Hi Ingo,

the patch eliminating the frozen_lock which went into 2.5.22 requires macros for prepare_arch_schedule(), etc... On IA64 I think that we need to use the "complex" macros, otherwise there is a potential deadlock.

Unfortunately the "complex" macros seem to have the problem that the "prev" task can be stolen right before the context switch. In your description to

Quoted 11 lines · the patch you

architectures that need to unlock the runqueue before doing the switch can do the following:

 #define prepare_arch_schedule(prev)             task_lock(prev)
 #define finish_arch_schedule(prev)              task_unlock(prev)
 #define prepare_arch_switch(rq)                 spin_unlock(&(rq)->lock)
 #define finish_arch_switch(rq)                  __sti()

this way the task-lock makes sure that a task is not scheduled on some other CPU before the switch-out finishes, but the runqueue lock is dropped.

Suppose we have
cpu1: idle1
cpu2: prev2 -> next2 (in the switch)

I don't understand how task_lock(prev2) done on cpu2 can prevent cpu1 to schedule prev2, which it stole after the RQ#2 lock release. It will just try to task_lock(idle1), which will be successfull.

The problems I have are with a small and ugly testprogram which generates
128 threads which all just do system("exit"); Running this program
continuously sooner or later leads to attempts to switch to tasks which have already exited. Inserting a small udelay after prepare_arch_switch reveals the problem earlier.

I also tried inserting "while (spin_is_locked(&(next)->alloc_lock));" but it didn't help.

Any idea how to fix this problem?

Thanks a lot in advance,
best regards,

Erich

PS: Below is the relevant part of schedule():

	prepare_arch_schedule(prev);
...
	if (likely(prev != next)) {
		rq->nr_switches++;
		rq->curr = next;
		prepare_arch_switch(rq);
		//while (spin_is_locked(&(next)->alloc_lock));
		prev = context_switch(prev, next);
		barrier();
		rq = this_rq();
		finish_arch_switch(rq);
	} else
		spin_unlock_irq(&rq->lock);

finish_arch_schedule(prev);

PPS: The potential deadlock on IA64 for the "simple" macros comes from the fact that we sometimes wrap the context counter and need to read_lock(tasklist_lock). Doing this without releasing the RQ can lead to a deadlock with sys_wait4, where a write_lock(&tasklist_lock) is needed, inside of which a __wake_up needs the RQ lock :-(

#1 lore raw
Quoted 7 lines · Erich Focht

Suppose we have
cpu1: idle1
cpu2: prev2 -> next2 (in the switch)

I don't understand how task_lock(prev2) done on cpu2 can prevent cpu1 to schedule prev2, which it stole after the RQ#2 lock release. It will just try to task_lock(idle1), which will be successfull.

you are right - the 'complex' macros also need to lock the 'next' task, not only the 'previous' task - but to do that deadlock-free, they need to drop the runqueue lock ...

Ingo

#2 lore raw

the best solution might be to just lock the 'next' task - this needs a new per-task irq-safe spinlock, to avoid deadlocks. This way whenever a task is in the middle of a context-switch it cannot be scheduled on another CPU.

in fact this solution simplifies things - only two per-arch macros are needed. I've done this in my current 2.5.25 tree:

	http://redhat.com/~mingo/O(1)-scheduler/sched-2.5.25-A4

check out the sparc64 changes for the 'complex' locking scenario - it's untested, please give it a go on ia64, does that solve your problems? x86 is tested and works just fine.

Ingo

#3 lore raw

Hi Ingo,

thanks for the quick response!

Quoted 4 lines

the best solution might be to just lock the 'next' task - this needs a new per-task irq-safe spinlock, to avoid deadlocks. This way whenever a task is in the middle of a context-switch it cannot be scheduled on another CPU.

We tested this and it looked good. But inserting a udelay(100) like:

	...
	prepare_arch_switch(rq, next);
	udelay(100);
	prev = context_switch(prev, next);
	...

leads to a crash after 10 minutes. Again this looks like accessing an empty page.

