PATCH 1/1 power: supply: pf1550: drain IRQ work before unregistering supplies

The VBUS work calls power_supply_changed(), but its managed cancellation is registered before the supplies. Cleanup can therefore unregister a supply while IRQ-triggered work is still pending.

Commit 838767f50747 ("power: supply: pf1550: Fix use-after-free in power_supply_changed()") moved IRQ requests after supply registration, but left work cancellation before the supplies. That change protects the direct IRQ callbacks, while this fix drains the work they queue.

Register the three work items after both supplies and before the IRQs. Cleanup then frees the IRQ producers, drains the work, and unregisters the supplies.

The teardown ordering issue was found by static analysis.

Fixes 4b6b6433a97d ("power: supply: pf1550: add battery charger support")
Assisted-by LLM
---
 drivers/power/supply/pf1550-charger.c | 32 +++++++++++++--------------
 1 file changed, 16 insertions(+), 16 deletions(-)
drivers/power/supply/pf1550-charger.c +16 -16
index 2ead1df60e65..e3d4e9817f91 100644
@@ -566,6 +566,22 @@ static int pf1550_charger_probe(struct platform_device *pdev)
 
 	platform_set_drvdata(pdev, chg);
 
+	psy_cfg.drv_data = chg;
+
+	chg->charger = devm_power_supply_register(&pdev->dev,
+						  &pf1550_charger_desc,
+						  &psy_cfg);
+	if (IS_ERR(chg->charger))
+		return dev_err_probe(&pdev->dev, PTR_ERR(chg->charger),
+				     "failed: power supply register\n");
+
+	chg->battery = devm_power_supply_register(&pdev->dev,
+						  &pf1550_battery_desc,
+						  &psy_cfg);
+	if (IS_ERR(chg->battery))
+		return dev_err_probe(&pdev->dev, PTR_ERR(chg->battery),
+				     "failed: power supply register\n");
+
 	ret = devm_delayed_work_autocancel(chg->dev, &chg->vbus_sense_work,
 					   pf1550_chg_vbus_work);
 	if (ret)
@@ -584,22 +600,6 @@ static int pf1550_charger_probe(struct platform_device *pdev)
 		return dev_err_probe(chg->dev, ret,
 				     "failed to add battery sense work\n");
 
-	psy_cfg.drv_data = chg;
-
-	chg->charger = devm_power_supply_register(&pdev->dev,
-						  &pf1550_charger_desc,
-						  &psy_cfg);
-	if (IS_ERR(chg->charger))
-		return dev_err_probe(&pdev->dev, PTR_ERR(chg->charger),
-				     "failed: power supply register\n");
-
-	chg->battery = devm_power_supply_register(&pdev->dev,
-						  &pf1550_battery_desc,
-						  &psy_cfg);
-	if (IS_ERR(chg->battery))
-		return dev_err_probe(&pdev->dev, PTR_ERR(chg->battery),
-				     "failed: power supply register\n");
-
 	for (i = 0; i < PF1550_CHARGER_IRQ_NR; i++) {
 		irq = platform_get_irq(pdev, i);
 		if (irq < 0)
#1 lore raw
Quoted 10 lines · Myeonghun Pak

The VBUS work calls power_supply_changed(), but its managed cancellation is registered before the supplies. Cleanup can therefore unregister a supply while IRQ-triggered work is still pending.

Commit 838767f50747 ("power: supply: pf1550: Fix use-after-free in power_supply_changed()") moved IRQ requests after supply registration, but left work cancellation before the supplies. That change protects the direct IRQ callbacks, while this fix drains the work they queue.

[...]

Applied, thanks!

[1/1] power: supply: pf1550: drain IRQ work before unregistering supplies

      commit: 4856b49317ccd4ce96a0e8970df7d13ce8975a02