sched_ext: Fix ops->priv NULL pointer deref in bpf_scx_unreg()
Subsystems (2)
Andrea Righi
reviewerPATCH 1/1 sched_ext: Fix ops->priv NULL pointer deref in bpf_scx_unreg()
Under heavy concurrent attach/detach operations, scx_claim_exit() can trigger a NULL pointer dereference. This can be reproduced running the reload_loop kselftests inside a virtme-ng session:
$ vng -v -- ./tools/testing/selftests/sched_ext/runner -t reload_loop ... BUG: kernel NULL pointer dereference, address: 0000000000000400 ... RIP: 0010:scx_claim_exit+0x3b/0x120 Call Trace: <TASK> bpf_scx_unreg+0x45/0xb0 bpf_struct_ops_map_link_dealloc+0x39/0x50 bpf_link_release+0x18/0x20 __fput+0x10b/0x2e0 __x64_sys_close+0x47/0xa0
This was introduced by commit 105dcd005be2 ("sched_ext: Introduce scx_prog_sched()"), which:
- Made kfuncs look up the scheduler via scx_prog_sched(aux), which
resolves aux -> struct_ops -> ops->priv.
- Added RCU_INIT_POINTER(ops->priv, NULL) to bpf_scx_unreg() before dropping the kobject reference.
Under concurrent attach/detach of the same struct_ops program, the BPF program's aux->struct_ops association can resolve to a struct_ops whose ->priv was just cleared by a concurrent bpf_scx_unreg(), or to one where scx_alloc_and_add_sched() has not yet completed rcu_assign_pointer().
When scx_prog_sched() observes this transient ops->priv == NULL, it returns NULL; kfuncs like scx_bpf_create_dsq() then return -ENODEV, which causes ops.init() to fail with -ENODEV. The failed attach enters the disable path, and the subsequent bpf_scx_unreg() reads NULL from ops->priv and dereferences it in scx_claim_exit().
Fix it in two places:
- scx_prog_sched(): when ops is found but ops->priv is NULL, fall through to the scx_root path instead of returning NULL. For single-sched (the only currently supported configuration), this recovers the previous behavior; for sub-sched-aware schedulers the existing !root->ops.sub_attach guard keeps the fallback off so multi-sched semantics are preserved.
- bpf_scx_unreg(): guard against ops->priv == NULL so the function is a no-op instead of NULL-dereferencing scx_disable(NULL, ...).
--- kernel/sched/ext.c | 8 ++++++++ kernel/sched/ext_internal.h | 16 +++++++++++++--- 2 files changed, 21 insertions(+), 3 deletions(-)
kernel/sched/ext.c +8 -0
@@ -7608,6 +7608,14 @@ static void bpf_scx_unreg(void *kdata, struct bpf_link *link)struct sched_ext_ops *ops = kdata;struct scx_sched *sch =rcu_dereference_protected (ops->priv, true); +/* +* ops->priv can be NULL if scx_alloc_and_add_sched() failed before +* assigning it, or if bpf_scx_unreg() somehow re-entered. There's +* nothing to tear down in either case. +*/ +if (!sch) +return ; +scx_disable (sch,SCX_EXIT_UNREG );scx_flush_disable_work (sch);RCU_INIT_POINTER (ops->priv,NULL );
kernel/sched/ext_internal.h +13 -3
@@ -1433,11 +1433,21 @@ static inline bool scx_task_on_sched(struct scx_sched *sch,static inline struct scx_sched *scx_prog_sched (const struct bpf_prog_aux *aux) {struct sched_ext_ops *ops; -struct scx_sched *root; +struct scx_sched *root, *sch; ops =bpf_prog_get_assoc_struct_ops (aux); -if (likely (ops)) -return rcu_dereference_all (ops->priv); +if (likely (ops)) { + sch =rcu_dereference_all (ops->priv); +if (likely (sch)) +return sch; +/* +* @aux is associated with @ops but @ops->priv is NULL. This can +* be observed transiently under concurrent attach/detach (e.g. +* bpf_scx_unreg() clears @ops->priv before kdata is freed). +* Continue with the scx_root path so single-sched users keep +* working, sub-sched users see no scheduler. +*/ + } root =rcu_dereference_all (scx_root);if (root) {
Signature · 1 line
2.54.0
Tejun Heo
reviewerHello, Andrea.
I traced reload_loop with per-CPU ring probes around all @ops->priv and scx_root assign/clear sites. The race is a stomp:
T2 unreg(K) T1 reg(K)
----------- ---------
sch = ops->priv = sch_b800
scx_disable; flush_disable_work
[scx_root_disable: scx_root=NULL,
mutex_unlock, state=DISABLED]
mutex_lock; state ok
scx_alloc_and_add_sched:
ops->priv = sch_a800
scx_root = sch_a800; init=0
state=ENABLED; mutex_unlock
[flush returns] RCU_INIT_POINTER(ops->priv, NULL) <-- clobbers sch_a800 kobject_put(sch_b800)
Reachable because the unreg waits on sch->helper while the next reg runs on the global scx_enable_helper, and scx_enable_mutex is released inside scx_root_disable() well before bpf_scx_unreg() reaches its RCU_INIT_POINTER. My trace caught 11us between PRIV_SET sch_a800 and the clobber; nothing bounds it.
