dumpling integration branch for v0.67.12 ready for QE

DISCUSSION Loic Dachary 7 participants 25 messages Feb 10, 2015 – Feb 26, 2015

lore
Share & tools
lore
#0 lore raw

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#1 lore raw

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Unless I hear otherwise, I will schedule suites to run on dumpling-backports first (as you are suggesting, with higher priority) and then assuming that we resolved all issues, we will run on the dumpling merged.

Sage, pls correct if this is not what has to be done.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#2 lore raw

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Quoted 26 lines

Unless I hear otherwise, I will schedule suites to run on dumpling-backports first (as you are suggesting, with higher priority) and then assuming that we resolved all issues, we will run on the dumpling merged.

Sage, pls correct if this is not what has to be done.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#3 lore raw

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

Quoted 26 lines

Unless I hear otherwise, I will schedule suites to run on dumpling-backports first (as you are suggesting, with higher priority) and then assuming that we resolved all issues, we will run on the dumpling merged.

Sage, pls correct if this is not what has to be done.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#4 lore raw

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What do you think ?

Quoted 28 lines
Quoted 27 lines

Unless I hear otherwise, I will schedule suites to run on dumpling-backports first (as you are suggesting, with higher priority) and then assuming that we resolved all issues, we will run on the dumpling merged.

Sage, pls correct if this is not what has to be done.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#5 lore raw
Quoted 26 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

Quoted 7 lines

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

Now, as it happens there are some reasons to maintain a dumpling branch that isn't part of backports. We've been doing a lot of work lately to make the nightlies behave well under RHEL and in various other environments, which sometimes involve changing the tests themselves. That can mean updating the ceph.git/qa/workunits in our LTS branches, which I've done a few times over the last couple of months. Since they're used for testing they aren't suitable for going through a backports workflow, we just want them to get into the nightlies as fast as possible. Tossing out any such work every time a point release appears would be irritating, to say the least. (We could also pull the workunits out of ceph.git, but that's a different discussion.)
-Greg

#6 lore raw
Quoted 29 lines · Gregory Farnum
Quoted 28 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

Quoted 8 lines
Quoted 5 lines

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

The dumpling branch is where the point release are published. The dumpling-backports branch is where the point release are developed and tested.

Quoted 13 lines

Now, as it happens there are some reasons to maintain a dumpling branch that isn't part of backports. We've been doing a lot of work lately to make the nightlies behave well under RHEL and in various other environments, which sometimes involve changing the tests themselves. That can mean updating the ceph.git/qa/workunits in our LTS branches, which I've done a few times over the last couple of months. Since they're used for testing they aren't suitable for going through a backports workflow, we just want them to get into the nightlies as fast as possible. Tossing out any such work every time a point release appears would be irritating, to say the least. (We could also pull the workunits out of ceph.git, but that's a different discussion.)

This is a good point. I'm assuming backports rely on the dumpling branch of ceph-qa-suite. And if a change needs to be done in ceph-qa-suite for the benefit of an ongoing backport effort to publish a point release, it will have to be done in such a way that it can work for both the current dumpling and the future point release.

Am I understanding you correctly ?

Cheers

Quoted 2 lines

-Greg

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#7 lore raw
Quoted 17 lines · Loic Dachary
Quoted 13 lines · Gregory Farnum

Now, as it happens there are some reasons to maintain a dumpling branch that isn't part of backports. We've been doing a lot of work lately to make the nightlies behave well under RHEL and in various other environments, which sometimes involve changing the tests themselves. That can mean updating the ceph.git/qa/workunits in our LTS branches, which I've done a few times over the last couple of months. Since they're used for testing they aren't suitable for going through a backports workflow, we just want them to get into the nightlies as fast as possible. Tossing out any such work every time a point release appears would be irritating, to say the least. (We could also pull the workunits out of ceph.git, but that's a different discussion.)

Quoted 3 lines

This is a good point. I'm assuming backports rely on the dumpling branch of ceph-qa-suite. And if a change needs to be done in ceph-qa-suite for the benefit of an ongoing backport effort to publish a point release, it will have to be done in such a way that it can work for both the current dumpling and the future point release.

Am I understanding you correctly ?

