Skip to contentSkip to conversation

drm/sced: Add FIFO policy for scheduler rq

PATCH Superseded Andrey Grodzovsky 4 participants 14 messages Aug 22, 2022 – Aug 25, 2022

Subsystems (3)

v1 of 2 Superseded Latest is v2 →

lore
Share & tools
lore
#0 lore raw

PATCH 1/1 drm/sced: Add FIFO policy for scheduler rq

Poblem: Given many entities competing for same rq on same scheduler an uncceptabliy long wait time for some jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job might execute ealier even though that job arrived later then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
 drivers/gpu/drm/scheduler/sched_entity.c |  2 +
 drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
 include/drm/gpu_scheduler.h              |  8 +++
 3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
 	atomic_inc(entity->rq->sched->score);
 	WRITE_ONCE(entity->last_user, current->group_leader);
 	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
 	/* first job wakes up scheduler */
 	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +61 -4

94 lines not on this page · raw message

include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
 	/** @last_dependency: tracks @dependencies as they signal */
 	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
 };
 
 static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,
Signature · 1 line
2.25.1
#1 lore raw

Am 22.08.22 um 22:09 schrieb Andrey Grodzovsky:

Quoted 49 lines

Poblem: Given many entities competing for same rq on same scheduler an uncceptabliy long wait time for some jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job might execute ealier even though that job arrived later then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
  drivers/gpu/drm/scheduler/sched_entity.c |  2 +
  drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
  include/drm/gpu_scheduler.h              |  8 +++
  3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
  	atomic_inc(entity->rq->sched->score);
  	WRITE_ONCE(entity->last_user, current->group_leader);
  	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
  	/* first job wakes up scheduler */
  	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +0 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
  #define CREATE_TRACE_POINTS
  #include "gpu_scheduler_trace.h"
 

drivers/gpu/drm/scheduler/sched_main.c line 71

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");

Well we don't really have an autodetect at the moment, so I would drop that.

Quoted 54 lines
drivers/gpu/drm/scheduler/sched_main.c +32 -3
+module_param_named(sched_policy, drm_sched_policy, int, 0444);
+
+
  #define to_drm_sched_job(sched_job)		\
  		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
  }
 
  /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
   *
   * @rq: scheduler run queue to check.
   *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
   */
  static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
  {
  	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
  	return NULL;
  }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 214

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}

That should probably be a separate function or at least outside of this here.

Apart from that totally straight forward implementation. Any idea how much extra overhead that is?

Regards,
Christian.

Quoted 39 lines
drivers/gpu/drm/scheduler/sched_main.c +9 -1
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
  /**
   * drm_sched_job_done - complete a job
   * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
  	/* Kernel run queue has higher priority than normal run queue*/
  	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
  		if (entity)
  			break;
  	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
  	/** @last_dependency: tracks @dependencies as they signal */
  	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
  };
 
  static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,
#2 lore raw
Quoted 132 lines · Christian König

Am 22.08.22 um 22:09 schrieb Andrey Grodzovsky:

Quoted 58 lines

Poblem: Given many entities competing for same rq on same scheduler an uncceptabliy long wait time for some jobs waiting stuck in rq before being picked up are observed (seen using  GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job might execute ealier even though that job arrived later then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
  drivers/gpu/drm/scheduler/sched_entity.c |  2 + drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++-- include/drm/gpu_scheduler.h              |  8 +++

  3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct 
 drm_sched_job *sched_job)
       atomic_inc(entity->rq->sched->score);
       WRITE_ONCE(entity->last_user, current->group_leader);
       first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+    sched_job->submit_ts = ktime_get();
+
         /* first job wakes up scheduler */
       if (first) {
drivers/gpu/drm/scheduler/sched_main.c +0 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
   #define CREATE_TRACE_POINTS
   #include "gpu_scheduler_trace.h"

  +

drivers/gpu/drm/scheduler/sched_main.c +9 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+        "specify schedule policy for entites on a runqueue (-1 = 
Quoted 1 line

auto(default) value, 0 = Round Robin,1  = use FIFO");

Well we don't really have an autodetect at the moment, so I would drop that.

Quoted 54 lines
drivers/gpu/drm/scheduler/sched_main.c +3 -0
+module_param_named(sched_policy, drm_sched_policy, int, 0444);
+
+

  #define to_drm_sched_job(sched_job)        \
          container_of((sched_job), struct drm_sched_job, queue_node) @@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq, }
    /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
   *
   * @rq: scheduler run queue to check.
   *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
   */
  static struct drm_sched_entity *

drivers/gpu/drm/scheduler/sched_main.c +1 -1
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)

  {
      struct drm_sched_entity *entity;
  @@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq) return NULL;
  }
  +/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */

drivers/gpu/drm/scheduler/sched_main.c +13 -0
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+    struct drm_sched_entity *tmp, *entity = NULL;
+    ktime_t oldest_ts = KTIME_MAX;
+    struct drm_sched_job *sched_job;
+
+    spin_lock(&rq->lock);
+
+    list_for_each_entry(tmp, &rq->entities, list) {
+
+        if (drm_sched_entity_is_ready(tmp)) {
+            sched_job = 

to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));

drivers/gpu/drm/scheduler/sched_main.c +2 -0
+
+            if (ktime_before(sched_job->submit_ts, oldest_ts)) {

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 214

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+                oldest_ts = sched_job->submit_ts;
+                entity = tmp;
+            }
+        }
+    }
+
+    if (entity) {
+        rq->current_entity = entity;
+        reinit_completion(&entity->entity_idle);
+    }

That should probably be a separate function or at least outside of this here.

Quoted 4 lines

Apart from that totally straight forward implementation. Any idea how much extra overhead that is?

Regards,
Christian.

Well, memory wise you have the extra long for each job struct for the time stamp, and then for each next job extraction you have to iterate the entire rq to find the next entity with oldest job so always linear in number of entitles. Today the worst case is also O(# entities) in case none of them are ready but usually it's not the case.

