releases scheduling
Hi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of November
However, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).
The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3
Opinions are welcome.
Quoted 33 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.
Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
I think moving to quarterly releases is a good idea. Your proposal to do this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Should we consider changing the release numbering at the same time? It's difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
Tim
+1 for Ubuntu version numbering
Quoted 54 lines · Tim
Quoted 33 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
I think moving to quarterly releases is a good idea. Your proposal to do this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Should we consider changing the release numbering at the same time? It's difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
Tim
Signature · 3 lines
*Arnon Warshavsky* *Qwilt | work: +972-72-2221634 | mobile: +972-50-8583058 | [email protected] <[email protected]>*
Quoted 37 lines · Tim
Quoted 37 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3
Quoted 5 lines
Quoted 1 line
Opinions are welcome.
I think moving to quarterly releases is a good idea. Your proposal to do this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Should we consider changing the release numbering at the same time? It's difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
+1 for the Ubuntu number and the LTS
Quoted 4 lines
Tim
Regards,
Keith
+100 for the LTS
One of the bigger challenges for products using DPDK is that there is so much change going in each release with very limited testing. Trying to even remotely keep up is too risky. We end up back-porting various fixes and enhancements to whatever version we are on (1.6rc2 currently).
Jay
Quoted 68 lines · Keith
Quoted 33 lines · Tim
Quoted 33 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 7 lines
Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
I think moving to quarterly releases is a good idea. Your proposal to do
this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Quoted 2 lines
Should we consider changing the release numbering at the same time? It's
difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
+1 for the Ubuntu number and the LTS
Quoted 4 lines
Tim
Regards,
Keith
Hi,
You could just bump the major version for the first release of the new year - in this case, we would make 2.6 be 3.0. It achieves the same objective without having a big discontinuity in the release numbers.
Thanks,
Dave.
Quoted 46 lines · Tim
Quoted 33 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
I think moving to quarterly releases is a good idea. Your proposal to do this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Should we consider changing the release numbering at the same time? It's difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
Tim
Signature · 3 lines
Dave Neary - NFV/SDN Community Strategy Open Source and Standards, Red Hat - http://community.redhat.com Ph: +1-978-399-2182 / Cell: +1-978-799-3338
Quoted 5 lines · dev on behalf of Dave Neary
Hi,
You could just bump the major version for the first release of the new year - in this case, we would make 2.6 be 3.0. It achieves the same objective without having a big discontinuity in the release numbers.
I see the YY.MM.PP (PP is patch number) as the simplest way to keep track of when a release was done. Trying to remember when 3.4 or even 1.8 was released is difficult with a pure version number format without a good memory or cheat sheet. The YY.MM give us a great way to tell when a release was made and we can still have patch releases if required. Moving to a YY.MM format is better then moving to 3.0 as it still does not let me know when a release was done. If we pick say 16.03 as the LTS then every X years say 2 years (18.03 LTS) we then know which version is the LTS version. The nice part about 2 or 4 year LTS releases we know that a even number year would have a LTS release. I am open to whatever number of years people believe is the best.
Quoted 46 lines
Thanks,
Dave.Quoted 39 lines · Tim
Quoted 38 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Sunday, December 13, 2015 7:23 PM
To: [email protected]
Subject: [dpdk-dev] releases schedulingHi all,
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long.
Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
Quoted 13 lines
Quoted 7 lines
I think moving to quarterly releases is a good idea. Your proposal to do this in a gradual way, so that we don't change the 2.3 dates, also makes sense.
Should we consider changing the release numbering at the same time? It's difficult to keep track of when each 2.x release is due, and we don't have any criteria in place for moving to 3.x in future. Many people like the Ubuntu numbering scheme of Year.Month. Should we consider adopting that convention? If we move in future to a model where we have long-term support releases (something that was touched on in Dublin), then we could append an LTS designation to the release number.
Tim
Signature · 3 lines
Dave Neary - NFV/SDN Community Strategy Open Source and Standards, Red Hat - http://community.redhat.com Ph: +1-978-399-2182 / Cell: +1-978-799-3338
Regards,
Keith
Quoted 1 line · Keith
I see the YY.MM.PP (PP is patch number) as the simplest way to keep track of when a release was done.
+1
I like it.
2015-12-13 20:22, Thomas Monjalon:
Quoted 23 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.
Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.html
There were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
Quoted 34 lines · dev on behalf of Thomas Monjalon
2015-12-13 20:22, Thomas Monjalon:
Quoted 23 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.html
Quoted 7 lines
There were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
I think we need to decide on the YY.MM.PP format then select the dates for release now. This way we have it out of the way.