No, I mean we are (unfortunately) actually changing the ceph.git dumpling branch in order to update the tests we run so they succeed in new environments. Those changes aren't going through backports testing, because we want to verify that they're working in our regular nightlies ASAP and don't want to wait for the backports branch to merge for them to take effect in giving us successful tests. Look at...wow, pick a commit on the first screen of the current dumpling branch.

Also, as Sage mentions we actually run the dumpling branch in the nightlies and using that as integration testing. I think it's appropriate to keep doing so; otherwise we need to run every patch through every suite *enough times to be sure we've not added a bug that's hard to reproduce*. If we use dumpling as an integration branch for backports that can be tested en-masse but independently we get a lot more test coverage of them prior to releases.
-Greg

#8 lore raw
In reply to Gregory Farnum
Quoted 29 lines · Gregory Farnum
Quoted 28 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

Quoted 8 lines
Quoted 5 lines

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

Yeah, it seems to me like the same general process we use for 'next' and 'master' would work here:

- prepare a batch of backports, say dumpling-rgw-next
- run it through the rgw suite
- if that is okay, merge to dumpling
- run regular tests on dumpling (all suites)

so that dumpling acts as in integration branch the same way the others do. This is reasonably lightweight on process and means that our periodic scheduled runs are doing double duty for the integration testing and catching long-tail bugs.

After talking through the last release vs 'next' branch race with Alfredo I think (?) we've established that it is a non-issue. If a release build races with a branch update it shows up as a merge commit in the history (just like a regular 'git pull').

Unless we're specifically concerned about things landing in dumpling (or whatever) just prior to a release?

sage

#9 lore raw

Hi,

That's too much information for me to digest quickly. Instead of stalling I will go ahead and merge the dumpling pull requests into the dumpling branch so that Yuri can proceed. And I'll take time to revise my understanding of the backport workflow with your input.

Cheers

Quoted 62 lines · Sage Weil
Quoted 29 lines · Gregory Farnum
Quoted 28 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

Quoted 8 lines
Quoted 5 lines

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

Yeah, it seems to me like the same general process we use for 'next' and 'master' would work here:

- prepare a batch of backports, say dumpling-rgw-next
- run it through the rgw suite
- if that is okay, merge to dumpling
- run regular tests on dumpling (all suites)

so that dumpling acts as in integration branch the same way the others do. This is reasonably lightweight on process and means that our periodic scheduled runs are doing double duty for the integration testing and catching long-tail bugs.

After talking through the last release vs 'next' branch race with Alfredo I think (?) we've established that it is a non-issue. If a release build races with a branch update it shows up as a merge commit in the history (just like a regular 'git pull').

Unless we're specifically concerned about things landing in dumpling (or whatever) just prior to a release?

sage

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#10 lore raw

Great!

As soon as it's merged I will schedule suite to run as listed somewhere below ...

dumpling with higher priority and then giant.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Sage Weil" <[email protected]>, "Gregory Farnum" <[email protected]>
Cc: "Yuri Weinstein" <[email protected]>, "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 11:06:43 AM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Hi,

That's too much information for me to digest quickly. Instead of stalling I will go ahead and merge the dumpling pull requests into the dumpling branch so that Yuri can proceed. And I'll take time to revise my understanding of the backport workflow with your input.

Cheers

Quoted 62 lines · Sage Weil
Quoted 29 lines · Gregory Farnum
Quoted 28 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

Quoted 8 lines
Quoted 5 lines

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

Yeah, it seems to me like the same general process we use for 'next' and 'master' would work here:

- prepare a batch of backports, say dumpling-rgw-next
- run it through the rgw suite
- if that is okay, merge to dumpling
- run regular tests on dumpling (all suites)

so that dumpling acts as in integration branch the same way the others do. This is reasonably lightweight on process and means that our periodic scheduled runs are doing double duty for the integration testing and catching long-tail bugs.

After talking through the last release vs 'next' branch race with Alfredo I think (?) we've established that it is a non-issue. If a release build races with a branch update it shows up as a merge commit in the history (just like a regular 'git pull').