BTW, we could also add some adaptive logic where if you identify that for particular entity jobs are spending too much time (need to define a threshold) in the SW queue waiting you dynamically switch to FIFO policy and when the delays go down (or number of entities drops) you go back to RR.

Andrey

Quoted 39 lines
Quoted 38 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+
+    spin_unlock(&rq->lock);
+    return entity;
+}
+

  /**
   * drm_sched_job_done - complete a job
   * @s_job: pointer to the job which is done

drivers/gpu/drm/scheduler/sched_main.c +4 -1
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler 
 *sched)
         /* Kernel run queue has higher priority than normal run queue*/
       for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-        entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+        entity = drm_sched_policy != 1 ?
+ drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+ drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
           if (entity)
               break;
       }
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
         /** @last_dependency: tracks @dependencies as they signal */
       unsigned long            last_dependency;
+
+       /**
+    * @submit_ts:
+    *
+    * Marks job submit time
+    */
+       ktime_t                submit_ts;
+
   };
     static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,
#3 lore raw
In reply to Andrey Grodzovsky

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
 drivers/gpu/drm/scheduler/sched_entity.c |  2 +
 drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
 include/drm/gpu_scheduler.h              |  8 +++
 3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
 	atomic_inc(entity->rq->sched->score);
 	WRITE_ONCE(entity->last_user, current->group_leader);
 	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
 	/* first job wakes up scheduler */
 	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
 #define CREATE_TRACE_POINTS
 #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Quoted 48 lines
drivers/gpu/drm/scheduler/sched_main.c +26 -3
+
+
 #define to_drm_sched_job(sched_job)		\
 		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
 }
 
 /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
  *
  * @rq: scheduler run queue to check.
  *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
  */
 static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
 {
 	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
 	return NULL;
 }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself, or better yet keeping the next job to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Regards,
Luben

Quoted 44 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
 /**
  * drm_sched_job_done - complete a job
  * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
 	/* Kernel run queue has higher priority than normal run queue*/
 	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
 		if (entity)
 			break;
 	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
 	/** @last_dependency: tracks @dependencies as they signal */
 	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
 };
 
 static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,
#4 lore raw
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
  drivers/gpu/drm/scheduler/sched_entity.c |  2 +
  drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
  include/drm/gpu_scheduler.h              |  8 +++
  3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
  	atomic_inc(entity->rq->sched->score);
  	WRITE_ONCE(entity->last_user, current->group_leader);
  	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
  	/* first job wakes up scheduler */
  	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
  #define CREATE_TRACE_POINTS
  #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Quoted 54 lines
Quoted 54 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
  #define to_drm_sched_job(sched_job)		\
  		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
  }
 
  /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
   *
   * @rq: scheduler run queue to check.
   *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
   */
  static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
  {
  	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
  	return NULL;
  }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ? If you record only the oldest job and more jobs come you have no place to store their timestamps and so on next job select after current HEAD how you will know who came before or after between 2 job queues of of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before job submission your deadline time for job's execution to start - which we don't so I don't see how we can use it. This seems more suitable for real time scheduler implementation where you have a hard requirement to execute a job by some specific time T.

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and needs to remove it's jobs from SW queue).

Quoted 4 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

Andrey

Quoted 4 lines

Regards,
Luben

In my origianl design

Quoted 44 lines
Quoted 44 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
  /**
   * drm_sched_job_done - complete a job
   * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
  	/* Kernel run queue has higher priority than normal run queue*/
  	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
  		if (entity)
  			break;
  	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
  	/** @last_dependency: tracks @dependencies as they signal */
  	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
  };
 
  static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,
#5 lore raw
Quoted 78 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
  drivers/gpu/drm/scheduler/sched_entity.c |  2 +
  drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
  include/drm/gpu_scheduler.h              |  8 +++
  3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
  	atomic_inc(entity->rq->sched->score);
  	WRITE_ONCE(entity->last_user, current->group_leader);
  	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
  	/* first job wakes up scheduler */
  	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
  #define CREATE_TRACE_POINTS
  #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 5 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Regards,
Luben

Quoted 162 lines
Quoted 56 lines
Quoted 56 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
  #define to_drm_sched_job(sched_job)		\
  		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
  }
 
  /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
   *
   * @rq: scheduler run queue to check.
   *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
   */
  static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
  {
  	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
  	return NULL;
  }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 4 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

Andrey

Quoted 4 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
  /**
   * drm_sched_job_done - complete a job
   * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
  	/* Kernel run queue has higher priority than normal run queue*/
  	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
  		if (entity)
  			break;
  	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
  	/** @last_dependency: tracks @dependencies as they signal */
  	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
  };
 
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
  static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Signature · 1 line
Luben
#6 lore raw
Quoted 85 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
   drivers/gpu/drm/scheduler/sched_entity.c |  2 +
   drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
   include/drm/gpu_scheduler.h              |  8 +++
   3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
   	atomic_inc(entity->rq->sched->score);
   	WRITE_ONCE(entity->last_user, current->group_leader);
   	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
   	/* first job wakes up scheduler */
   	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
   #define CREATE_TRACE_POINTS
   #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 4 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Quoted 7 lines

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Regards,
Luben

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

Andrey

Quoted 157 lines
Quoted 155 lines
Quoted 55 lines
Quoted 55 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
   #define to_drm_sched_job(sched_job)		\
   		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
   }
 
   /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
    *
    * @rq: scheduler run queue to check.
    *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
    */
   static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
   {
   	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
   	return NULL;
   }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 3 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
   /**
    * drm_sched_job_done - complete a job
    * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
   	/* Kernel run queue has higher priority than normal run queue*/
   	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
   		if (entity)
   			break;
   	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
   	/** @last_dependency: tracks @dependencies as they signal */
   	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
   };
 
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
   static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