The date of the release is the first day of the month for the release.
March 1st - 15th is 16.03 Patches for 16.03 are from now to Feb 15th
Try to get the release out as close to the 1st as possible. This one is a short release.
June 1st - 15th is 16.06 For 16.06 March 1st to May 15th Sept 1st - 15th is 16.09 For 16.09 June 1st to Aug 15th Dec 1st - 15th is 16.12 For 16.12 Sept 1st to Nov 15th.
The 15th just before the release month is the deadline for patches, gives up 2 weeks before the release date and to the 15th of the release month to get the release out, but we should try for the 1st. The deadline is just a suggestion here or example, we can adjust it to something else.
Tag 2.2.0 in the repo also as 15.12 plus I would suggest we tag it as LTS Long Term Support as well.
Here are highlights from the other thread around the patch of version numbers.
http://dpdk.org/ml/archives/dev/2015-December/030560.html
Quoted 34 lines
Quoted 34 lines
Quoted 33 lines
Quoted 3 lines
Quoted 3 lines
What about the discussion about the numbering of DPDK versions in
future? The
Quoted 1 line
Quoted 1 line
latest suggest which was +1'ed a number of times was to use an
Ubuntu-style
Quoted 1 line
Quoted 1 line
YY.MM naming scheme. I don't think there was any objections to such a
scheme
Quoted 1 line
Quoted 1 line
so is it not premature to start naming the new release now using the
old scheme?
Quoted 2 lines
Before doing any change on master, it is better to change the version
number
Quoted 1 line
to avoid confusion with the previous release. Example, the generated
doc does
Quoted 3 lines
not show 2.2 anymore.
About changing the numbering, no problem, it can be changed at any time
before
Quoted 1 line
the RC1. At the moment there was a proposal for YY.MM and a proposal
for 3.0.
Quoted 1 line
Even the YY.MM needs more discussion as it is not clear if we should
use 15.03
Quoted 1 line
or 15.04 for the release ending at the end of March. It seems
reasonnable to
Quoted 1 line
expect a release the next day, i.e. in April.
I believe the numbering should be 16.03, 16.06, 16.09 and 16.12. As for 2.2.0 we should give it a second name 15.12 == 2.2.0 (and add a label in Git), then we can start with 16.03 as the next release number. All efforts should be made to meet the months 3, 6, 9 and 12, if one happens to be into the next month for some reason then we still label and call it the correct release number.
Quoted 7 lines
Quoted 1 line
When you say "the correct release number" I think you mean that if a release is planned for March but is actually completed in April, it would still be called 16.03. I believe Ubuntu take the opposite approach, and if a release does slip it gets the number for the month it's actually completed in (16.04 in this example). There are advantages and disadvantages to both approaches. We'll need to decide which approach is best.
I just figured keeping the number the release number as expected was the best. I do not remember Ubuntu release numbers not on 4 or 10, but I could wrong. Most likely moving the release date to the first of the month is the right solution anyway. The only problem with 16.04 or April 1st is April fools day, but it really is not a big problem as long as we do not call it April 1st only YY.04.
Quoted 2 lines
The best way to avoid confusion it to move from planning releases for the end of a month to planning them for the start of a month. So, as Thomas suggested above, we shouldn't plan our next release for the end of March, but for the start of April instead. That way it becomes 16.04, and we have a month of leeway in case there is a slip.
I guess the release numbers would be 16.04, 16.07, 16.10 and then 17.01, 17.04, 17.07, 17.10 which is fine. I just liked the 3, 6, 9, 12 number scheme multiple of 3. If we stick with 3,6,9,12 and 16.03 release date would be 2016.03.01 for the first of the month. The next release after 15.12 will be a short release cycle and we get to keep the multiple of 3. :-) Plus with the end of year stuff it would be best to start a release on Dec 1st then on Jan 1st, right?
Regards,
Keith
2015-12-19 02:16, Wiles, Keith:
Quoted 52 lines · dev on behalf of Thomas Monjalon
Quoted 35 lines
2015-12-13 20:22, Thomas Monjalon:
Quoted 23 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.htmlQuoted 7 lines
There were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
I think we need to decide on the YY.MM.PP format then select the dates for release now. This way we have it out of the way.
The date of the release is the first day of the month for the release.
March 1st - 15th is 16.03 Patches for 16.03 are from now to Feb 15th
Try to get the release out as close to the 1st as possible. This one is a short release.
