I tried to summarize this thread (also see https://lists.xenproject.org/archives/html/xen-devel/2018-05/threads.html#01127), CC'ing everyone that contributed or requested to be on the thread. I also moved comments into https://docs.google.com/document/d/1FbGV4ZZB9OU8SI4b9ntnM-l6NaQLND8Yfd9u11V5Q5A/edit#
2.2.2 A XSA-Reissues
I still need to do some number crunching based on a script I have not written yet.
2.2.4. A Too many security supported Xen releases
It seems that the 6 months cycle may be too short. The suggestion was to run a similar consultation about release cycle compared to this. Originally, it was primarily HW vendors pushing for shorter release cycles. I will bring this up at the Summit in a Design Session and report back to the list.
R1) Recommendation: Batching
There seems to be sufficient consensus to spell out batching as an explicit option in the security policy, as long as it is not mandatory. I think it also makes sense to clarify the "Embargo and Disclosure Schedule" section: it affords quite a lot of flexibility to the security team, but it seems that some people are interpreting the 1 week for a fix + 2 weeks embargo as fixed, which at best means the text is not clear enough.
R2) Recommendation: Workload
It seems that my suggestion to not specifically address this through a mechanism in the policy and leave it up to the security team to manage batch size has consensus. Assuming we add batching as an explicit option in the policy, we should also make this explicit.
R3) Recommendation: Predictability
A few people believe that a more predictable XSA release schedule would help. At the same time, there are valid concerns about the security team being overloaded. I am wondering whether we should trial batching towards some undocumented batch release date for a bit and see what the impact is: the policy would allow us to do this. We could also state in the policy that we are trialling this.
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches have to be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem
* Recently this issue has become much worse, because some security fixes (or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run
* A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers to maintain a staging branch and an XSA + pre-requisites only branch
In other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites only branches for releases
b) Find some tooling/test based solution which exposes issues applying XSAs on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into.
For example, we could create an OSSTEST, that checks out the last released stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?
Best Regards
Lars
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 11 lines · Lars Kurth
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches have to be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem
* Recently this issue has become much worse, because some security fixes (or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run
* A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers to maintain a staging branch and an XSA + pre-requisites only branchIn other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites only branches for releases
b) Find some tooling/test based solution which exposes issues applying XSAs on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into.
For example, we could create an OSSTEST, that checks out the last released stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?
Here's a question: What would it take for most downstreams to update to staging when a public release was made?
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.
At the moment the release process is quite manual, which isn't terrible for one point release every 4 months per supported release, but would significantly increase the workload if we did it for every supported version for every XSA. We'd have to invest quite a bit in automating that process, which would make it only worth it if a significant number of people would find that useful.
The other thing we could probably do is write a tool which would automatically determine the minimum number of 'extra' patches to backport from the stable branch to allow the patch to apply and build. The issue with that, of course, is that such a branch will be an artificial branch which has almost no testing.
-George
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 17 lines · George Dunlap
Quoted 11 lines · Lars Kurth
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches have to be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem
* Recently this issue has become much worse, because some security fixes (or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run
* A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers to maintain a staging branch and an XSA + pre-requisites only branchIn other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites only branches for releases
b) Find some tooling/test based solution which exposes issues applying XSAs on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into.
For example, we could create an OSSTEST, that checks out the last released stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?Here's a question: What would it take for most downstreams to update to staging when a public release was made?
Quoted 7 lines
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.
IMO this would significantly ease handling of XSAs, at least for us. This does mean we'll need to test things using stable branch (not previous point release) during embargo period - as the point release would be available only after lifting the embargo, but I think that's manageable.
What if at the predisclose time there are some commits in staging (not stable), which breaks things (in terms of osstest)? Would them be bypassed (XSA applied on top of stable, then rebase staging on top of new stable)? Or something else?
Quoted 6 lines
At the moment the release process is quite manual, which isn't terrible for one point release every 4 months per supported release, but would significantly increase the workload if we did it for every supported version for every XSA. We'd have to invest quite a bit in automating that process, which would make it only worth it if a significant number of people would find that useful.
Alternatively this could be triggered only if there are conflicting changes in stable branch, since last point release (but free stable anyway, to not leak info about the patches). This should reduce probability of very frequent point releases (the more recent point release is, the more likely XSA will apply without problems). This could be determined mostly automatically by trying to apply patches on the most recent point release.
Quoted 5 lines
The other thing we could probably do is write a tool which would automatically determine the minimum number of 'extra' patches to backport from the stable branch to allow the patch to apply and build. The issue with that, of course, is that such a branch will be an artificial branch which has almost no testing.