#7 lore raw
Quoted 96 lines · Andrey Grodzovsky
Quoted 85 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
   drivers/gpu/drm/scheduler/sched_entity.c |  2 +
   drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
   include/drm/gpu_scheduler.h              |  8 +++
   3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
   	atomic_inc(entity->rq->sched->score);
   	WRITE_ONCE(entity->last_user, current->group_leader);
   	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
   	/* first job wakes up scheduler */
   	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
   #define CREATE_TRACE_POINTS
   #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 4 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Quoted 7 lines

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Regards,
Luben

Quoted 5 lines

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

The idea is to "sort" on insertion, not on picking the next one to run.

cont'd below:

Quoted 92 lines

Andrey

Quoted 89 lines
Quoted 89 lines
Quoted 55 lines
Quoted 55 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
   #define to_drm_sched_job(sched_job)		\
   		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
   }
 
   /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
    *
    * @rq: scheduler run queue to check.
    *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
    */
   static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
   {
   	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
   	return NULL;
   }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

In a timer wheel you instantly know the "soonest" job to run--it's naturally your "next" job, regardless of in what order the timers were added and what their timeout time is.

Quoted 8 lines
Quoted 8 lines
Quoted 8 lines

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

You can also have a list of list pointers. It'd be trivial to remove a whole list from the main list, by simply removing an element--akin to locking out a rq, or should you need to edit the rq's entity list.

Quoted 6 lines
Quoted 6 lines
Quoted 6 lines
Quoted 4 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

I think I've explained this a few times now--each list represents a state and a job/entity travels through lists as it travels through states, which states more or less represent the state of execution in the hardware--it could be as simple as incoming --> pending --> done.

It allows a finer grain when resetting the hardware (should the hardware allow it).

Note that this isn't directly related to the O(1) mechanism I brought up here. As I said, I was surprised to find out none such distinction existed--that's all. Don't fixate on this.

Regards,
Luben

Quoted 52 lines
Quoted 52 lines
Quoted 52 lines

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
   /**
    * drm_sched_job_done - complete a job
    * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
   	/* Kernel run queue has higher priority than normal run queue*/
   	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
   		if (entity)
   			break;
   	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
   	/** @last_dependency: tracks @dependencies as they signal */
   	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
   };
 
Quoted 2 lines
Quoted 2 lines
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
   static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Regards,

Signature · 1 line
Luben
#8 lore raw
Quoted 202 lines · Luben Tuikov
Quoted 90 lines · Andrey Grodzovsky
Quoted 88 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
    drivers/gpu/drm/scheduler/sched_entity.c |  2 +
    drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
    include/drm/gpu_scheduler.h              |  8 +++
    3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
    	atomic_inc(entity->rq->sched->score);
    	WRITE_ONCE(entity->last_user, current->group_leader);
    	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
    	/* first job wakes up scheduler */
    	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
    #define CREATE_TRACE_POINTS
    #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 3 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Quoted 8 lines
Quoted 2 lines

Regards,
Luben

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

The idea is to "sort" on insertion, not on picking the next one to run.

cont'd below:

Quoted 87 lines

Andrey

Quoted 85 lines
Quoted 85 lines
Quoted 53 lines
Quoted 53 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
    #define to_drm_sched_job(sched_job)		\
    		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
    }
 
    /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
     *
     * @rq: scheduler run queue to check.
     *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
     */
    static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
    {
    	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
    	return NULL;
    }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 209

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

In a timer wheel you instantly know the "soonest" job to run--it's naturally your "next" job, regardless of in what order the timers were added and what their timeout time is.

Quoted 7 lines
Quoted 7 lines
Quoted 7 lines

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 3 lines

You can also have a list of list pointers. It'd be trivial to remove a whole list from the main list, by simply removing an element--akin to locking out a rq, or should you need to edit the rq's entity list.

So you do mean some kind of FIFO list. I really would want to avoid maintaining an extra data structure, we already have jobs stored in entity SPSC queue, and now we will have to add to a job struct  a pointer to another,  rq wide FIFO list, seems to me like a recipe for problems.

Thinking more about it, if I do let each job have it's original submission timestamp stored I can go back to my original design
of storing sched entities themself in min heap structure based on timestamp of the next job to run in the entity
(head of job list), this way we get O(1) extraction of next job to run and it will still be FIFO. The cost will be O(log(# entites in rq)) for updating the min heap on each job extraction based on next head timestamp. Still better then linear. On the downside we need to maintain an rb tree structure to store the entitles in parallel to holding them in linear list for round robin as it's tpday. I am attaching my original patch to give sense of it with TODO section were I added this new code. There are actually some corner cases with empty SPCP queue becoming full and sampling not the head of the queue but the next one is what we need but i think it's solvable.

In general it seems to me that before doing more complicated design we actually need to measure and see if there is really a substantial performance hit compared to current RR or even  compared to possible O(1) extraction solution. No point to complicate design if we don't get significant performance improvement from it.

Quoted 9 lines
Quoted 5 lines
Quoted 5 lines
Quoted 5 lines
Quoted 4 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

I think I've explained this a few times now--each list represents a state and a job/entity travels through lists as it travels through states, which states more or less represent the state of execution in the hardware--it could be as simple as incoming --> pending --> done.

Quoted 7 lines

It allows a finer grain when resetting the hardware (should the hardware allow it).

Note that this isn't directly related to the O(1) mechanism I brought up here. As I said, I was surprised to find out none such distinction existed--that's all. Don't fixate on this.

Regards,
Luben

Right, so this one is a separate  topic regarding the pending job list refactoring which we need to discuss and fix separately - i have TODO to come back to your patches from a year ago or so which were addressing this. Probably will try to get to this after finishing this work.

Andrey

Quoted 52 lines
Quoted 52 lines
Quoted 52 lines
Quoted 52 lines

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
    /**
     * drm_sched_job_done - complete a job
     * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
    	/* Kernel run queue has higher priority than normal run queue*/
    	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
    		if (entity)
    			break;
    	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
    	/** @last_dependency: tracks @dependencies as they signal */
    	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
    };
 
Quoted 3 lines
Quoted 2 lines
Quoted 2 lines
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
    static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Regards,

From c7fad79b1790e5a4f43e95c390ebf4e638662fe4 Mon Sep 17 00:00:00 2001
From: Andrey Grodzovsky <[email protected]>
Date: Fri, 29 Jul 2022 12:26:50 -0400
Subject: drm/sced: Add FIFO sched policy to rq v7

Also add enblement flag.