The posted patch suppresses the deref but leaves the stomp. Each stomp leaks one sch (the "sch's base reference will be put by bpf_scx_unreg()" contract assumes ops->priv still points at it), and in the case I caught, sch_a800 is already SCX_ENABLED with scx_root pointing at it - the bpf_link is gone but state stays ENABLED, so all future attaches fail with -EBUSY permanently.
Suggestion: make @ops->priv the lifecycle binding. In scx_root_enable_workfn() (and scx_sub_enable_workfn()), after the existing state check and still under scx_enable_mutex, refuse with -EBUSY if @ops->priv is non-NULL. Unreg side keeps its current ordering.
One question: are there other paths that write or clear @ops->priv? I only see the rcu_assign_pointer in scx_alloc_and_add_sched and the RCU_INIT_POINTER(NULL) in bpf_scx_unreg().
Thanks.
--
tejun
Andrea Righi
reviewerHi Tejun,
Quoted 17 lines · Tejun Heo
Hello, Andrea.
I traced
reload_loopwith per-CPU ring probes around all @ops->priv andscx_rootassign/clear sites. The race is a stomp:T2 unreg(K) T1 reg(K)
----------- ---------
sch =ops->priv=sch_b800
scx_disable;flush_disable_work[scx_root_disable: scx_root=NULL, mutex_unlock, state=DISABLED] mutex_lock; state ok scx_alloc_and_add_sched: ops->priv = sch_a800 scx_root = sch_a800; init=0 state=ENABLED; mutex_unlock [flush returns]
Quoted 2 lines
RCU_INIT_POINTER(ops->priv, NULL)<-- clobberssch_a800kobject_put(sch_b800)
Ah makes sense! Yes, that's the case.
Quoted 14 lines
Reachable because the unreg waits on
sch->helperwhile the next reg runs on the globalscx_enable_helper, andscx_enable_mutexis released insidescx_root_disable()well beforebpf_scx_unreg()reaches itsRCU_INIT_POINTER. My trace caught 11us betweenPRIV_SETsch_a800and the clobber; nothing bounds it.The posted patch suppresses the deref but leaves the stomp. Each stomp leaks one sch (the "sch's base reference will be put by
bpf_scx_unreg()" contract assumesops->privstill points at it), and in the case I caught,sch_a800is alreadySCX_ENABLEDwithscx_rootpointing at it - thebpf_linkis gone but state stays ENABLED, so all future attaches fail with-EBUSYpermanently.
Quoted 5 lines
Suggestion: make @ops->priv the lifecycle binding. In
scx_root_enable_workfn()(andscx_sub_enable_workfn()), after the existing state check and still underscx_enable_mutex, refuse with-EBUSYif @ops->priv is non-NULL. Unreg side keeps its current ordering.
I'll send a new version implementing this.
Quoted 4 lines
One question: are there other paths that write or clear @ops->priv? I only see the
rcu_assign_pointerinscx_alloc_and_add_schedand theRCU_INIT_POINTER(NULL)inbpf_scx_unreg().
AFAICS there's only the rcu_assign_pointer() in scx_alloc_and_add_sched() and RCU_INIT_POINTER(NULL) in bpf_scx_unreg(), no other writers/clearers. So the -EBUSY check should be sufficient to close all the races.
Thanks,
-Andrea
[email protected]
AI reviewThank you for your contribution! Sashiko AI review found 5 potential issue(s) to consider: - [Critical] Dangling pointer in scx_alloc_and_add_sched() leads to Use-After-Free. - [High] Spurious…
Thank you for your contribution! Sashiko AI review found 5 potential issue(s) to consider:
- [Critical] Dangling pointer in scx_alloc_and_add_sched() leads to Use-After-Free.
- [High] Spurious scx_error() triggers Denial of Service in multi-sched environments.
- [High] Early return in bpf_scx_unreg() introduces a permanent resource leak and wedges the scheduler state.
- [High] Fallback to scx_root in scx_prog_sched() breaks isolation and allows cross-scheduler state corruption.
- [High] Using ops->priv to track the scheduler instance inherently breaks sub-schedulers.
--
commit 13d28bde689d42f58394dbdb0585d40676beacf4
Author: Andrea Righi <[email protected]>
sched_ext: Fix ops->priv NULL pointer deref in bpf_scx_unreg()
Under heavy concurrent attach/detach operations, scx_claim_exit() can trigger a NULL pointer dereference. This commit fixes it by falling back to the scx_root path in scx_prog_sched() when ops->priv is NULL, and returning early in bpf_scx_unreg() if the scheduler pointer is NULL.