Quoted 7 lines
June 1st - 15th is 16.06 For 16.06 March 1st to May 15th Sept 1st - 15th is 16.09 For 16.09 June 1st to Aug 15th Dec 1st - 15th is 16.12 For 16.12 Sept 1st to Nov 15th.The 15th just before the release month is the deadline for patches, gives up 2 weeks before the release date and to the 15th of the release month to get the release out, but we should try for the 1st. The deadline is just a suggestion here or example, we can adjust it to something else.
Tag 2.2.0 in the repo also as 15.12 plus I would suggest we tag it as LTS Long Term Support as well.
Hi Keith,
I'm confused. Have you read the proposal above and the patch above? I add it here again to make it more visible:
http://dpdk.org/ml/archives/web/2015-December/000008.html
And I copy-paste here:
The release cycles are progressively shorten during 2016. Release 16.04
Proposal deadline: January 31 Integration deadline: March 10
Release: April 7
Release 16.07
Proposal deadline: May 8
Integration deadline: June 16
Release: July 18
Release 16.11
Proposal deadline: August 28 Integration deadline: September 30
Release: November 2
Release 17.02
Release: February 1
Release 17.05
Release: May 2
Release 17.08
Release: August 1
Release 17.11
Release: November 2
Quoted 79 lines · Thomas Monjalon
2015-12-19 02:16, Wiles, Keith:
Quoted 52 lines · dev on behalf of Thomas Monjalon
Quoted 35 lines
2015-12-13 20:22, Thomas Monjalon:
Quoted 23 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.htmlQuoted 7 lines
There were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
I think we need to decide on the YY.MM.PP format then select the dates for release now. This way we have it out of the way.
The date of the release is the first day of the month for the release.
March 1st - 15th is 16.03 Patches for 16.03 are from now to Feb 15th
Try to get the release out as close to the 1st as possible. This one is a short release.Quoted 7 lines
June 1st - 15th is 16.06 For 16.06 March 1st to May 15th Sept 1st - 15th is 16.09 For 16.09 June 1st to Aug 15th Dec 1st - 15th is 16.12 For 16.12 Sept 1st to Nov 15th.The 15th just before the release month is the deadline for patches, gives up 2 weeks before the release date and to the 15th of the release month to get the release out, but we should try for the 1st. The deadline is just a suggestion here or example, we can adjust it to something else.
Tag 2.2.0 in the repo also as 15.12 plus I would suggest we tag it as LTS Long Term Support as well.
Hi Keith,
I'm confused. Have you read the proposal above and the patch above? I add it here again to make it more visible:http://dpdk.org/ml/archives/web/2015-December/000008.htmlAnd I copy-paste here:
The release cycles are progressively shorten during 2016. Release 16.04
Proposal deadline: January 31 Integration deadline: March 10
Release: April 7
Release 16.07
Proposal deadline: May 8
Integration deadline: June 16
Release: July 18
Release 16.11
Proposal deadline: August 28 Integration deadline: September 30
Release: November 2
Quoted 8 lines
Release 17.02
Release: February 1
Release 17.05
Release: May 2
Release 17.08
Release: August 1
Release 17.11
Release: November 2
Hi Thomas,
The reason I keep stating my dates above is to make the release month the same each year not move them around each year. If we move the release months around it will be difficult to determine when the next release is to be done. I think we are both trying to increase the number of releases per year to reduce the work per release. I am trying to get a fixed release month each year just like Ubuntu has 04 and 10 each year.
Please consider making the months fixed instead of having them move a bit each year.
I will shut up about the dates now and let you/others decide, I do not want to upset anyone. I hope I have been a bit clearer as to what I was trying to accomplish with my comments.
Quoted 1 line
Regards,
Keith
2015-12-19 16:21, Wiles, Keith:
Quoted 88 lines · Thomas Monjalon
Quoted 78 lines
2015-12-19 02:16, Wiles, Keith:
Quoted 51 lines · dev on behalf of Thomas Monjalon
Quoted 34 lines
2015-12-13 20:22, Thomas Monjalon:
Quoted 23 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4 months for a feature. That's why I suggest to progressively shorten release terms:
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2 months long. Then we had 2 other months to discuss, merge and fix.
We should shorten only the first period.Quoted 5 lines
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.htmlQuoted 7 lines
There were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
I think we need to decide on the YY.MM.PP format then select the dates for release now. This way we have it out of the way.
The date of the release is the first day of the month for the release.