Add ordering based on TS

---
 drivers/gpu/drm/scheduler/sched_entity.c |   6 ++
 drivers/gpu/drm/scheduler/sched_main.c   | 109 ++++++++++++++++++++++-
 include/drm/gpu_scheduler.h              |  38 ++++++++
 3 files changed, 150 insertions(+), 3 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +6 -0
index 191c56064f19..6eb495dec09f 100644
@@ -33,6 +33,8 @@
 #define to_drm_sched_job(sched_job)		\
 		container_of((sched_job), struct drm_sched_job, queue_node)
 
+extern int drm_sched_policy;
+
 /**
  * drm_sched_entity_init - Init a context entity used by scheduler when
  * submit to HW ring.
@@ -73,6 +75,7 @@ int drm_sched_entity_init(struct drm_sched_entity *entity,
 	entity->priority = priority;
 	entity->sched_list = num_sched_list > 1 ? sched_list : NULL;
 	entity->last_scheduled = NULL;
+	RB_CLEAR_NODE(&entity->rb_tree_node);
 
 	if(num_sched_list)
 		entity->rq = &sched_list[0]->sched_rq[entity->priority];
@@ -443,6 +446,7 @@ struct drm_sched_job *drm_sched_entity_pop_job(struct drm_sched_entity *entity)
 	smp_wmb();
 
 	spsc_queue_pop(&entity->job_queue);
+
 	return sched_job;
 }
 
@@ -507,6 +511,7 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
 	atomic_inc(entity->rq->sched->score);
 	WRITE_ONCE(entity->last_user, current->group_leader);
 	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
 
 	/* first job wakes up scheduler */
 	if (first) {
@@ -518,6 +523,7 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
 			DRM_ERROR("Trying to push to a killed entity\n");
 			return;
 		}
+
 		drm_sched_rq_add_entity(entity->rq, entity);
 		spin_unlock(&entity->rq_lock);
 		drm_sched_wakeup(entity->rq->sched);
drivers/gpu/drm/scheduler/sched_main.c +106 -3

169 lines not on this page · raw message

include/drm/gpu_scheduler.h +38 -0
index 944f83ef9f2e..1c841a24b5c0 100644
@@ -196,6 +196,21 @@ struct drm_sched_entity {
 	 * drm_sched_entity_fini().
 	 */
 	struct completion		entity_idle;
+
+	/**
+	 * @oldest_job_waiting:
+	 *
+	 * Marks earliest job waiting in SW queue
+	 */
+	ktime_t 			oldest_job_waiting;
+
+	/**
+	 * @rb_tree_node:
+	 *
+	 * To insert this entity into time based priority queue
+	 */
+	struct rb_node 			rb_tree_node;
+
 };
 
 /**
@@ -205,6 +220,7 @@ struct drm_sched_entity {
  * @sched: the scheduler to which this rq belongs to.
  * @entities: list of the entities to be scheduled.
  * @current_entity: the entity which is to be scheduled.
+ * @rb_tree_root: root of time based priory queue of entites for FIFO scheduling
  *
  * Run queue is a set of entities scheduling command submissions for
  * one specific ring. It implements the scheduling policy that selects
@@ -215,6 +231,7 @@ struct drm_sched_rq {
 	struct drm_gpu_scheduler	*sched;
 	struct list_head		entities;
 	struct drm_sched_entity		*current_entity;
+	struct rb_root_cached 		rb_tree_root;
 };
 
 /**
@@ -258,6 +275,14 @@ struct drm_sched_fence {
          * @owner: job owner for debugging
          */
 	void				*owner;
+
+	/**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+	ktime_t                         submit_ts;
+
 };
 
 struct drm_sched_fence *to_drm_sched_fence(struct dma_fence *f);
@@ -501,6 +526,19 @@ void drm_sched_rq_add_entity(struct drm_sched_rq *rq,
 void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
 				struct drm_sched_entity *entity);
 
+void drm_sched_rq_update_fifo(struct drm_sched_rq *rq,
+			      struct drm_sched_entity *entity,
+			      bool remove_only);
+
+static __always_inline bool drm_sched_entity_compare_earlier(struct rb_node *a,
+							     const struct rb_node *b)
+{
+	struct drm_sched_entity *ent_a =  rb_entry((a), struct drm_sched_entity, rb_tree_node);
+	struct drm_sched_entity *ent_b =  rb_entry((b), struct drm_sched_entity, rb_tree_node);
+
+	return ktime_before(ent_a->oldest_job_waiting, ent_b->oldest_job_waiting);
+}
+
 int drm_sched_entity_init(struct drm_sched_entity *entity,
 			  enum drm_sched_priority priority,
 			  struct drm_gpu_scheduler **sched_list,
Signature · 1 line
2.25.1
#9 lore raw

Inlined:

Quoted 209 lines · Andrey Grodzovsky
Quoted 202 lines · Luben Tuikov
Quoted 90 lines · Andrey Grodzovsky
Quoted 88 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
    drivers/gpu/drm/scheduler/sched_entity.c |  2 +
    drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
    include/drm/gpu_scheduler.h              |  8 +++
    3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
    	atomic_inc(entity->rq->sched->score);
    	WRITE_ONCE(entity->last_user, current->group_leader);
    	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
    	/* first job wakes up scheduler */
    	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
    #define CREATE_TRACE_POINTS
    #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 3 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Quoted 8 lines
Quoted 2 lines

Regards,
Luben

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

The idea is to "sort" on insertion, not on picking the next one to run.

cont'd below:

Quoted 87 lines

Andrey

Quoted 85 lines
Quoted 85 lines
Quoted 53 lines
Quoted 53 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
    #define to_drm_sched_job(sched_job)		\
    		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
    }
 
    /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
     *
     * @rq: scheduler run queue to check.
     *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
     */
    static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
    {
    	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
    	return NULL;
    }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 259

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

In a timer wheel you instantly know the "soonest" job to run--it's naturally your "next" job, regardless of in what order the timers were added and what their timeout time is.

