teuthology : 70 workers need more than 8GB RAM / 2 CPUS
A message that is not in the archive (sent off-list or not yet received): [email protected]
A message that is not in the archive (sent off-list or not yet received): [email protected]
Hi Loic,
This is definitely something to keep an eye on. It's actually a bit surprising to me, though - I haven't seen ansible-playbook use any significant resources in sepia.
I wouldn't really recommend running paddles on the same host as teuthology though, to do any serious amount of testing; some teuthology tasks do use large amounts of RAM and/or CPU, and severe load issues could feasibly cause requests to time out, affecting other jobs.
That's all theory though, as I've always used separate hosts for the two services.
Zack
----- Original Message -----
Quoted 30 lines
From: "Loic Dachary" <[email protected]>
To: "Zack Cerza" <[email protected]>, "Andrew Schoen" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Sunday, July 19, 2015 9:06:41 AM
Subject: Re: teuthology : 70 workers need more than 8GB RAM / 2 CPUSHi again,
I had the same problem when 50 workers kick in at the same time. I've lowered the number of workers down to 25 and it went well. During a few minutes (~8 minutes) the load average stayed around 25 (CPU bound, mainly the ansible playbook competing, see the screenshot of htop). But did not see any error / timeout. then I added 15 workers, wait for the load to go back to < 2 (10 minutes), then 15 more (10 minutes) to get to 55.
That sound like a log of CPU used by a single playbook run. Is there a known way to reduce that ? If not I'll just upgrade the machine. Just want to make sure I'm not missing a simple solution ;-)
Cheers
Quoted 8 lines · Loic Dachary
Hi,
For the record, I launched a rados suite on an idle teuthology cluster, with 70 workers running on a 8GB RAM / 2 CPUS / 40GB SSD disk. The load average reached 40 within a minute or two and some jobs started failing / timeouting. I had pulpito running on the same machine and it failed one time out of two because of the load (see the top image).
Quoted 9 lines
Quoted 5 lines
On friday I was able to run 70 workers because I gradually added them. The load peak is when a job starts and all workers kick in a the same time.
Cheers
--
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html
Thanks for the feedback. I'll try with postgresql as it seems the sqlite modifications did nothing really significant.
Quoted 55 lines · Zack Cerza
Hi Loic,
This is definitely something to keep an eye on. It's actually a bit surprising to me, though - I haven't seen ansible-playbook use any significant resources in sepia.
I wouldn't really recommend running paddles on the same host as teuthology though, to do any serious amount of testing; some teuthology tasks do use large amounts of RAM and/or CPU, and severe load issues could feasibly cause requests to time out, affecting other jobs.
That's all theory though, as I've always used separate hosts for the two services.
Zack
----- Original Message -----
Quoted 30 lines
From: "Loic Dachary" <[email protected]>
To: "Zack Cerza" <[email protected]>, "Andrew Schoen" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Sunday, July 19, 2015 9:06:41 AM
Subject: Re: teuthology : 70 workers need more than 8GB RAM / 2 CPUSHi again,
I had the same problem when 50 workers kick in at the same time. I've lowered the number of workers down to 25 and it went well. During a few minutes (~8 minutes) the load average stayed around 25 (CPU bound, mainly the ansible playbook competing, see the screenshot of htop). But did not see any error / timeout. then I added 15 workers, wait for the load to go back to < 2 (10 minutes), then 15 more (10 minutes) to get to 55.
That sound like a log of CPU used by a single playbook run. Is there a known way to reduce that ? If not I'll just upgrade the machine. Just want to make sure I'm not missing a simple solution ;-)
Cheers
Quoted 8 lines · Loic Dachary
Hi,
For the record, I launched a rados suite on an idle teuthology cluster, with 70 workers running on a 8GB RAM / 2 CPUS / 40GB SSD disk. The load average reached 40 within a minute or two and some jobs started failing / timeouting. I had pulpito running on the same machine and it failed one time out of two because of the load (see the top image).
Quoted 9 lines
Quoted 5 lines
On friday I was able to run 70 workers because I gradually added them. The load peak is when a job starts and all workers kick in a the same time.
Cheers
--
Loïc Dachary, Artisan Logiciel Libre--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html
Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre