) by main.gmane.org with esmtp (Gmexim 0.1 (Debian)) id 1AlnuQ-0007hv-00 for ; Mon, 30 May 2011 09:39:00 +0200 Received: from koen by ip545070eb.adsl-surfen.hetnet.nl with local (Gmexim 0.1 (Debian)) id 1AlnuQ-0007hv-00 for ; Mon, 30 May 2011 09:39:00 +0200 X-Injected-Via-Gmane: http://gmane.org/ To: openembedded-devel@lists.openembedded.org From: Koen Kooi Date: Mon, 30 May 2011 09:38:46 +0200 Message-ID: References: <20110530072614.GA10662@excalibur.local> Mime-Version: 1.0 X-Complaints-To: usenet@dough.gmane.org X-Gmane-NNTP-Posting-Host: ip545070eb.adsl-surfen.hetnet.nl User-Agent: Mozilla/5.0 (Macintosh; U; Intel Mac OS X 10.6; en-US; rv:1.9.1.16) Gecko/20101127 Shredder/3.0.11pre In-Reply-To: <20110530072614.GA10662@excalibur.local> X-Enigmail-Version: 1.0.1 Subject: Re: Interest in an 2011.06/07 release? X-BeenThere: openembedded-devel@lists.openembedded.org X-Mailman-Version: 2.1.11 Precedence: list Reply-To: openembedded-devel@lists.openembedded.org List-Id: Using the OpenEmbedded metadata to build Distributions List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Mon, 30 May 2011 07:42:09 -0000 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 7bit -----BEGIN PGP SIGNED MESSAGE----- Hash: SHA1 On 30-05-11 09:26, Stefan Schmidt wrote: > Hello. > > If we would follow our normal quarterly schedule for releases (well, > normal is a bit streched here with only two quarterly releases so far > :)) june would be another target. > > This is however driven by peoples needs and willingness to do the > needed work. What I see and hear from people is that they are either > happy with the 2011.03-maintenance branch or are waiting for a first > release based on oe-core. I'm happy with the 2011.03 maintenance branch and have no need for a 2011.06 release. It would make more sense to come up with some metrics for oe-core + meta-oe to decide when .dev can be made RO. And related to that, come up with a process on how other layers (meta-oe, meta-ti, etc) tie into an oe-core release. regards, koen -----BEGIN PGP SIGNATURE----- Version: GnuPG v1.4.5 (Darwin) iD8DBQFN40mGMkyGM64RGpERAmDCAJ9E5rIXd/Rqpxnq3Cz0Wa9N8SpA3ACfYolo An9tEYKEFGnBRg3b9ug3Nh8= =flMC -----END PGP SIGNATURE-----