Quoted 7 lines
Quoted 7 lines
Quoted 7 lines

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 3 lines

You can also have a list of list pointers. It'd be trivial to remove a whole list from the main list, by simply removing an element--akin to locking out a rq, or should you need to edit the rq's entity list.

Quoted 6 lines

So you do mean some kind of FIFO list. I really would want to avoid maintaining an
extra data structure, we already have jobs stored in entity SPSC queue, and now we will have to add
to a job struct  a pointer to another,  rq wide FIFO list, seems to me like a recipe for problems.

Maybe.

Quoted 10 lines

Thinking more about it, if I do let each job have it's original submission timestamp stored I can go back to my original design of storing sched entities themself in min heap structure based on timestamp of the next job to run in the entity
(head of job list), this way we get O(1) extraction of next job to run and it will still be FIFO. The cost will be O(log(# entites in rq)) for updating the min heap on each job extraction based on next head timestamp. Still better then linear. On the downside we need to maintain an rb tree structure

O(1) would be ideal, and the "sorting" can be had when the jobs are submitted, which could take O(log N), as in sorting.

But O(log N) on a balanced tree, such as you're using an R-B tree for a min heap, is a great metric and way faster than O(N).

Quoted 2 lines

to store the entitles in parallel to holding them in linear list for round robin as it's tpday.

You could choose to store one way or another, exclusively, depending on what scheduling policy had been chosen.

Quoted 5 lines

I am attaching my original patch to give sense of
it with TODO section were I added this new code. There are actually some corner cases with empty SPCP queue becoming full and sampling not the head of the
queue but the next one is what we need but i think it's solvable.

Your WIP patch looks good.

Quoted 7 lines

In general it seems to me that before doing more complicated design we actually need to measure and see if there is really a substantial performance hit compared to current RR
or even  compared to possible O(1) extraction solution. No point to complicate design if we don't get significant performance improvement from it.

WLOG, assuming all jobs are ready to be executed, then, for graphics, I'd imagine we'd want to pick the next job to run in O(1) time complexity. However O(log N) is still good and preferable. O(N) is slow. FWIW, the RR we have right now is O(1) given the job readiness assumption above.

Quoted 20 lines
Quoted 11 lines
Quoted 7 lines
Quoted 7 lines
Quoted 7 lines
Quoted 6 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

I think I've explained this a few times now--each list represents a state and a job/entity travels through lists as it travels through states, which states more or less represent the state of execution in the hardware--it could be as simple as incoming --> pending --> done.

Quoted 7 lines

It allows a finer grain when resetting the hardware (should the hardware allow it).

Note that this isn't directly related to the O(1) mechanism I brought up here. As I said, I was surprised to find out none such distinction existed--that's all. Don't fixate on this.

Regards,
Luben

Quoted 5 lines

Right, so this one is a separate  topic regarding the pending job list refactoring which we need to discuss and fix separately - i have TODO to come back
to your patches from a year ago or so which were addressing this. Probably will try to get to this after finishing this work.

Excellent!

Regards,
Luben

Quoted 59 lines

Andrey

Quoted 55 lines
Quoted 52 lines
Quoted 52 lines
Quoted 52 lines

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
    /**
     * drm_sched_job_done - complete a job
     * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
    	/* Kernel run queue has higher priority than normal run queue*/
    	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
    		if (entity)
    			break;
    	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
    	/** @last_dependency: tracks @dependencies as they signal */
    	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
    };
 
Quoted 2 lines
Quoted 2 lines
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
    static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Regards,

#10 lore raw
Quoted 249 lines · Luben Tuikov

Inlined:

Quoted 205 lines · Andrey Grodzovsky
Quoted 200 lines · Luben Tuikov
Quoted 90 lines · Andrey Grodzovsky
Quoted 88 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
     drivers/gpu/drm/scheduler/sched_entity.c |  2 +
     drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
     include/drm/gpu_scheduler.h              |  8 +++
     3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
     	atomic_inc(entity->rq->sched->score);
     	WRITE_ONCE(entity->last_user, current->group_leader);
     	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
     	/* first job wakes up scheduler */
     	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
     #define CREATE_TRACE_POINTS
     #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 3 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Quoted 7 lines
Quoted 2 lines

Regards,
Luben

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

The idea is to "sort" on insertion, not on picking the next one to run.

cont'd below:

Quoted 87 lines

Andrey

Quoted 85 lines
Quoted 85 lines
Quoted 53 lines
Quoted 53 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
     #define to_drm_sched_job(sched_job)		\
     		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
     }
 
     /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
      *
      * @rq: scheduler run queue to check.
      *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
      */
     static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
     {
     	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
     	return NULL;
     }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 259

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

In a timer wheel you instantly know the "soonest" job to run--it's naturally your "next" job, regardless of in what order the timers were added and what their timeout time is.

Quoted 7 lines
Quoted 7 lines
Quoted 7 lines

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 3 lines

You can also have a list of list pointers. It'd be trivial to remove a whole list from the main list, by simply removing an element--akin to locking out a rq, or should you need to edit the rq's entity list.

Quoted 6 lines

So you do mean some kind of FIFO list. I really would want to avoid maintaining an
extra data structure, we already have jobs stored in entity SPSC queue, and now we will have to add
to a job struct  a pointer to another,  rq wide FIFO list, seems to me like a recipe for problems.

Maybe.

