ATM issue: one Host Four Nodes

DISCUSSION [email protected] 2 participants 2 messages Sep 5, 2002

lore
Share & tools
lore
#0 lore raw

Hi all,
We just have such a system to build.

                                ________
                                |      |
                            RX  | ATM  |_TX____________________________
  |---------------------------->| HOST |                              |
  |                             |      |                              |
  |                             |______|                              |
  |                                                                   |
  |      ________       ________        ________       ________       |
  |      |      |       |      |        |      |       |      |       |
  |   TX | ATM  | RX  TX| ATM  | RX   TX| ATM  | RX  TX| ATM  |  RX   |
  |------| NODE |<------| NODE |<-------| NODE |<------| NODE |<------|
         |      |       |      |        |      |       |      |
         |______|       |______|        |______|       |______|
             A              B               C              D

It's used to perform high speed data acqusition.
ATM HOST -- a pc with an ATM card
ATM NODE -- MPC860 with linux-2.4.4

The ATM HOST is responisble for sending controlling information to ATM NODEs and receiving data from each NODEs.
The ATM NODE is responsible for performing data acqusition.

As the diagram show,ATM NODEs are connected one after another.
we use one VPI/VCI to identify one ATM NODE, so if the ATM HOST send the control message to ATM NODE D, the message will touch ATM NODE A��B��C first, then ATM NODE D. In order to improve the system capacity and efficiency, the ATM NODE A��B��C should ignore this message(not parse it) and send it to the next node, in another words, this message should be bypassed in low level(e.g. PHY level) by ATM NODE A��B��C. How can i get this point? Any advice will be greatly appreciated!
Best Regards!
Li

** Sent via the linuxppc-embedded mail list. See http://lists.linuxppc.org/

#1 lore raw

On Thu, 5 Sep 2002, wrote:

In each NODE set up 1 terminated VC, and 3 switched VCs (using the atm-860.o specific /proc/net/atm/switch interface).

here's an example of how to set up a switched VC from 0.0.32 to 0.0.32 using the atm-860.o driver:

echo add 0.0.32 0.0.32 1000 cbr > /proc/net/atm/switch

           ^      ^     ^    ^
         from-VC to-VC  PCR  TT

See http://mpc860sar.sourceforge.net for the source code.

Alex

BTW: If you're board only has one PHY then you need an ATM switch in the middle to create the ring topology. If it's multi PHY then you will need to modify the atm-860.o driver because it doesn't support this yet. (I think that multi-PHY is only available on MPC862s anyway....)

Quoted 25 lines

Hi all,
We just have such a system to build.

                                ________
                                |      |
                            RX  | ATM  |_TX____________________________
  |---------------------------->| HOST |                              |
  |                             |      |                              |
  |                             |______|                              |
  |                                                                   |
  |      ________       ________        ________       ________       |
  |      |      |       |      |        |      |       |      |       |
  |   TX | ATM  | RX  TX| ATM  | RX   TX| ATM  | RX  TX| ATM  |  RX   |
  |------| NODE |<------| NODE |<-------| NODE |<------| NODE |<------|
         |      |       |      |        |      |       |      |
         |______|       |______|        |______|       |______|
             A              B               C              D

It's used to perform high speed data acqusition.
ATM HOST -- a pc with an ATM card
ATM NODE -- MPC860 with linux-2.4.4

The ATM HOST is responisble for sending controlling information to ATM NODEs and receiving data from each NODEs.
The ATM NODE is responsible for performing data acqusition.

Quoted 13 lines

As the diagram show,ATM NODEs are connected one after another.
we use one VPI/VCI to identify one ATM NODE, so if the ATM HOST send the control message to ATM NODE D, the message will touch ATM NODE A¡¢B¡¢C first, then ATM NODE D. In order to improve the system capacity and efficiency, the ATM NODE A¡¢B¡¢C should ignore this message(not parse it) and send it to the next node, in another words, this message should be bypassed in low level(e.g. PHY level) by ATM NODE A¡¢B¡¢C. How can i get this point? Any advice will be greatly appreciated!
Best Regards!
Li