I'm bit worried about such solution, although this is exactly what we do right now. With exception that a) it isn't automated b) we do testing on our own (and probably others do to, duplicating this work).
Signature · 5 lines
Best Regards, Marek Marczykowski-Górecki Invisible Things Lab A: Because it messes up the order in which people normally read text. Q: Why is top-posting such a bad thing?
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 50 lines
Quoted 1 line
Quoted 1 line · On 05.06.18 at 13:03, <[email protected]> wrote:
Quoted 5 lines · George Dunlap
Quoted 3 lines · Lars Kurth
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches haveto be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem
Quoted 1 line
Quoted 1 line
* Recently this issue has become much worse, because some security fixes
(or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run
Quoted 2 lines
Quoted 2 lines
* A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers tomaintain a staging branch and an XSA + pre-requisites only branch
Quoted 3 lines
Quoted 3 lines
In other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites onlybranches for releases
Quoted 1 line
Quoted 1 line
b) Find some tooling/test based solution which exposes issues applying XSAs
on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into.
Quoted 1 line
Quoted 1 line
For example, we could create an OSSTEST, that checks out the last released
stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?
Quoted 11 lines
Here's a question: What would it take for most downstreams to update to staging when a public release was made?
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.IMO this would significantly ease handling of XSAs, at least for us. This does mean we'll need to test things using stable branch (not previous point release) during embargo period - as the point release would be available only after lifting the embargo, but I think that's manageable.
Quoted 4 lines
What if at the predisclose time there are some commits in staging (not stable), which breaks things (in terms of osstest)? Would them be bypassed (XSA applied on top of stable, then rebase staging on top of new stable)? Or something else?
I don't think we should get into the business of re-basing any of the main branches of xen.git. If anything, then merging. But I further think we also shouldn't break the strict staging -> stable workflow with the osstest push gate in between. Some delay between public disclosure and release of the new stable version will hence be unavoidable. (Just take the current situation as an example, where we're blocked on an osstest issue [according to my investigation, at least] with two stable releases - we simply have to wait for the osstest issue to be dealt with first, and for the pushes of the branches then to eventually happen.)
Jan
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 55 lines · Jan Beulich
Quoted 50 lines
Quoted 1 line
Quoted 1 line · On 05.06.18 at 13:03, <[email protected]> wrote:
Quoted 5 lines · George Dunlap
Quoted 3 lines · Lars Kurth
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches haveto be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem
Quoted 1 line
Quoted 1 line
* Recently this issue has become much worse, because some security fixes
(or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run
Quoted 2 lines
Quoted 2 lines
* A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers tomaintain a staging branch and an XSA + pre-requisites only branch
Quoted 3 lines
Quoted 3 lines
In other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites onlybranches for releases
Quoted 1 line
Quoted 1 line
b) Find some tooling/test based solution which exposes issues applying XSAs
on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into.
Quoted 1 line
Quoted 1 line
For example, we could create an OSSTEST, that checks out the last released
stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?
Quoted 11 lines
Here's a question: What would it take for most downstreams to update to staging when a public release was made?
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.IMO this would significantly ease handling of XSAs, at least for us. This does mean we'll need to test things using stable branch (not previous point release) during embargo period - as the point release would be available only after lifting the embargo, but I think that's manageable.
Quoted 4 lines
What if at the predisclose time there are some commits in staging (not stable), which breaks things (in terms of osstest)? Would them be bypassed (XSA applied on top of stable, then rebase staging on top of new stable)? Or something else?
Quoted 10 lines
I don't think we should get into the business of re-basing any of the main branches of xen.git. If anything, then merging. But I further think we also shouldn't break the strict staging -> stable workflow with the osstest push gate in between. Some delay between public disclosure and release of the new stable version will hence be unavoidable. (Just take the current situation as an example, where we're blocked on an osstest issue [according to my investigation, at least] with two stable releases - we simply have to wait for the osstest issue to be dealt with first, and for the pushes of the branches then to eventually happen.)
Makes sense. Does it mean in all the cases point release would happen with a delay from XSA public release? How long does it take for osstest to push things (assuming no problems)?
Signature · 5 lines
Best Regards, Marek Marczykowski-Górecki Invisible Things Lab A: Because it messes up the order in which people normally read text. Q: Why is top-posting such a bad thing?
