docs: process: fix grammatical errors in 2.Process.rst
Subsystems (2)
PATCH 3/3 docs: process: fix grammatical errors in 2.Process.rst
Fix five minor grammatical issues:
- Add comma after introductory phrase "At that point"
- Add comma before conditional "if at all possible"
- Change "close to ready" to "close to being ready"
- Add article "a" before "more extensive review"
- Add article "the" before "volume can reach"
Assisted-by Claude <[email protected]>
Signed-off-by Kit Dallege <[email protected]>
--- Documentation/process/2.Process.rst | 10 +++++----- 1 file changed, 5 insertions(+), 5 deletions(-)
Documentation/process/2.Process.rst +5 -5
@@ -63,7 +63,7 @@ As fixes make their way into the mainline, the patch rate will slow over time. Linus releases new -rc kernels about once a week; a normal series will get up to somewhere between -rc6 and -rc9 before the kernel is considered to be sufficiently stable and the final release is made. -At that point the whole process starts over again. +At that point, the whole process starts over again. As an example, here is how the 5.4 development cycle went (all dates in 2019):
@@ -156,7 +156,7 @@ The stages that a patch goes through are, generally: - Design. This is where the real requirements for the patch - and the way those requirements will be met - are laid out. Design work is often done without involving the community, but it is better to do this work - in the open if at all possible; it can save a lot of time redesigning + in the open, if at all possible; it can save a lot of time redesigning things later. - Early review. Patches are posted to the relevant mailing list, and
@@ -164,12 +164,12 @@ The stages that a patch goes through are, generally: process should turn up any major problems with a patch if all goes well. - - Wider review. When the patch is getting close to ready for mainline + - Wider review. When the patch is getting close to being ready for mainline inclusion, it should be accepted by a relevant subsystem maintainer - though this acceptance is not a guarantee that the patch will make it all the way to the mainline. The patch will show up in the maintainer's subsystem tree and into the -next trees (described below). When the - process works, this step leads to more extensive review of the patch and + process works, this step leads to a more extensive review of the patch and the discovery of any problems resulting from the integration of this patch with work being done by others.
@@ -398,7 +398,7 @@ There are lists hosted elsewhere; please check the MAINTAINERS file for the list relevant for any particular subsystem. The core mailing list for kernel development is, of course, linux-kernel. -This list is an intimidating place to be; volume can reach 500 messages per +This list is an intimidating place to be; the volume can reach 500 messages per day, the amount of noise is high, the conversation can be severely technical, and participants are not always concerned with showing a high degree of politeness. But there is no other place where the kernel
Signature · 1 line
2.53.0