Skip to contentSkip to conversation

extcon: ptn5150: request the IRQ after the resources its work uses

PATCH In review Myeonghun Pak 2 participants 2 messages Nov 12

Subsystems (3)
lore
Share & tools
lore
#0 lore raw

PATCH 1/1 extcon: ptn5150: request the IRQ after the resources its work uses

The IRQ is requested before the work cleanup action is registered. On unbind, devres cancels irq_work and releases its switches before freeing the IRQ, allowing an interrupt to queue work against released resources. Earlier probe failures can leave the work uncancelled.

Request the IRQ after registering the cleanup action so devres frees it before cancelling the work and releasing its resources. Keep ptn5150_init_dev_type() after the IRQ request: clearing pending status before installing the falling-edge handler can lose an interrupt.

Found by a static analysis tool under development.

Compile-tested with W=1 for arm64 and x86_64.
Not tested on hardware.

Fixes 782cd939cbe0 ("extcon: ptn5150: Add queue work sync before driver release")

---

 drivers/extcon/extcon-ptn5150.c | 30 +++++++++++++++---------------
 1 file changed, 15 insertions(+), 15 deletions(-)
drivers/extcon/extcon-ptn5150.c +15 -15
index 0b96b58b4212..6ee4edd7adbd 100644
@@ -307,16 +307,6 @@ static int ptn5150_i2c_probe(struct i2c_client *i2c)
 		}
 	}
 
-	ret = devm_request_threaded_irq(dev, info->irq, NULL,
-					ptn5150_irq_handler,
-					IRQF_TRIGGER_FALLING |
-					IRQF_ONESHOT,
-					i2c->name, info);
-	if (ret < 0) {
-		dev_err(dev, "failed to request handler for INTB IRQ\n");
-		return ret;
-	}
-
 	/* Allocate extcon device */
 	info->edev = devm_extcon_dev_allocate(info->dev, ptn5150_extcon_cable);
 	if (IS_ERR(info->edev)) {
@@ -338,11 +328,6 @@ static int ptn5150_i2c_probe(struct i2c_client *i2c)
 	extcon_set_property_capability(info->edev, EXTCON_USB_HOST,
 					EXTCON_PROP_USB_TYPEC_POLARITY);
 
-	/* Initialize PTN5150 device and print vendor id and version id */
-	ret = ptn5150_init_dev_type(info);
-	if (ret)
-		return -EINVAL;
-
 	connector = device_get_named_child_node(dev, "connector");
 	if (connector) {
 		info->orient_sw = fwnode_typec_switch_get(connector);
@@ -362,6 +347,21 @@ static int ptn5150_i2c_probe(struct i2c_client *i2c)
 	if (ret)
 		return ret;
 
+	ret = devm_request_threaded_irq(dev, info->irq, NULL,
+					ptn5150_irq_handler,
+					IRQF_TRIGGER_FALLING |
+					IRQF_ONESHOT,
+					i2c->name, info);
+	if (ret < 0) {
+		dev_err(dev, "failed to request handler for INTB IRQ\n");
+		return ret;
+	}
+
+	/* Initialize PTN5150 device and print vendor id and version id */
+	ret = ptn5150_init_dev_type(info);
+	if (ret)
+		return -EINVAL;
+
 	/*
 	 * Update current extcon state if for example OTG connection was there
 	 * before the probe

base-commit: 630059a5a632377b9b7b487baccde92b7ae1dd47

Signature · 1 line
2.43.0
maintainer Reviewed-by on v1 1/1
#1 lore raw
Quoted 11 lines · Myeonghun Pak

The IRQ is requested before the work cleanup action is registered. On unbind, devres cancels irq_work and releases its switches before freeing the IRQ, allowing an interrupt to queue work against released resources. Earlier probe failures can leave the work uncancelled.

Request the IRQ after registering the cleanup action so devres frees it before cancelling the work and releasing its resources. Keep ptn5150_init_dev_type() after the IRQ request: clearing pending status before installing the falling-edge handler can lose an interrupt.

Found by a static analysis tool under development.

LLM is not a static analysis tool. Mentioning unknown tool is pointless.

Quoted 3 lines

Compile-tested with W=1 for arm64 and x86_64.
Not tested on hardware.

Drop from commit msg. Such information goes to changelog, not commit msg.

Quoted 3 lines
Fixes 782cd939cbe0 ("extcon: ptn5150: Add queue work sync before driver release")

With above fixed:

Best regards,
Krzysztof