sched/rt: Add comments describing the RT IPI pull method
Steven Rostedt
reviewerPATCH v2 1/1 sched/rt: Add comments describing the RT IPI pull method
From: "Steven Rostedt (VMware)" <[email protected]>
While looking into optimizations for the RT scheduler IPI logic, I realized that the comments are lacking to describe it efficiently. It deserves a lengthy description describing its design.
---
Changes since v1.
Added updates to hopefully handle Peter's comments.
kernel/sched/rt.c | 63 +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 63 insertions(+)
kernel/sched/rt.c +81 -0
@@ -1928,6 +1928,87 @@ static int find_next_push_cpu(struct rq#define RT_PUSH_IPI_EXECUTING 1#define RT_PUSH_IPI_RESTART 2 +/* +* When a high priority task schedules out from a CPU and a lower priority +* task is scheduled in, a check is made to see if there's any RT tasks +* on other CPUs that are waiting to run because a higher priority RT task +* is currently running on its CPU. In this case, the CPU with multiple RT +* tasks queued on it (overloaded) needs to be notified that a CPU has opened +* up that may be able to run one of its non-running queued RT tasks. +* +* On large CPU boxes, there's the case that several CPUs could schedule +* a lower priority task at the same time, in which case it will look for +* any overloaded CPUs that it could pull a task from. To do this, the runqueue +* lock must be taken from that overloaded CPU. Having 10s of CPUs all fighting +* for a single overloaded CPU's runqueue lock can produce a large latency. +* (This has actually been observed on large boxes running cyclictest). +* Instead of taking the runqueue lock of the overloaded CPU, each of the +* CPUs that scheduled a lower priority task simply sends an IPI to the +* overloaded CPU. An IPI is much cheaper than taking an runqueue lock with +* lots of contention. The overloaded CPU will look to push its non-running +* RT task off, and if it does, it can then ignore the other IPIs coming +* in, and just pass those IPIs off to any other overloaded CPU. +* +* When a CPU schedules a lower priority task, it only sends an IPI to +* the "next" CPU that has overloaded RT tasks. This prevents IPI storms, +* as having 10 CPUs scheduling lower priority tasks and 10 CPUs with +* RT overloaded tasks, would cause 100 IPIs to go out at once. +* +* The overloaded RT CPU, wher receiving an IPI, will try to push off its +* overloaded RT tasks and then send an IPI to the next CPU that has +* overloaded RT tasks. This stops when all CPUs with overloaded RT tasks +* have completed. Just because a CPU may have pushed off its own overloaded +* RT task does not mean it should stop sending the IPI around to other +* overloaded CPUs. There may be another RT task waiting to run on one of +* those CPUs that are of higher priority than the one that was just +* pushed. +* +* An optimization that could possibly be made is to make a CPU array similar +* to the cpupri array mask of all running RT tasks, but for the overloaded +* case, then the IPI could be sent to only the CPU with the highest priority +* RT task waiting, and that CPU could send off further IPIs to the CPU with +* the next highest waiting task. Since the overloaded case is much less likely +* to happen, the complexity of this implementation may not be worth it. +* Instead, just send an IPI around to all overloaded CPUs. +* +* The rq->rt.push_flags holds the status of the IPI that is going around. +* A run queue can only send out a single IPI at a time. The possible flags +* for rq->rt.push_flags are: +* +* (None or zero): No IPI is going around for the current rq +* RT_PUSH_IPI_EXECUTING: An IPI for the rq is being passed around +* RT_PUSH_IPI_RESTART: The priority of the running task for the rq +* has changed, and the IPI should restart +* circulating the overloaded CPUs again. +* +* rq->rt.push_cpu contains the CPU that is being sent the IPI. It is updated +* before sending to the next CPU. +* +* Instead of having all CPUs that schedule a lower priority task send +* an IPI to the same "first" CPU in the RT overload mask, they send it +* to the next overloaded CPU after their own CPU. This helps distribute +* the work when there's more than one overloaded CPU and multiple CPUs +* scheduling in lower priority tasks. +* +* When an rq schedules a lower priority task than what was currently +* running, the next CPU with overloaded RT tasks is examined first. +* That is, if CPU 1 and 5 are overloaded, and CPU 3 schedules a lower +* priority task, it will send an IPI first to CPU 5, then CPU 5 will +* send to CPU 1 if it is still overloaded. CPU 1 will clear the +* rq->rt.push_flags if RT_PUSH_IPI_RESTART is not set. +* +* The first CPU to notice IPI_RESTART is set, will clear that flag and then +* send an IPI to the next overloaded CPU after the rq->cpu and not the next +* CPU after push_cpu. That is, if CPU 1, 4 and 5 are overloaded when CPU 3 +* schedules a lower priority task, and the IPI_RESTART gets set while the +* handling is being done on CPU 5, it will clear the flag and send it back to +* CPU 4 instead of CPU 1. +* +* Note, the above logic can be disabled by turning off the sched_feature +* RT_PUSH_IPI. Then the rq lock of the overloaded CPU will simply be +* taken by the CPU requesting a pull and the waiting RT task will be pulled +* by that CPU. This may be fine for machines with few CPUs. +*/ static void tell_cpu_to_push (struct rq *rq) {int cpu;
Peter Zijlstra
maintainerQuoted 1 line · Steven Rostedt
+ * The overloaded RT CPU, wher receiving an IPI, will try to push off its
"wher" isn't in my dictionary, I'm thinking you mean: "when". Fixed that for you.