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 34 lines
Quoted 1 line
Quoted 1 line · On 05.06.18 at 14:07, <[email protected]> wrote:
Quoted 21 lines · Jan Beulich
Quoted 16 lines
Quoted 1 line
Quoted 1 line · On 05.06.18 at 13:03, <[email protected]> wrote:
Quoted 7 lines · George Dunlap
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.IMO this would significantly ease handling of XSAs, at least for us. This does mean we'll need to test things using stable branch (not previous point release) during embargo period - as the point release would be available only after lifting the embargo, but I think that's manageable.
Quoted 4 lines
What if at the predisclose time there are some commits in staging (not stable), which breaks things (in terms of osstest)? Would them be bypassed (XSA applied on top of stable, then rebase staging on top of new stable)? Or something else?
Quoted 10 lines
I don't think we should get into the business of re-basing any of the main branches of xen.git. If anything, then merging. But I further think we also shouldn't break the strict staging -> stable workflow with the osstest push gate in between. Some delay between public disclosure and release of the new stable version will hence be unavoidable. (Just take the current situation as an example, where we're blocked on an osstest issue [according to my investigation, at least] with two stable releases - we simply have to wait for the osstest issue to be dealt with first, and for the pushes of the branches then to eventually happen.)
Quoted 3 lines
Makes sense. Does it mean in all the cases point release would happen with a delay from XSA public release? How long does it take for osstest to push things (assuming no problems)?
A day or two. Remember that osstest will be quite busy at such times, testing all active branches at the same time. But please don't forget:
"No problems" is rather a rare exception than the rule.
Jan
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 47 lines · AEST George Dunlap
Quoted 12 lines · Lars Kurth
2.2.3 B. Git baseline of patches
This created quite a bit of discussion and we did learn a few things:
* From the thread, having to cherry pick a small (around 5-6) patches have to be cherry-picked for XSAs to apply to tarballs this appears to be seen as OK for most users. More patches are a problem * Recently this issue has become much worse, because some security fixes (or pre-requisites for them) have been developed in public and some XSAs required significant backporting to be able to be run * A point release has usually <50% security fixes
* There is no appetite amongst existing point release maintainers to maintain a staging branch and an XSA + pre-requisites only branchQuoted 16 lines
In other words, we are at a stale-mate. I see two ways around it
a) Find an additional volunteer to maintain XSA + pre-requisites only branches for releases b) Find some tooling/test based solution which exposes issues applying XSAs on the last releases of a staging branch for a point release. This is a little bit of a half-baked idea, but it may be worthwhile looking into. For example, we could create an OSSTEST, that checks out the last released stable branch and applies outstanding XSAs and pre-requisites based on the meta-info to it (e.g. via xsatool or a variant thereof). This test would fail, if an XSA does not apply, which implies that the pre-requisites are incomplete. If all XSAs apply, we can run the full OSSTEST on it. The test could also produce a list of git commits from staging that include XSAs and pre-requisites that can be applied in order. This should in theory - if doable - help downstreams which are struggling with this problem, while flagging up potential issues to stable maintainers early. Any thoughts? Would this be workable and if so, would it actually help?Here's a question: What would it take for most downstreams to update to staging when a public release was made?
Suppose we did this:
1. When we predisclose an issue, freeze the stable branches until the embargo lifts -- no backports.
2. When the embargo lifts, addition to the patches, we release a new point release, complete with signed tag and tarball.
3. We only do non-security point releases if we go 4 months without a security-prompted point release.At the moment the release process is quite manual, which isn't terrible for one point release every 4 months per supported release, but would significantly increase the workload if we did it for every supported version for every XSA. We'd have to invest quite a bit in automating that process, which would make it only worth it if a significant number of people would find that useful.
Quoted 5 lines
The other thing we could probably do is write a tool which would automatically determine the minimum number of 'extra' patches to backport from the stable branch to allow the patch to apply and build. The issue with that, of course, is that such a branch will be an artificial branch which has almost no testing.
I just wanted to git this a bit of a prod to keep it current.
Right now, we're at a stage where we could probably justify a new release of 4.6, 4.7, 4.8, 4.9, and 4.10 due to the depth of XSAs contained within that can't be patched on top of the release archive.
Its actually easier to rebuild packages often with just updating version numbers than do patches to eternity. The kernel packages are one such example where this can be easily automated to even build / distribute without human interaction.
Signature · 4 lines
Steven Haigh 📧 [email protected] 💻 https://www.crc.id.au 📞 +61 (3) 9001 6090 📱 0412 935 897
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 4 lines
Quoted 1 line
Quoted 1 line · On 27.06.18 at 06:05, <[email protected]> wrote:
Right now, we're at a stage where we could probably justify a new release of 4.6, 4.7, 4.8, 4.9, and 4.10 due to the depth of XSAs contained within that can't be patched on top of the release archive.