Unless we're specifically concerned about things landing in dumpling (or whatever) just prior to a release?

sage

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#11 lore raw

Hi,

The dumpling branch now contains the commits that were in the dumpling-backports branch, they have been merged.

https://github.com/ceph/ceph/commit/77dfbbaccfb5074899d02314a26cb9ac46a69106

is the head of the dumpling branch I'm refering to.

Cheers

Quoted 86 lines · Yuri Weinstein

Great!

As soon as it's merged I will schedule suite to run as listed somewhere below ...

dumpling with higher priority and then giant.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Sage Weil" <[email protected]>, "Gregory Farnum" <[email protected]>
Cc: "Yuri Weinstein" <[email protected]>, "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 11:06:43 AM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Hi,

That's too much information for me to digest quickly. Instead of stalling I will go ahead and merge the dumpling pull requests into the dumpling branch so that Yuri can proceed. And I'll take time to revise my understanding of the backport workflow with your input.

Cheers

Quoted 62 lines · Sage Weil
Quoted 29 lines · Gregory Farnum
Quoted 28 lines · Loic Dachary

On 10/02/2015 18:29, Yuri Weinstein wrote:>

Quoted 9 lines

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

Loic - I feel that finial QE validation should be done on the code that gets actually released to customers, e.g. dumpling branch after the merge. I do see your point about branches being identical and ready to change my mind if you insist. Does my reasoning make sense? Please advice, how we should proceed.

The dumpling-backports branch currently is at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

after a successful test run from QE and a merge into dumpling, the dumpling branch will be at

https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

as well. In other words they are identical and there is no point in running a test again. The only reason why they could be different is if a commit is inadvertently added to the dumpling branch while testing happens on the dumpling-backport branc. In this case the presence of this new commit would be reason enough to run another round of test indeed. So the process could be:

If tests are ok and merge can fast forward, then release.
If tests are ok and merge cannot fast forward, send back to loic because a commit was added by accident and needs to be approved by the leads.

If testing happens on the dumpling branch, adding a commit to the dumpling branch would have side effects that could taint the results of the tests or, even worse, go unnoticed. There is zero chance that someone adds a commit to the dumpling-backports branch and that gives us something stable. On the contrary, the odds that someone adds a commit to the dumpling branch are high, specially if the tests take a few weeks to complete.

Quoted 8 lines
Quoted 5 lines

As Greg mentioned, merging in dumpling does not matter much for this round because it is what has been done in the past. And to be honest, I would not mind if an additional commit taints the process by accident. However, unless there is a reason not to, it would be good to establish a process that is solid if we can.

I've witnessed Alfredo's pain on each release and an additional benefit of having a dumpling-backports branch that nobody tampers with just occured to me. When and if QE finds that dumpling-backports is fit for release, instead of merging it into dumpling it could be handed over to Alfredo for release. And he would be able to proceed knowing it is stable and won't be moving forward. Once the release is done and the tag set to the proper commit, the dumpling branch can be reset to dumpling-backports. If commits were added during the process, their authors could be notified that they were discarded and need to be merge again. That would not work for the master branch but it would definitely be possible for the stable branches because such "out of process" commits are rarely added.

I've not thought this through, but the more I think about it the more I like the idea of using dumpling-backports as a staging area until the release is final.

What's the purpose of even having a dumpling branch at that point? We're not using it for anything under your model.

Yeah, it seems to me like the same general process we use for 'next' and 'master' would work here:

- prepare a batch of backports, say dumpling-rgw-next
- run it through the rgw suite
- if that is okay, merge to dumpling
- run regular tests on dumpling (all suites)

so that dumpling acts as in integration branch the same way the others do. This is reasonably lightweight on process and means that our periodic scheduled runs are doing double duty for the integration testing and catching long-tail bugs.

After talking through the last release vs 'next' branch race with Alfredo I think (?) we've established that it is a non-issue. If a release build races with a branch update it shows up as a merge commit in the history (just like a regular 'git pull').

Unless we're specifically concerned about things landing in dumpling (or whatever) just prior to a release?

sage

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#12 lore raw
In reply to Loic Dachary
Quoted 9 lines · Loic Dachary

On 10/02/2015 18:19, Yuri Weinstein wrote:>

Quoted 4 lines

Loic,

The only difference between options if we run suits on merged dumpling vs dumpling-backports first - is time. We will have to run suites on the final branch after the merge anyway.

