sched: Consider capacity for certain load balancing decisions
PATCH 1/1 sched: Consider capacity for certain load balancing decisions
After load balancing was split into different scenarios, CPU capacity is ignored for the "migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.
By comparing nr_running/capacity instead of just nr_running we can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.
--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)
kernel/sched/fair.c +2 -1
@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;
Signature · 1 line
2.39.1
Peter Zijlstra
maintainerQuoted 20 lines · Xi Wang
After load balancing was split into different scenarios, CPU capacity is ignored for the "
migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.By comparing nr_running/capacity instead of just
nr_runningwe can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.Signed-off-by Xi Wang <[email protected]>--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)kernel/sched/fair.c +0
-0
kernel/sched/fair.c static struct rq *find_busiest_queue(struct lb_env *env, · line 10376
Quoted 10 lines
kernel/sched/fair.c +2
-1@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;
I don't think this is correct. The migrate_task case is work-conserving, and your change can severely break that I think.
Quoted 24 lines · Peter Zijlstra
Quoted 22 lines · Xi Wang
After load balancing was split into different scenarios, CPU capacity is ignored for the "
migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.By comparing nr_running/capacity instead of just
nr_runningwe can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.Signed-off-by Xi Wang <[email protected]>--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)kernel/sched/fair.c +0
-0@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;
Quoted 12 lines
kernel/sched/fair.c static struct rq *find_busiest_queue(struct lb_env *env, · line 10376
Quoted 8 lines
kernel/sched/fair.c +2
-1case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;I don't think this is correct. The
migrate_taskcase is work-conserving, and your change can severely break that I think.
I think you meant this kind of scenario:
cpu 0: idle
cpu 1: 2 tasks
cpu 2: 1 task but only has 30% of capacity
Pulling from cpu 2 is good for the task but lowers the overall cpu throughput.
The problem we have is:
cpu 0: idle
cpu 1: 1 task
cpu 2: 1 task but only has 60% of capacity due to net softirq The task on cpu 2 stays there and runs slower. (This can also be considered non work-conserving if we account softirq like a task.)
Maybe the logic can be merged like this: Use capacity but pick from nr_running > 1 cpus first, then nr_running == 1 cpus if not found.
Vincent Guittot
maintainerQuoted 46 lines · Xi Wang
Quoted 24 lines · Peter Zijlstra
Quoted 22 lines · Xi Wang
After load balancing was split into different scenarios, CPU capacity is ignored for the "
migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.By comparing nr_running/capacity instead of just
nr_runningwe can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.Signed-off-by Xi Wang <[email protected]>--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)kernel/sched/fair.c +0
-0@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;Quoted 12 lines
kernel/sched/fair.c static struct rq *find_busiest_queue(struct lb_env *env, · line 10376
Quoted 8 lines
kernel/sched/fair.c +2
-1case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;I don't think this is correct. The
migrate_taskcase is work-conserving, and your change can severely break that I think.I think you meant this kind of scenario:
cpu 0: idle
cpu 1: 2 tasks
cpu 2: 1 task but only has 30% of capacity
Pulling from cpu 2 is good for the task but lowers the overall cpu throughput.
Quoted 6 lines
The problem we have is:
cpu 0: idle
cpu 1: 1 task
cpu 2: 1 task but only has 60% of capacity due to net softirq The task on cpu 2 stays there and runs slower. (This can also be considered non work-conserving if we account softirq like a task.)
When load_balance runs for this 2 cpus, cpu2 should be tagged as misfit_task because of reduce_capacity and should be selected in priority by cpu0 to pull the task. Do you have more details on your topology ?
Quoted 3 lines
Maybe the logic can be merged like this: Use capacity but pick from
nr_running> 1 cpus first, thennr_running== 1 cpus if not found.