Quoted 7 lines
+ * overloaded RT tasks and then send an IPI to the next CPU that has
+ * overloaded RT tasks. This stops when all CPUs with overloaded RT tasks
+ * have completed. Just because a CPU may have pushed off its own overloaded
+ * RT task does not mean it should stop sending the IPI around to other
+ * overloaded CPUs. There may be another RT task waiting to run on one of
+ * those CPUs that are of higher priority than the one that was just
+ * pushed.
Quoted 8 lines
+ *
+ * An optimization that could possibly be made is to make a CPU array similar
+ * to the cpupri array mask of all running RT tasks, but for the overloaded
+ * case, then the IPI could be sent to only the CPU with the highest priority
+ * RT task waiting, and that CPU could send off further IPIs to the CPU with
+ * the next highest waiting task. Since the overloaded case is much less likely
+ * to happen, the complexity of this implementation may not be worth it.
+ * Instead, just send an IPI around to all overloaded CPUs.
Yeah, not sure, I'll leave it in though.
Steven Rostedt
reviewerQuoted 5 lines · On Wed, 1 Mar 2017 10:44:09 +0100 Peter Zijlstra <[email protected]> wrote:
Quoted 1 line · Steven Rostedt
+ * The overloaded RT CPU, wher receiving an IPI, will try to push off its
"wher" isn't in my dictionary, I'm thinking you mean: "when". Fixed that for you.
Heh, thanks. Hmm, I looked at all the highlighted words when I pulled in the patch into claws-mail. I'm surprised I missed that.
Quoted 17 lines
Quoted 16 lines
+ * overloaded RT tasks and then send an IPI to the next CPU that has
+ * overloaded RT tasks. This stops when all CPUs with overloaded RT tasks
+ * have completed. Just because a CPU may have pushed off its own overloaded
+ * RT task does not mean it should stop sending the IPI around to other
+ * overloaded CPUs. There may be another RT task waiting to run on one of
+ * those CPUs that are of higher priority than the one that was just
+ * pushed.
+ *
+ * An optimization that could possibly be made is to make a CPU array similar
+ * to the cpupri array mask of all running RT tasks, but for the overloaded
+ * case, then the IPI could be sent to only the CPU with the highest priority
+ * RT task waiting, and that CPU could send off further IPIs to the CPU with
+ * the next highest waiting task. Since the overloaded case is much less likely
+ * to happen, the complexity of this implementation may not be worth it.
+ * Instead, just send an IPI around to all overloaded CPUs.
Quoted 1 line
Yeah, not sure, I'll leave it in though.
OK,
Thanks!
-- Steve
tip-bot for Steven Rostedt (VMware)
merge botsched/rt: Add comments describing the RT IPI pull method
Commit-ID: 3e777f9909483b603946685d88acfae89f31b07b Gitweb: http://git.kernel.org/tip/3e777f9909483b603946685d88acfae89f31b07b Author: Steven Rostedt (VMware) <[email protected]> AuthorDate: Tue, 28 Feb 2017 15:50:30 -0500 Committer: Ingo Molnar <[email protected]> CommitDate: Thu, 16 Mar 2017 09:41:35 +0100
sched/rt: Add comments describing the RT IPI pull method
While looking into optimizations for the RT scheduler IPI logic, I realized that the comments are lacking to describe it efficiently. It deserves a lengthy description describing its design.