Quoted 9 lines

Thinking more about it, if I do let each job have it's original submission timestamp stored I can go back to my original design of storing sched entities themself in min heap structure based on timestamp of the next job to run in the entity
(head of job list), this way we get O(1) extraction of next job to run and it will still be FIFO. The cost will be O(log(# entites in rq)) for updating the min heap on each job extraction based on next head timestamp. Still better then linear. On the downside we need to maintain an rb tree structure

O(1) would be ideal, and the "sorting" can be had when the jobs are submitted, which could take O(log N), as in sorting.

But O(log N) on a balanced tree, such as you're using an R-B tree for a min heap, is a great metric and way faster than O(N).

Quoted 2 lines

to store the entitles in parallel to holding them in linear list for round robin as it's tpday.

You could choose to store one way or another, exclusively, depending on what scheduling policy had been chosen.

Quoted 5 lines

I am attaching my original patch to give sense of
it with TODO section were I added this new code. There are actually some corner cases with empty SPCP queue becoming full and sampling not the head of the
queue but the next one is what we need but i think it's solvable.

Your WIP patch looks good.

Quoted 6 lines

In general it seems to me that before doing more complicated design we actually need to measure and see if there is really a substantial performance hit compared to current RR
or even  compared to possible O(1) extraction solution. No point to complicate design if we don't get significant performance improvement from it.

Quoted 4 lines

WLOG, assuming all jobs are ready to be executed, then, for graphics, I'd imagine we'd want to pick the next job to run in O(1) time complexity. However O(log N) is still good and preferable. O(N) is slow. FWIW, the RR we have right now is O(1) given the job readiness assumption above.

You convinced it, going to try to rework my original patch. I asked Yunxiang to measure performance delta anyway, just in case this rework get stuck and then we will just use the primitive linear search for the client needs at least.

Andrey

Quoted 85 lines
Quoted 15 lines
Quoted 15 lines
Quoted 6 lines
Quoted 6 lines
Quoted 6 lines
Quoted 5 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

I think I've explained this a few times now--each list represents a state and a job/entity travels through lists as it travels through states, which states more or less represent the state of execution in the hardware--it could be as simple as incoming --> pending --> done.

It allows a finer grain when resetting the hardware (should the hardware allow it).

Note that this isn't directly related to the O(1) mechanism I brought up here. As I said, I was surprised to find out none such distinction existed--that's all. Don't fixate on this.

Quoted 8 lines
Quoted 2 lines

Regards,
Luben

Right, so this one is a separate  topic regarding the pending job list refactoring which we need to discuss and fix separately - i have TODO to come back
to your patches from a year ago or so which were addressing this. Probably will try to get to this after finishing this work.

Excellent!

Regards,
Luben

Quoted 57 lines

Andrey

Quoted 54 lines
Quoted 51 lines
Quoted 51 lines
Quoted 51 lines

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
     /**
      * drm_sched_job_done - complete a job
      * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
     	/* Kernel run queue has higher priority than normal run queue*/
     	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
     		if (entity)
     			break;
     	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
     	/** @last_dependency: tracks @dependencies as they signal */
     	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
     };
 
Quoted 2 lines
Quoted 2 lines
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
     static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Regards,

#11 lore raw
In reply to Luben Tuikov
Quoted 249 lines · Luben Tuikov

Inlined:

Quoted 205 lines · Andrey Grodzovsky
Quoted 200 lines · Luben Tuikov
Quoted 90 lines · Andrey Grodzovsky
Quoted 88 lines · Luben Tuikov
Quoted 77 lines · Andrey Grodzovsky
Quoted 76 lines · Luben Tuikov

Inlined:

Quoted 1 line · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on

^Problem

Quoted 1 line

same scheduler an uncceptabliy long wait time for some

^unacceptably

Quoted 5 lines

jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some

^queues

Quoted 3 lines

jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job

^entities; smaller

Quoted 1 line

might execute ealier even though that job arrived later

^earlier

Quoted 39 lines

then the job in the long queue.

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

---
     drivers/gpu/drm/scheduler/sched_entity.c |  2 +
     drivers/gpu/drm/scheduler/sched_main.c   | 65 ++++++++++++++++++++++--
     include/drm/gpu_scheduler.h              |  8 +++
     3 files changed, 71 insertions(+), 4 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -0
index 6b25b2f4f5a3..3bb7f69306ef 100644
@@ -507,6 +507,8 @@ void drm_sched_entity_push_job(struct drm_sched_job *sched_job)
     	atomic_inc(entity->rq->sched->score);
     	WRITE_ONCE(entity->last_user, current->group_leader);
     	first = spsc_queue_push(&entity->job_queue, &sched_job->queue_node);
+	sched_job->submit_ts = ktime_get();
+
 
     	/* first job wakes up scheduler */
     	if (first) {
drivers/gpu/drm/scheduler/sched_main.c +1 -0
index 68317d3a7a27..c123aa120d06 100644
@@ -59,6 +59,19 @@
     #define CREATE_TRACE_POINTS
     #include "gpu_scheduler_trace.h"
 
+

drivers/gpu/drm/scheduler/sched_main.c line 72

Quoted 10 lines
drivers/gpu/drm/scheduler/sched_main.c +10 -0
+
+int drm_sched_policy = -1;
+
+/**
+ * DOC: sched_policy (int)
+ * Used to override default entites scheduling policy in a run queue.
+ */
+MODULE_PARM_DESC(sched_policy,
+		"specify schedule policy for entites on a runqueue (-1 = auto(default) value, 0 = Round Robin,1  = use FIFO");
+module_param_named(sched_policy, drm_sched_policy, int, 0444);

As per Christian's comments, you can drop the "auto" and perhaps leave one as the default, say the RR.

Quoted 3 lines
Quoted 1 line

I do think it is beneficial to have a module parameter control the scheduling policy, as shown above.

Christian is not against it, just against adding 'auto' here - like the default.

Exactly what I said.

Also, I still think an O(1) scheduling (picking next to run) should be what we strive for in such a FIFO patch implementation.
A FIFO mechanism is by it's nature an O(1) mechanism for picking the next element.