Quoted 55 lines · Vincent Guittot
Quoted 46 lines · Xi Wang
Quoted 24 lines · Peter Zijlstra
Quoted 22 lines · Xi Wang
After load balancing was split into different scenarios, CPU capacity is ignored for the "
migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.By comparing nr_running/capacity instead of just
nr_runningwe can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.Signed-off-by Xi Wang <[email protected]>--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)kernel/sched/fair.c +0
-0@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;Quoted 12 lines
kernel/sched/fair.c static struct rq *find_busiest_queue(struct lb_env *env, · line 10376
Quoted 8 lines
kernel/sched/fair.c +2
-1case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;I don't think this is correct. The
migrate_taskcase is work-conserving, and your change can severely break that I think.I think you meant this kind of scenario:
cpu 0: idle
cpu 1: 2 tasks
cpu 2: 1 task but only has 30% of capacity
Pulling from cpu 2 is good for the task but lowers the overall cpu throughput.Quoted 6 lines
The problem we have is:
cpu 0: idle
cpu 1: 1 task
cpu 2: 1 task but only has 60% of capacity due to net softirq The task on cpu 2 stays there and runs slower. (This can also be considered non work-conserving if we account softirq like a task.)
Quoted 4 lines
When
load_balanceruns for this 2 cpus, cpu2 should be tagged asmisfit_taskbecause ofreduce_capacityand should be selected in priority by cpu0 to pull the task. Do you have more details on your topology ?
The topology is 64 core AMD with 2 hyperthreads.
I am not familiar with the related code but I think there are cases where a task fits cpu capacity but it can still run faster elsewhere, e.g.: Bursty workloads. Thread pool threads with variable utilization because it would process more or less requests based on cpu availability (pick the next request from a shared queue when the previous one is done). A thread having enough cpu cycles but runs slower due to softirqs can also directly affect application performance.
Quoted 3 lines
Quoted 3 lines
Maybe the logic can be merged like this: Use capacity but pick from
nr_running> 1 cpus first, thennr_running== 1 cpus if not found.
Vincent Guittot
maintainerQuoted 65 lines · Xi Wang
Quoted 55 lines · Vincent Guittot
Quoted 46 lines · Xi Wang
Quoted 24 lines · Peter Zijlstra
Quoted 22 lines · Xi Wang
After load balancing was split into different scenarios, CPU capacity is ignored for the "
migrate_task" case, which means a thread can stay on a softirq heavy cpu for an extended amount of time.By comparing nr_running/capacity instead of just
nr_runningwe can add CPU capacity back into "migrate_task" decisions. This benefits workloads running on machines with heavy network traffic. The change is unlikely to cause serious problems for other workloads but maybe some corner cases still need to be considered.Signed-off-by Xi Wang <[email protected]>--- kernel/sched/fair.c | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-)kernel/sched/fair.c +0
-0@@ -10368,8 +10368,9 @@ static struct rq *find_busiest_queue(struct lb_env *env,break ;Quoted 12 lines
kernel/sched/fair.c static struct rq *find_busiest_queue(struct lb_env *env, · line 10376
Quoted 8 lines
kernel/sched/fair.c +2
-1case migrate_task: -if (busiest_nr < nr_running) { +if (busiest_nr * capacity < nr_running * busiest_capacity) { busiest_nr = nr_running; + busiest_capacity = capacity; busiest = rq; }break ;I don't think this is correct. The
migrate_taskcase is work-conserving, and your change can severely break that I think.I think you meant this kind of scenario:
cpu 0: idle
cpu 1: 2 tasks
cpu 2: 1 task but only has 30% of capacity
Pulling from cpu 2 is good for the task but lowers the overall cpu throughput.Quoted 6 lines
The problem we have is:
cpu 0: idle
cpu 1: 1 task
cpu 2: 1 task but only has 60% of capacity due to net softirq The task on cpu 2 stays there and runs slower. (This can also be considered non work-conserving if we account softirq like a task.)Quoted 4 lines
When
load_balanceruns for this 2 cpus, cpu2 should be tagged asmisfit_taskbecause ofreduce_capacityand should be selected in priority by cpu0 to pull the task. Do you have more details on your topology ?The topology is 64 core AMD with 2 hyperthreads.
Quoted 8 lines
I am not familiar with the related code but I think there are cases where a task fits cpu capacity but it can still run faster elsewhere, e.g.: Bursty workloads. Thread pool threads with variable utilization because it would process more or less requests based on cpu availability (pick the next request from a shared queue when the previous one is done). A thread having enough cpu cycles but runs slower due to softirqs can also directly affect application performance.
misfit_task is also used to detect CPUs with reduced capacity. We can have a look at update_sg_lb_stats(). Your use case above should fall in this case
Quoted 4 lines
Quoted 4 lines
Quoted 4 lines
Maybe the logic can be merged like this: Use capacity but pick from
nr_running> 1 cpus first, thennr_running== 1 cpus if not found.