Could you explain why ? After merging dumpling and dumpling-backports will be exactly the same.

"Ship what you test." :) That definitely needs to happen.

I don't have a dog in this, but given our historic usage patterns and the testing it's already gone through I think it's probably fine to do the merge and then final testing.
-Greg

#13 lore raw
In reply to Loic Dachary

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#14 lore raw
Quoted 65 lines · Yuri Weinstein

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

Quoted 5 lines

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.

At the moment I have nothing.

Quoted 1 line

PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

If that's ok with you I'd rather check the tickets that you re-opened or filed at the end of the tests, all at once (just make sure such tickets have the backport field mentionning "dumpling" or I may miss them). However, if you need my input on a specific ticket feel free to ask.

Thanks !

Quoted 20 lines

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#16 lore raw
In reply to Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#17 lore raw
Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 103 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#18 lore raw

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

rbd - Josh, I understood that we are good to go, pls re-confirm.

I can re-run some suites if you'd like and we can make a call on this release.

Loic - back to you, let me know what you think.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Thursday, February 12, 2015 2:17:49 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 103 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#19 lore raw

Yup, 10694 is a known bug in dumpling which we probably don't want to fix. The rados tests look ok to me I think.
-Sam

Quoted 139 lines · Yuri Weinstein

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

rbd - Josh, I understood that we are good to go, pls re-confirm.

I can re-run some suites if you'd like and we can make a call on this release.

Loic - back to you, let me know what you think.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Thursday, February 12, 2015 2:17:49 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 95 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

Quoted 8 lines

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Quoted 6 lines

--
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html

--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html

#20 lore raw
In reply to Yuri Weinstein
Quoted 8 lines · Yuri Weinstein

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

Quoted 5 lines

rbd - Josh, I understood that we are good to go, pls re-confirm.

I can re-run some suites if you'd like and we can make a call on this release.

Loic - back to you, let me know what you think.

As long as you're satisfied with the test results, I have no further comment :-)

Cheers

Quoted 125 lines

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Thursday, February 12, 2015 2:17:49 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 103 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#21 lore raw

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 18, 2015 9:56:14 AM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 9 lines · Yuri Weinstein

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

rbd - Josh, I understood that we are good to go, pls re-confirm.

Yes, good to go from my perspective.

#22 lore raw
In reply to Yuri Weinstein

All issues in http://tracker.ceph.com/issues/10560 updated.

Loic - #10801 can be resolved.

v0.67.12 ready for release.

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Wednesday, February 18, 2015 9:38:19 AM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

rbd - Josh, I understood that we are good to go, pls re-confirm.

I can re-run some suites if you'd like and we can make a call on this release.

Loic - back to you, let me know what you think.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Thursday, February 12, 2015 2:17:49 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 103 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 5 lines
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
#23 lore raw
Quoted 3 lines · Yuri Weinstein

All issues in http://tracker.ceph.com/issues/10560 updated.

Loic - #10801 can be resolved.

Nice, thanks for the update !

Quoted 152 lines

v0.67.12 ready for release.

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Wednesday, February 18, 2015 9:38:19 AM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Hi all

I updated all issues in http://tracker.ceph.com/issues/10560

Based on what is listed there, we have
http://tracker.ceph.com/issues/10801 - Yehuda pls comment
http://tracker.ceph.com/issues/10694 - Sam pls re-confirm

rbd - Josh, I understood that we are good to go, pls re-confirm.

I can re-run some suites if you'd like and we can make a call on this release.

Loic - back to you, let me know what you think.

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>, "Zack Cerza" <[email protected]>, "Sandon Van Ness" <[email protected]>
Sent: Thursday, February 12, 2015 2:17:49 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

Quoted 5 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Sure :-)

Quoted 103 lines

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Cheers

Signature · 1 line
Loïc Dachary, Artisan Logiciel Libre
#24 lore raw
In reply to Yuri Weinstein

Yeah, the rados run had too much environmental noise to be useful. -Sam

Quoted 106 lines · Yuri Weinstein

I linked all issues related to this release testing to the ticket http://tracker.ceph.com/issues/10560

After the team leads make a call of those, including environment issues, I suggest re-running suites the failed again.