--- kernel/sched/rt.c | 81 +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 81 insertions(+)
kernel/sched/rt.c +81 -0
@@ -1927,6 +1927,87 @@ static int find_next_push_cpu(struct rq *rq)#define RT_PUSH_IPI_EXECUTING 1#define RT_PUSH_IPI_RESTART 2 +/* +* When a high priority task schedules out from a CPU and a lower priority +* task is scheduled in, a check is made to see if there's any RT tasks +* on other CPUs that are waiting to run because a higher priority RT task +* is currently running on its CPU. In this case, the CPU with multiple RT +* tasks queued on it (overloaded) needs to be notified that a CPU has opened +* up that may be able to run one of its non-running queued RT tasks. +* +* On large CPU boxes, there's the case that several CPUs could schedule +* a lower priority task at the same time, in which case it will look for +* any overloaded CPUs that it could pull a task from. To do this, the runqueue +* lock must be taken from that overloaded CPU. Having 10s of CPUs all fighting +* for a single overloaded CPU's runqueue lock can produce a large latency. +* (This has actually been observed on large boxes running cyclictest). +* Instead of taking the runqueue lock of the overloaded CPU, each of the +* CPUs that scheduled a lower priority task simply sends an IPI to the +* overloaded CPU. An IPI is much cheaper than taking an runqueue lock with +* lots of contention. The overloaded CPU will look to push its non-running +* RT task off, and if it does, it can then ignore the other IPIs coming +* in, and just pass those IPIs off to any other overloaded CPU. +* +* When a CPU schedules a lower priority task, it only sends an IPI to +* the "next" CPU that has overloaded RT tasks. This prevents IPI storms, +* as having 10 CPUs scheduling lower priority tasks and 10 CPUs with +* RT overloaded tasks, would cause 100 IPIs to go out at once. +* +* The overloaded RT CPU, when receiving an IPI, will try to push off its +* overloaded RT tasks and then send an IPI to the next CPU that has +* overloaded RT tasks. This stops when all CPUs with overloaded RT tasks +* have completed. Just because a CPU may have pushed off its own overloaded +* RT task does not mean it should stop sending the IPI around to other +* overloaded CPUs. There may be another RT task waiting to run on one of +* those CPUs that are of higher priority than the one that was just +* pushed. +* +* An optimization that could possibly be made is to make a CPU array similar +* to the cpupri array mask of all running RT tasks, but for the overloaded +* case, then the IPI could be sent to only the CPU with the highest priority +* RT task waiting, and that CPU could send off further IPIs to the CPU with +* the next highest waiting task. Since the overloaded case is much less likely +* to happen, the complexity of this implementation may not be worth it. +* Instead, just send an IPI around to all overloaded CPUs. +* +* The rq->rt.push_flags holds the status of the IPI that is going around. +* A run queue can only send out a single IPI at a time. The possible flags +* for rq->rt.push_flags are: +* +* (None or zero): No IPI is going around for the current rq +* RT_PUSH_IPI_EXECUTING: An IPI for the rq is being passed around +* RT_PUSH_IPI_RESTART: The priority of the running task for the rq +* has changed, and the IPI should restart +* circulating the overloaded CPUs again. +* +* rq->rt.push_cpu contains the CPU that is being sent the IPI. It is updated +* before sending to the next CPU. +* +* Instead of having all CPUs that schedule a lower priority task send +* an IPI to the same "first" CPU in the RT overload mask, they send it +* to the next overloaded CPU after their own CPU. This helps distribute +* the work when there's more than one overloaded CPU and multiple CPUs +* scheduling in lower priority tasks. +* +* When a rq schedules a lower priority task than what was currently +* running, the next CPU with overloaded RT tasks is examined first. +* That is, if CPU 1 and 5 are overloaded, and CPU 3 schedules a lower +* priority task, it will send an IPI first to CPU 5, then CPU 5 will +* send to CPU 1 if it is still overloaded. CPU 1 will clear the +* rq->rt.push_flags if RT_PUSH_IPI_RESTART is not set. +* +* The first CPU to notice IPI_RESTART is set, will clear that flag and then +* send an IPI to the next overloaded CPU after the rq->cpu and not the next +* CPU after push_cpu. That is, if CPU 1, 4 and 5 are overloaded when CPU 3 +* schedules a lower priority task, and the IPI_RESTART gets set while the +* handling is being done on CPU 5, it will clear the flag and send it back to +* CPU 4 instead of CPU 1. +* +* Note, the above logic can be disabled by turning off the sched_feature +* RT_PUSH_IPI. Then the rq lock of the overloaded CPU will simply be +* taken by the CPU requesting a pull and the waiting RT task will be pulled +* by that CPU. This may be fine for machines with few CPUs. +*/ static void tell_cpu_to_push (struct rq *rq) {int cpu;