Quoted 6 lines
kernel/sched/ext.c +0
-0@@ -7493,6 +7493,14 @@ static void bpf_scx_unreg(void *kdata, struct bpf_link *link)struct sched_ext_ops *ops = kdata;
kernel/sched/ext.c static void bpf_scx_unreg(void *kdata, struct bpf_link *link) · line 7503
Quoted 10 lines
kernel/sched/ext.c +8
-0struct scx_sched *sch =rcu_dereference_protected (ops->priv, true); +/* +* ops->priv can be NULL if scx_alloc_and_add_sched() failed before +* assigning it, or if bpf_scx_unreg() somehow re-entered. There's +* nothing to tear down in either case. +*/ +if (!sch) +return ; +
Does this lockless check introduce a permanent resource leak when multiple links are created for the same map?
Looking at bpf_struct_ops_map_link_dealloc(), it does not hold locks preventing concurrent reg operations. If Thread 1 initiates unreg for a detached link and executes scx_disable(), but is preempted before executing RCU_INIT_POINTER(ops->priv, NULL):
Thread 1:scx_disable()
... preempted ...
Thread 2 could successfully attach a new link for the same map, assigning its new scheduler sch2 to ops->priv.
When Thread 1 resumes and executes RCU_INIT_POINTER(ops->priv, NULL), it clears the pointer to Thread 2's active scheduler.
When Thread 2 subsequently detaches, would bpf_scx_unreg() read ops->priv, see NULL, and return early here?
This would completely skip scx_disable() and kobject_put(), permanently leaking sch2 and leaving scx_enable_state stuck at SCX_ENABLED. Would this prevent new schedulers from being loaded until the system is rebooted?
Can a dangling pointer in scx_alloc_and_add_sched() lead to a use-after-free with this ops->priv logic?
While not introduced by this patch, in scx_alloc_and_add_sched(), rcu_assign_pointer(ops->priv, sch) is called before several fallible allocations.
If a subsequent step like kobject_init_and_add() fails, the function jumps to the error path and frees sch via kfree(), but fails to reset ops->priv to NULL.
If a map was previously attached, ran, and armed a stray bpf_timer, could a subsequent failed re-attach attempt leave ops->priv pointing to the freed sch?
When the stray timer fires, would scx_prog_sched() dereference ops->priv and return the freed pointer to BPF kfuncs?
Quoted 16 lines
kernel/sched/ext_internal.h +3
-3@@ -1433,11 +1433,21 @@ static inline bool scx_task_on_sched(struct scx_sched *sch,static inline struct scx_sched *scx_prog_sched (const struct bpf_prog_aux *aux) {struct sched_ext_ops *ops; -struct scx_sched *root; +struct scx_sched *root, *sch; ops =bpf_prog_get_assoc_struct_ops (aux); -if (likely (ops)) -return rcu_dereference_all (ops->priv); +if (likely (ops)) { + sch =rcu_dereference_all (ops->priv);
kernel/sched/ext_internal.h static inline bool scx_task_on_sched(struct scx_sched *sch, · line 1450
Quoted 10 lines
kernel/sched/ext_internal.h +10
-0+if (likely (sch)) +return sch; +/* +* @aux is associated with @ops but @ops->priv is NULL. This can +* be observed transiently under concurrent attach/detach (e.g. +* bpf_scx_unreg() clears @ops->priv before kdata is freed). +* Continue with the scx_root path so single-sched users keep +* working, sub-sched users see no scheduler. +*/ + }
Does this fallback to scx_root trigger a denial of service in multi-sched environments?
If root->ops.sub_attach is true, the fallback bypasses the return root; path and instead hits scx_error(root, "Unassociated program executing with sub-schedulers").
Because scx_error() is a macro that disables the BPF scheduler and forces a system-wide fallback to CFS, could encountering this transient ops->priv == NULL state instantly crash the root scheduler?
Can this fallback to scx_root break isolation and allow cross-scheduler state corruption?
When a scheduler is detached, bpf_scx_unreg() clears ops->priv to NULL. However, asynchronous execution contexts like bpf_timer or workqueues armed by the detached scheduler can still fire.
If this stray program calls a kfunc, it observes ops->priv == NULL and now falls back to returning the globally active scx_root.
If an entirely different scheduler has since been attached, would the stray program bypass isolation boundaries and directly manipulate the new scheduler's state? Prior to this patch, it safely returned NULL.
This isn't a bug introduced by this patch, but does using ops->priv to track the scheduler instance inherently break sub-schedulers?
Because ops->priv is a single pointer on the shared struct_ops map (kdata), attaching the same map to multiple cgroups will sequentially overwrite ops->priv. It will only track the most recently attached scheduler.
If a BPF program executes for an older cgroup's scheduler, will it read ops->priv, receive the newer cgroup's scheduler, and operate on the wrong state?
Quoted 3 lines
kernel/sched/ext_internal.h +0
-0root =rcu_dereference_all (scx_root);if (root) {
Signature · 1 line
Sashiko AI review · https://sashiko.dev/#/patchset/[email protected]?part=1