sched: deadline: Remove unnecessary goto label in pick_earliest_pushable_dl_task
RFC PATCH 1/1 sched: deadline: Remove unnecessary goto label in pick_earliest_pushable_dl_task
Commit 8b5e770ed7c0 ("sched/deadline: Optimize pull_dl_task()") added an odd goto label that seems to be unnecssary, given its called unconditionally from the bottom of a while loop and the label is at the top.
Thus, clean it up and remove the label/goto.
--- kernel/sched/deadline.c | 3 --- 1 file changed, 3 deletions(-)
kernel/sched/deadline.c +0 -3
@@ -2501,8 +2501,6 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn NULL ; next_node =rb_first_cached (&rq->dl.pushable_dl_tasks_root); - -next_node:if (next_node) { p =__node_2_pdl (next_node);
@@ -2510,7 +2508,6 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn p; next_node =rb_next (next_node); - goto next_node; }return NULL ;
Signature · 1 line
2.47.0.338.g60cca15819-goog
Le 05/12/2024 à 22:16, John Stultz a écrit :
Quoted 2 lines
Commit
8b5e770ed7c0("sched/deadline: Optimizepull_dl_task()") added an odd goto label that seems to be unnecssary, given its
s/unnecssary/unnecessary/
Quoted 2 lines
called unconditionally from the bottom of a while loop and the label is at the top.
Except that it is not a while loop, but only an if.
Maybe, changing this if into a while would save a few lines of code and be more readable as-well.
CJ
Quoted 43 lines
Thus, clean it up and remove the label/goto.
Cc Ingo Molnar <[email protected]>Cc Peter Zijlstra <[email protected]>Cc Juri Lelli <[email protected]>Cc Vincent Guittot <[email protected]>Cc Dietmar Eggemann <[email protected]>Cc Steven Rostedt <[email protected]>Cc Ben Segall <[email protected]>Cc Mel Gorman <[email protected]>Cc Valentin Schneider <[email protected]>Cc Wanpeng Li <[email protected]>Cc Todd Kjos <[email protected]>Fixes 8b5e770ed7c0 ("sched/deadline: Optimize pull_dl_task()")Reported-by Todd Kjos <[email protected]>Signed-off-by John Stultz <[email protected]>--- kernel/sched/deadline.c | 3 --- 1 file changed, 3 deletions(-)kernel/sched/deadline.c +0
-3@@ -2501,8 +2501,6 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn NULL ; next_node =rb_first_cached (&rq->dl.pushable_dl_tasks_root); - -next_node:if (next_node) { p =__node_2_pdl (next_node);@@ -2510,7 +2508,6 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn p; next_node =rb_next (next_node); - goto next_node; }return NULL ;
Quoted 11 lines · Christophe JAILLET
Quoted 2 lines · John Stultz
Commit
8b5e770ed7c0("sched/deadline: Optimizepull_dl_task()") added an odd goto label that seems to be unnecssary, given itss/unnecssary/unnecessary/
Quoted 2 lines
called unconditionally from the bottom of a while loop and the label is at the top.
Except that it is not a while loop, but only an if.
Ah! Apologies. I need to get my eyes checked. :P Thank you for catching me there.
Quoted 2 lines
Maybe, changing this if into a while would save a few lines of code and be more readable as-well.
Yeah, Todd pointed out the unconventional usage, but my brain mis-read the code as being a while(). I'll resend with that change.
thanks
-john
PATCH v2 1/1 sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
In reply to John StultzCommit 8b5e770ed7c0 ("sched/deadline: Optimize pull_dl_task()") added a goto label seems would be better written as a while loop.
So replace the goto with a while loop, to make it easier to read.
---
v2:
* Corrects my misreading of the code (as pointed out by Christophe JAILLET) as already having a while loop, and switches the if to a while.
--- kernel/sched/deadline.c | 5 +---- 1 file changed, 1 insertion(+), 4 deletions(-)
kernel/sched/deadline.c +1 -4
@@ -2501,16 +2501,13 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn NULL ; next_node =rb_first_cached (&rq->dl.pushable_dl_tasks_root); - -next_node: -if (next_node) { +while (next_node) { p =__node_2_pdl (next_node);if (task_is_pushable (rq, p, cpu))return p; next_node =rb_next (next_node); - goto next_node; }return NULL ;
Signature · 1 line
2.47.0.338.g60cca15819-goog
K Prateek Nayak
reviewerRe: [PATCH v2] sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
Hello John,
Quoted 6 lines · John Stultz
Commit
8b5e770ed7c0("sched/deadline: Optimizepull_dl_task()") added a goto label seems would be better written as a while loop.So replace the goto with a while loop, to make it easier to read.