4.7.6 and 4.8.4 are imminent anyway, and 4.9.3 is due in about a month's time (I'll send a respective call for pointing out missing backports once I've flushed out my own queue). There's not going to be another release off the 4.6 branch, at least not one organized by XenProject. Even us meaning to do so for 4.7 is only because of the circumstances.
As mentioned before - personally I'm not fancying to do more frequent stable releases.
Jan
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 12 lines · AEST Jan Beulich
Quoted 4 lines
Quoted 1 line
Quoted 1 line · On 27.06.18 at 06:05, <[email protected]> wrote:
Right now, we're at a stage where we could probably justify a new release of 4.6, 4.7, 4.8, 4.9, and 4.10 due to the depth of XSAs contained within that can't be patched on top of the release archive.
4.7.6 and 4.8.4 are imminent anyway, and 4.9.3 is due in about a month's time (I'll send a respective call for pointing out missing backports once I've flushed out my own queue). There's not going to be another release off the 4.6 branch, at least not one organized by XenProject. Even us meaning to do so for 4.7 is only because of the circumstances.
Quoted 2 lines
As mentioned before - personally I'm not fancying to do more frequent stable releases.
Surely we are able to automate the majority of the process?
I could imagine that with a regular release schedule, it could be refined enough to automatically package the current git branch based on just committing a tag.
Signature · 4 lines
Steven Haigh 📧 [email protected] 💻 https://www.crc.id.au 📞 +61 (3) 9001 6090 📱 0412 935 897
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
On 27/06/2018, 22:47, "Steven Haigh" <[email protected]> wrote:
On Wednesday, 27 June 2018 7:19:58 PM AEST Jan Beulich wrote:
> >>> On 27.06.18 at 06:05, <[email protected]> wrote:
> > Right now, we're at a stage where we could probably justify a new release > > of 4.6, 4.7, 4.8, 4.9, and 4.10 due to the depth of XSAs contained within > > that can't be patched on top of the release archive.
>
> 4.7.6 and 4.8.4 are imminent anyway, and 4.9.3 is due in about a > month's time (I'll send a respective call for pointing out missing > backports once I've flushed out my own queue). There's not going to > be another release off the 4.6 branch, at least not one organized by > XenProject. Even us meaning to do so for 4.7 is only because of the > circumstances.
>
> As mentioned before - personally I'm not fancying to do more frequent > stable releases.
Surely we are able to automate the majority of the process?
I could imagine that with a regular release schedule, it could be refined enough to automatically package the current git branch based on just committing a tag.
There was a discussion at the summit in this area, which would be a step in the right direction, which was proposed by Doug from Rackspace and Matt from ARM. I still need to deal with the meeting notes Lars
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel
Quoted 23 lines · Lars Kurth
On 27/06/2018, 22:47, "Steven Haigh" <[email protected]> wrote:
Quoted 12 lines · AEST Jan Beulich
Quoted 4 lines
Quoted 1 line
Quoted 1 line · On 27.06.18 at 06:05, <[email protected]> wrote:
Right now, we're at a stage where we could probably justify a new release of 4.6, 4.7, 4.8, 4.9, and 4.10 due to the depth of XSAs contained within that can't be patched on top of the release archive.
4.7.6 and 4.8.4 are imminent anyway, and 4.9.3 is due in about a month's time (I'll send a respective call for pointing out missing backports once I've flushed out my own queue). There's not going to be another release off the 4.6 branch, at least not one organized by XenProject. Even us meaning to do so for 4.7 is only because of the circumstances.
Quoted 2 lines
As mentioned before - personally I'm not fancying to do more frequent stable releases.
Quoted 8 lines
Surely we are able to automate the majority of the process?
I could imagine that with a regular release schedule, it could be refined enough to automatically package the current git branch based on just committing a tag.
There was a discussion at the summit in this area, which would be a step in the right direction, which was proposed by Doug from Rackspace and Matt from ARM. I still need to deal with the meeting notes Lars
The relevant meeting notes are:
* https://lists.xenproject.org/archives/html/xen-devel/2018-07/threads.html#00129 (Testing/Building with Docker/GitLab)
* https://lists.xenproject.org/archives/html/xen-devel/2018-07/threads.html#00166 (Process changes: is the 6 monthly release Cadence too short, Security Process, ...)
If you want to pick up items from these discussions in this thread, please copy the relevant section from the above discussion into this thread.
Lars
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xenproject.org/mailman/listinfo/xen-devel