Quoted 7 lines
Quoted 2 lines

Regards,
Luben

The only solution i see for this now is keeping a global per rq jobs list parallel to SPCP queue per entity - we use this list when we switch to FIFO scheduling, we can even start building  it ONLY when we switch to FIFO building it gradually as more jobs come. Do you have other solution in mind ?

The idea is to "sort" on insertion, not on picking the next one to run.

cont'd below:

Quoted 87 lines

Andrey

Quoted 85 lines
Quoted 85 lines
Quoted 53 lines
Quoted 53 lines
drivers/gpu/drm/scheduler/sched_main.c +31 -3
+
+
     #define to_drm_sched_job(sched_job)		\
     		container_of((sched_job), struct drm_sched_job, queue_node)
 
@@ -120,14 +133,16 @@ void drm_sched_rq_remove_entity(struct drm_sched_rq *rq,
     }
 
     /**
- * drm_sched_rq_select_entity - Select an entity which could provide a job to run
+ * drm_sched_rq_select_entity_rr - Select an entity which could provide a job to run
      *
      * @rq: scheduler run queue to check.
      *
- * Try to find a ready entity, returns NULL if none found.
+ * Try to find a ready entity, in round robin manner.
+ *
+ * Returns NULL if none found.
      */
     static struct drm_sched_entity *
-drm_sched_rq_select_entity(struct drm_sched_rq *rq)
+drm_sched_rq_select_entity_rr(struct drm_sched_rq *rq)
     {
     	struct drm_sched_entity *entity;
 
@@ -163,6 +178,45 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
     	return NULL;
     }
 
+/**
+ * drm_sched_rq_select_entity_fifo - Select an entity which could provide a job to run
+ *
+ * @rq: scheduler run queue to check.
+ *
+ * Try to find a ready entity, based on FIFO order of jobs arrivals.
+ *
+ * Returns NULL if none found.
+ */
+static struct drm_sched_entity *
+drm_sched_rq_select_entity_fifo(struct drm_sched_rq *rq)
+{
+	struct drm_sched_entity *tmp, *entity = NULL;
+	ktime_t oldest_ts = KTIME_MAX;
+	struct drm_sched_job *sched_job;
+
+	spin_lock(&rq->lock);
+
+	list_for_each_entry(tmp, &rq->entities, list) {
+
+		if (drm_sched_entity_is_ready(tmp)) {
+			sched_job = to_drm_sched_job(spsc_queue_peek(&tmp->job_queue));
+
+			if (ktime_before(sched_job->submit_ts, oldest_ts)) {
Quoted 8 lines

drivers/gpu/drm/scheduler/sched_main.c drm_sched_rq_select_entity(struct drm_sched_rq *rq) · line 259

Quoted 5 lines
drivers/gpu/drm/scheduler/sched_main.c +5 -0
+				oldest_ts = sched_job->submit_ts;
+				entity = tmp;
+			}
+		}
+	}

Here I think we need an O(1) lookup of the next job to pick out to run. I see a number of optimizations, for instance keeping the current/oldest timestamp in the rq struct itself,

This was my original design with rb tree based min heap per rq based on time stamp of
the oldest job waiting in each entity's job queue (head of entity's SPCP job queue). But how in this
case you record the timestamps of all the jobs waiting in entity's the SPCP queue behind the head job ?
If you record only the oldest job and more jobs come you have no place to store their timestamps and so
on next job select after current HEAD how you will know who came before or after between 2 job queues of
of 2 entities ?

Quoted 4 lines

or better yet keeping the next job
to pick out to run at a head of list (a la timer wheel implementation). For suck an optimization to work, you'd prep things up on job insertion, rather than on job removal/pick to run.

I looked at timer wheel and I don't see how this applies here - it assumes you know before
job submission your deadline time for job's execution to start - which we don't so I don't see
how we can use it. This seems more suitable for real time scheduler implementation where you
have a hard requirement to execute a job by some specific time T.

In a timer wheel you instantly know the "soonest" job to run--it's naturally your "next" job, regardless of in what order the timers were added and what their timeout time is.

Quoted 7 lines
Quoted 7 lines
Quoted 7 lines

I also mentioned a list, obviously there is the brute force solution of just ordering all jobs in one giant list and get
naturally a FIFO ordering this way with O(1) insertions and extractions but I assume we don't want one giant jobs queue
for all the entities to avoid more dependeies between them (like locking the entire list when one specific entity is killed and
needs to remove it's jobs from SW queue).

Quoted 3 lines

You can also have a list of list pointers. It'd be trivial to remove a whole list from the main list, by simply removing an element--akin to locking out a rq, or should you need to edit the rq's entity list.

Quoted 6 lines

So you do mean some kind of FIFO list. I really would want to avoid maintaining an
extra data structure, we already have jobs stored in entity SPSC queue, and now we will have to add
to a job struct  a pointer to another,  rq wide FIFO list, seems to me like a recipe for problems.

Maybe.

Quoted 9 lines

Thinking more about it, if I do let each job have it's original submission timestamp stored I can go back to my original design of storing sched entities themself in min heap structure based on timestamp of the next job to run in the entity
(head of job list), this way we get O(1) extraction of next job to run and it will still be FIFO. The cost will be O(log(# entites in rq)) for updating the min heap on each job extraction based on next head timestamp. Still better then linear. On the downside we need to maintain an rb tree structure

O(1) would be ideal, and the "sorting" can be had when the jobs are submitted, which could take O(log N), as in sorting.

But O(log N) on a balanced tree, such as you're using an R-B tree for a min heap, is a great metric and way faster than O(N).

Quoted 2 lines

to store the entitles in parallel to holding them in linear list for round robin as it's tpday.

You could choose to store one way or another, exclusively, depending on what scheduling policy had been chosen.

Quoted 5 lines

I am attaching my original patch to give sense of
it with TODO section were I added this new code. There are actually some corner cases with empty SPCP queue becoming full and sampling not the head of the
queue but the next one is what we need but i think it's solvable.

Your WIP patch looks good.