Quoted 15 lines
Cc Ingo Molnar <[email protected]>Cc Peter Zijlstra <[email protected]>Cc Juri Lelli <[email protected]>Cc Vincent Guittot <[email protected]>Cc Dietmar Eggemann <[email protected]>Cc Steven Rostedt <[email protected]>Cc Ben Segall <[email protected]>Cc Mel Gorman <[email protected]>Cc Valentin Schneider <[email protected]>Cc Wanpeng Li <[email protected]>Cc Christophe JAILLET <[email protected]>Cc Todd Kjos <[email protected]>Reported-by Todd Kjos <[email protected]>Signed-off-by John Stultz <[email protected]>
Gave it a spin on my box. Feel free to add:
Signature · 2 lines
Thanks and Regards, Prateek
Quoted 31 lines
---
v2:
* Corrects my misreading of the code (as pointed out by Christophe JAILLET) as already having a while loop, and switches the if to a while.--- kernel/sched/deadline.c | 5 +---- 1 file changed, 1 insertion(+), 4 deletions(-)kernel/sched/deadline.c +1
-4@@ -2501,16 +2501,13 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn NULL ; next_node =rb_first_cached (&rq->dl.pushable_dl_tasks_root); - -next_node: -if (next_node) { +while (next_node) { p =__node_2_pdl (next_node);if (task_is_pushable (rq, p, cpu))return p; next_node =rb_next (next_node); - goto next_node; }return NULL ;
Re: [PATCH v2] sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
In reply to John StultzHi John,
Quoted 6 lines · John Stultz
Commit
8b5e770ed7c0("sched/deadline: Optimizepull_dl_task()") added a goto label seems would be better written as a while loop.So replace the goto with a while loop, to make it easier to read.
Quoted 15 lines
Cc Ingo Molnar <[email protected]>Cc Peter Zijlstra <[email protected]>Cc Juri Lelli <[email protected]>Cc Vincent Guittot <[email protected]>Cc Dietmar Eggemann <[email protected]>Cc Steven Rostedt <[email protected]>Cc Ben Segall <[email protected]>Cc Mel Gorman <[email protected]>Cc Valentin Schneider <[email protected]>Cc Wanpeng Li <[email protected]>Cc Christophe JAILLET <[email protected]>Cc Todd Kjos <[email protected]>Reported-by Todd Kjos <[email protected]>Signed-off-by John Stultz <[email protected]>
Thanks!
Juri
Peter Zijlstra
maintainerRe: [PATCH v2] sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
In reply to John StultzQuoted 6 lines · John Stultz
Commit
8b5e770ed7c0("sched/deadline: Optimizepull_dl_task()") added a goto label seems would be better written as a while loop.So replace the goto with a while loop, to make it easier to read.
Thanks!
[tip: sched/core] sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
In reply to John StultzThe following commit has been merged into the sched/core branch of tip:
The following commit has been merged into the sched/core branch of tip:
Commit-ID: 7675361ff9a1d9038025c05267600d0c762c0236 Gitweb: https://git.kernel.org/tip/7675361ff9a1d9038025c05267600d0c762c0236 Author: John Stultz <[email protected]> AuthorDate: Thu, 05 Dec 2024 15:59:35 -08:00 Committer: Peter Zijlstra <[email protected]> CommitterDate: Tue, 10 Dec 2024 15:07:06 +01:00
sched: deadline: Cleanup goto label in pick_earliest_pushable_dl_task
Commit 8b5e770ed7c0 ("sched/deadline: Optimize pull_dl_task()") added a goto label seems would be better written as a while loop.
So replace the goto with a while loop, to make it easier to read.
--- kernel/sched/deadline.c | 5 +---- 1 file changed, 1 insertion(+), 4 deletions(-)
kernel/sched/deadline.c +1 -4
@@ -2516,16 +2516,13 @@ static struct task_struct *pick_earliest_pushable_dl_task(struct rq *rq, int cpureturn NULL ; next_node =rb_first_cached (&rq->dl.pushable_dl_tasks_root); - -next_node: -if (next_node) { +while (next_node) { p =__node_2_pdl (next_node);if (task_is_pushable (rq, p, cpu))return p; next_node =rb_next (next_node); - goto next_node; }return NULL ;