Does anything speak against such a test? It is there just to show up quickly problems which we might normally get only after hours of running.

Regards,
Erich

#4 lore raw
Quoted 5 lines · Erich Focht
Quoted 4 lines

the best solution might be to just lock the 'next' task - this needs a new per-task irq-safe spinlock, to avoid deadlocks. This way whenever a task is in the middle of a context-switch it cannot be scheduled on another CPU.

Quoted 8 lines

We tested this and it looked good. But inserting a udelay(100) like:

	...
	prepare_arch_switch(rq, next);
	udelay(100);
	prev = context_switch(prev, next);
	...

leads to a crash after 10 minutes. Again this looks like accessing an empty page.

there is one more detail - wait_task_inactive() needs to consider the ->switch_lock as well - otherwise exit() might end up freeing the pagetables earlier than the context-switch has truly finished. The udelay(100) test should trigger this race.

i've fixed this and uploaded the -A8 patch:

        http://redhat.com/~mingo/O(1)-scheduler/sched-2.5.25-A8

does this fix the ia64 crashes? you need to define an ia64-specific task_running(rq, p) macro, which should be something like:

 #define task_running(rq, p) \
	((rq)->curr == (p)) && !spin_is_locked(&(p)->switch_lock)

a number of other places needed to be updated to use the task_running() macro. For load_balance() and set_cpus_allowed() it's technically not necessery, but i've added it to make things cleaner and safer for the time being.

the default locking is still as lightweight as it used to be.

Quoted 3 lines

Does anything speak against such a test? It is there just to show up quickly problems which we might normally get only after hours of running.

the udelay() test should be fine otherwise. (as long as ia64 udelay doesnt do anything weird.)

Ingo

#5 lore raw
Quoted 3 lines
 #define task_running(rq, p) \
	((rq)->curr == (p)) && !spin_is_locked(&(p)->switch_lock)

one more implementational note: the above test is not 'sharp' in the sense that on SMP it's only correct (the test has no barriers) if the runqueue lock is held. This is true for all the critical task_running() uses in sched.c - and the cases that use it outside the runqueue lock are optimizations so they dont need an exact test.

Ingo

#6 lore raw

Hi!

Quoted 8 lines
Quoted 2 lines
 #define task_running(rq, p) \
	((rq)->curr == (p)) && !spin_is_locked(&(p)->switch_lock)

one more implementational note: the above test is not 'sharp' in the sense that on SMP it's only correct (the test has no barriers) if the runqueue lock is held. This is true for all the critical task_running() uses in sched.c - and the cases that use it outside the runqueue lock are optimizations so they dont need an exact test.

I believe this is worth a *big fat* comment.
Pavel

Signature · 2 lines
Worst form of spam? Adding advertisment signatures ala sourceforge.net.
What goes next? Inserting advertisment *into* email?
#8 lore raw

Ingo,

the last fix survived one night of testing with included udelay(100), so I would consider it stable. Thanks again!

The performance with the new "complex" macros is as expected worse than with the simple ones, we see 10% in some cases, which is hurting a lot. Would you please consider moving the location of the switch_lock from the end of the task_struct to the hot area near the scheduler related variables? The effect may vary depending on the cache line size but having it behind *array or sleep_timestamp would probably save us a cache miss here.

Regards,
Erich

#9 lore raw
In reply to Ingo Molnar

Hi Ingo,

Quoted 10 lines

there is one more detail - wait_task_inactive() needs to consider the ->switch_lock as well - otherwise exit() might end up freeing the pagetables earlier than the context-switch has truly finished. The udelay(100) test should trigger this race.

i've fixed this and uploaded the -A8 patch:

        http://redhat.com/~mingo/O(1)-scheduler/sched-2.5.25-A8

does this fix the ia64 crashes? you need to define an ia64-specific

looks good! Rock solid despite udelay. Though a bit slower than before...

Thanks a lot for the help!