Quoted 6 lines

In general it seems to me that before doing more complicated design we actually need to measure and see if there is really a substantial performance hit compared to current RR
or even  compared to possible O(1) extraction solution. No point to complicate design if we don't get significant performance improvement from it.

Quoted 4 lines

WLOG, assuming all jobs are ready to be executed, then, for graphics, I'd imagine we'd want to pick the next job to run in O(1) time complexity. However O(log N) is still good and preferable. O(N) is slow. FWIW, the RR we have right now is O(1) given the job readiness assumption above.

You convinced me, going to try to rework my original patch. I asked Yunxiang to measure performance delta anyway, just in case this rework get stuck and then we will just use the primitive linear search for the client needs at least.

Andrey

Quoted 85 lines
Quoted 15 lines
Quoted 15 lines
Quoted 6 lines
Quoted 6 lines
Quoted 6 lines
Quoted 5 lines

I'm also surprised that there is no job transition from one queue to another, as it is picked to run next--for the above optimizations to implemented, you'd want a state transition from (state) queue to queue.

Not sure what you have in mind here ? How this helps ?

I think I've explained this a few times now--each list represents a state and a job/entity travels through lists as it travels through states, which states more or less represent the state of execution in the hardware--it could be as simple as incoming --> pending --> done.

It allows a finer grain when resetting the hardware (should the hardware allow it).

Note that this isn't directly related to the O(1) mechanism I brought up here. As I said, I was surprised to find out none such distinction existed--that's all. Don't fixate on this.

Quoted 8 lines
Quoted 2 lines

Regards,
Luben

Right, so this one is a separate  topic regarding the pending job list refactoring which we need to discuss and fix separately - i have TODO to come back
to your patches from a year ago or so which were addressing this. Probably will try to get to this after finishing this work.

Excellent!

Regards,
Luben

Quoted 57 lines

Andrey

Quoted 54 lines
Quoted 51 lines
Quoted 51 lines
Quoted 51 lines

Andrey

Quoted 3 lines

Regards,
Luben

In my origianl design

Quoted 43 lines
Quoted 43 lines
drivers/gpu/drm/scheduler/sched_main.c +14 -1
+
+	if (entity) {
+		rq->current_entity = entity;
+		reinit_completion(&entity->entity_idle);
+	}
+
+	spin_unlock(&rq->lock);
+	return entity;
+}
+
     /**
      * drm_sched_job_done - complete a job
      * @s_job: pointer to the job which is done
@@ -804,7 +858,10 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
 
     	/* Kernel run queue has higher priority than normal run queue*/
     	for (i = DRM_SCHED_PRIORITY_COUNT - 1; i >= DRM_SCHED_PRIORITY_MIN; i--) {
-		entity = drm_sched_rq_select_entity(&sched->sched_rq[i]);
+		entity = drm_sched_policy != 1 ?
+				drm_sched_rq_select_entity_rr(&sched->sched_rq[i]) :
+				drm_sched_rq_select_entity_fifo(&sched->sched_rq[i]);
+
     		if (entity)
     			break;
     	}
include/drm/gpu_scheduler.h +8 -0
index addb135eeea6..95865881bfcf 100644
@@ -314,6 +314,14 @@ struct drm_sched_job {
 
     	/** @last_dependency: tracks @dependencies as they signal */
     	unsigned long			last_dependency;
+
+       /**
+	* @submit_ts:
+	*
+	* Marks job submit time
+	*/
+       ktime_t				submit_ts;
+
     };
 
Quoted 2 lines
Quoted 2 lines
Quoted 1 line
Quoted 1 line

include/drm/gpu_scheduler.h struct drm_sched_job { · line 327

Quoted 1 line
include/drm/gpu_scheduler.h +0 -0
     static inline bool drm_sched_invalidate_job(struct drm_sched_job *s_job,

Regards,

Regards,

#12 lore raw
In reply to Andrey Grodzovsky
Quoted 13 lines · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on same scheduler an uncceptabliy long wait time for some jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job might execute ealier even though that job arrived later then the job in the long queue.

Quoted 6 lines

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

Instead of ordering based on when jobs are added, might it be possible to order them based on when they become ready to run?

Otherwise it seems possible to e.g. submit a large number of inter-dependent jobs at once, and they would all run before any jobs from another queue get a chance.

Signature · 2 lines
Earthling Michel Dänzer            |                  https://redhat.com
Libre software enthusiast          |         Mesa and Xwayland developer
#13 lore raw
Quoted 20 lines · Michel Dänzer
Quoted 13 lines · Andrey Grodzovsky

Poblem: Given many entities competing for same rq on same scheduler an uncceptabliy long wait time for some jobs waiting stuck in rq before being picked up are observed (seen using GPUVis).
The issue is due to Round Robin policy used by scheduler to pick up the next entity for execution. Under stress of many entities and long job queus within entity some jobs could be stack for very long time in it's entity's queue before being popped from the queue and executed while for other entites with samller job queues a job might execute ealier even though that job arrived later then the job in the long queue.

Quoted 6 lines

Fix:
Add FIFO selection policy to entites in RQ, chose next enitity on rq in such order that if job on one entity arrived ealrier then job on another entity the first job will start executing ealier regardless of the length of the entity's job queue.

Quoted 3 lines

Instead of ordering based on when jobs are added, might it be possible to order them based on when they become ready to run?

Otherwise it seems possible to e.g. submit a large number of inter-dependent jobs at once, and they would all run before any jobs from another queue get a chance.

While any of them is not ready (i.e. still having unfulfilled dependency) this job will not be chosen to run (see drm_sched_entity_is_ready). In this scenario if an earlier job from entity E1 is not ready to run it will be skipped and a later job from entity E2 (which is ready) will be chosen to run  so E1 job is not blocking E2 job. The moment E1 job does become ready it seems to me logical to let it run ASAP as it's by now it spent the most time of anyone waiting for execution, and I don't think it matters that part of this time was because it waited for dependency job to complete it's run.

Andrey

Quoted 2 lines