sched/fair: Preserve newidle cost decay across domains
PATCH 1/1 sched/fair: Preserve newidle cost decay across domains
From: Li RongQing <[email protected]>
In sched_balance_domains(), the result of update_newidle_cost() is currently assigned directly to need_decay for each scheduling domain. As a result, a decay reported by an earlier domain can be overwritten by a later domain that does not require decay.
For example, if an earlier domain reports a decay and the last domain does not, need_decay will be cleared before the loop exits. This causes the rq-wide max_idle_balance_cost update to be skipped even though one of the visited domains has decayed its newidle cost.
Accumulate the result of update_newidle_cost() in need_decay so that a decay reported by any visited domain is preserved.
This restores the aggregate semantics of need_decay and ensures that rq->max_idle_balance_cost is updated when any visited domain requires decay.
This restores the aggregate semantics of need_decay that existed before e60b56e46b38 and ensures that rq->max_idle_balance_cost is updated when any visited domain requires decay.
--- kernel/sched/fair.c | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-)
kernel/sched/fair.c +1 -1
@@ -13982,7 +13982,7 @@ static void sched_balance_domains(struct rq *rq, enum cpu_idle_type idle)* Decay the newidle max times here because this is a regular * visit to all the domains. */ - need_decay =update_newidle_cost (sd,0 ,0 ); + need_decay |=update_newidle_cost (sd,0 ,0 ); max_cost += sd->max_newidle_lb_cost;/*
Signature · 1 line
2.9.4