Loic, I'd re-run them in the Octo, since we already started there, if you agree ?

Thx
YuriW

----- Original Message -----
From: "Yuri Weinstein" <[email protected]>
To: "Loic Dachary" <[email protected]>
Cc: "Ceph Development" <[email protected]>, "Sage Weil" <[email protected]>, "Tamil Muthamizhan" <[email protected]>
Sent: Wednesday, February 11, 2015 2:24:33 PM
Subject: Re: dumpling integration branch for v0.67.12 ready for QE

I replied to individual suites runs, but just wanted to summarize QE validation status.

The following suites were executed in the Octo lab (we will use Sepia in the future if nobody objects).

upgrade:dumpling
================
['45493']
http://tracker.ceph.com/issues/10694 - Known "Won't fix" "Assertion: osd/Watch.cc: 290: FAILED assert(!cb)"

*** Sam - pls confirm the "Won't fix" status.

['45495', '45496', '45498', '45499', '45500']
http://tracker.ceph.com/issues/10838
"s3tests failed"

*** Yehuda - need your verdict on s3tests.

fs
================
All green !

rados
================
['45054']
http://tracker.ceph.com/issues/10841
"Issued certificate has expired"
*** Sandon pls comment.

['45168', '45169']
http://tracker.ceph.com/issues/10840
coredump "ceph_test_filestore_idempotent_sequence" *** Sam - pls comment

['45215']
Missing packages - no ticket FYI
"Failed to fetch http://apt-mirror.front.sepia.ceph.com/archive.ubuntu.com/ubuntu/dists/trusty-updates/universe/binary-i386/Packages Hash Sum mismatch"

*** Zack, Sandon ?

ceph-deploy
================

Travis - pls suggest
In general I am not sure if we needed to test this - Sage?

rbd
================
['45365', '45366', '45367']
http://tracker.ceph.com/issues/10842
"unable to connect to apt-mirror.front.sepia.ceph.com"

['45349', '45350', '45351', '45355', '45356', '45357', '45363']
http://tracker.ceph.com/issues/10802
"error: image still has watchers"
(duplicate of 10680)

*** Zack, Sandon, Josh - all environment noise, pls comment.

rgw
================
['45382', '45390']
http://tracker.ceph.com/issues/10843
"s3tests failed" - could be related or duplicate of 10838

*** Yehuda - same as issues in upgrades?

I am standing by for you analysis/replies and recommendations for next steps.

Loic - let me know is you want to follow specific items in our backport testing process that I missed here.
PS: I would think that you could've wanted to assign the release ticket to QE (me) for validation and at this point I could've re-assigned it back to devel (you), a?

Thx
YuriW

----- Original Message -----
From: "Loic Dachary" <[email protected]>
To: "Yuri Weinstein" <[email protected]>
Cc: "Ceph Development" <[email protected]>
Sent: Tuesday, February 10, 2015 9:05:31 AM
Subject: dumpling integration branch for v0.67.12 ready for QE

Hi Yuri,

The dumpling integration branch for v0.67.12 as found at https://github.com/ceph/ceph/commits/dumpling-backports has been approved by Yehuda, Josh and Sam and is ready for QE.

For the record, the head is https://github.com/ceph/ceph/commit/3944c77c404c4a05886fe8276d5d0dd7e4f20410

I think it would be best for the QE tests to use the dumpling-backports. The alternative would be to merge dumpling-backports into dumpling. However, since testing may take a long time and require more patches, it probably is better to not do that iterative process on the dumpling branch itself. As it is now, there already are a number of commits in the dumpling branch that should really be in the dumpling-backports: they do not belong to v0.67.11 and are going to be released in v0.67.12. In the future though, the dumpling branch will only receive commits that have been carefully tested and all the integration work will be on the dumpling-backports branch exclusively. So that third parties do not have to worry that the dumpling branch contains commits that have not been tested yet.

Quoted 8 lines

Cheers

--
Loïc Dachary, Artisan Logiciel Libre
--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html

--
To unsubscribe from this list: send the line "unsubscribe ceph-devel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html