net-next shutdown plans around LPC
Subsystems (2)
Jakub Kicinski
maintainerHi!
LPC 2024 will begin less than a month from now, on Sept 18th.
The conference will take place very close to the merge window (either during the first week of the merge window, or the week before it). Since a lot of the maintainers and reviewers will be attending LPC, netconf, maintainer summit etc. - we plan to shut down net-next on Sept 13th (end of the week before LPC).
If Linus cuts final 6.11 on the 15th - this will be a non-event. If he doesn't - we will operate for a week with 2 trees in "fixes only mode", with net-next only accepting fixes for code already in it (and net operating as usual).
For sub-trees which feed net-next, we would appreciate if the PRs were posted by Sept 12th. We may still pull extra stuff the week of LPC if merge window doesn't open, but would prefer not to :)
- netdev maintainers