March 1st - 15th is 16.03 Patches for 16.03 are from now to Feb 15th
Try to get the release out as close to the 1st as possible. This one is a short release.Quoted 7 lines
June 1st - 15th is 16.06 For 16.06 March 1st to May 15th Sept 1st - 15th is 16.09 For 16.09 June 1st to Aug 15th Dec 1st - 15th is 16.12 For 16.12 Sept 1st to Nov 15th.The 15th just before the release month is the deadline for patches, gives up 2 weeks before the release date and to the 15th of the release month to get the release out, but we should try for the 1st. The deadline is just a suggestion here or example, we can adjust it to something else.
Tag 2.2.0 in the repo also as 15.12 plus I would suggest we tag it as LTS Long Term Support as well.
Hi Keith,
I'm confused. Have you read the proposal above and the patch above? I add it here again to make it more visible:http://dpdk.org/ml/archives/web/2015-December/000008.htmlAnd I copy-paste here:
The release cycles are progressively shorten during 2016. Release 16.04
Proposal deadline: January 31 Integration deadline: March 10
Release: April 7
Release 16.07
Proposal deadline: May 8
Integration deadline: June 16
Release: July 18
Release 16.11
Proposal deadline: August 28 Integration deadline: September 30
Release: November 2Quoted 8 lines
Release 17.02
Release: February 1
Release 17.05
Release: May 2
Release 17.08
Release: August 1
Release 17.11
Release: November 2
Quoted 5 lines
Hi Thomas,
The reason I keep stating my dates above is to make the release month the same each year not move them around each year. If we move the release months around it will be difficult to determine when the next release is to be done. I think we are both trying to increase the number of releases per year to reduce the work per release. I am trying to get a fixed release month each year just like Ubuntu has 04 and 10 each year.
Please consider making the months fixed instead of having them move a bit each year.
Yes that's what I considered. The dates are not the same in 2016 and 2017 because of the progressive change.
But 2017 and 2018 should be identical.
And more importantly, these dates should respect the major holidays.
Quoted 2 lines
I will shut up about the dates now and let you/others decide, I do not want to upset anyone. I hope I have been a bit clearer as to what I was trying to accomplish with my comments.
Yes thank you Keith, it's a lot clearer.
When your comments are argumented, it's a pleasure to discuss :)
Quoted 118 lines
-----Original Message-----
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Sent: Saturday, December 19, 2015 8:14 PM
To: Wiles, Keith
Cc: [email protected]
Subject: Re: [dpdk-dev] releases scheduling2015-12-19 16:21, Wiles, Keith:
Quoted 1 line
On 12/19/15, 3:47 AM, "Thomas Monjalon" <[email protected]>
Quoted 11 lines · wrote:
Quoted 11 lines
2015-12-19 02:16, Wiles, Keith:
Quoted 10 lines · dev on behalf of Thomas Monjalon
Quoted 9 lines
2015-12-13 20:22, Thomas Monjalon:
Quoted 8 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4
months for
Quoted 1 line
Quoted 1 line
Quoted 1 line
Quoted 1 line
Quoted 1 line
a feature. That's why I suggest to progressively shorten release
terms:
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2
months long.
Quoted 17 lines
Quoted 17 lines
Quoted 17 lines
Quoted 17 lines
Quoted 8 lines
Then we had 2 other months to discuss, merge and fix. We should shorten only the first period.
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.htmlThere were some discussions to change the numbering scheme and rename 2.3 to 16.04. The patch (with arguments) is welcome. I won't do the patch myself because I don't care :)
Quoted 8 lines
Quoted 8 lines
Quoted 8 lines
Quoted 3 lines
Another discussion was about having a long term support, i.e. doing some backport maintenance during a given period for some selected releases.
I think we need to decide on the YY.MM.PP format then select the dates for release now. This way we have it out of the way.
The date of the release is the first day of the month for the
release.
Quoted 2 lines
Quoted 2 lines
Quoted 2 lines
March 1st - 15th is 16.03 Patches for 16.03 are from now to Feb
15th
Quoted 7 lines
Quoted 7 lines
Quoted 7 lines
Try to get the release out as close to the 1st as possible. This one is a short release.
June 1st - 15th is 16.06 For 16.06 March 1st to May 15th Sept 1st - 15th is 16.09 For 16.09 June 1st to Aug 15th Dec 1st - 15th is 16.12 For 16.12 Sept 1st to Nov 15th.The 15th just before the release month is the deadline for patches,
gives up 2 weeks before the release date and to the 15th of the release month to get the release out, but we should try for the 1st. The deadline is just a suggestion here or example, we can adjust it to something else.
Quoted 2 lines
Quoted 2 lines
Quoted 2 lines
Tag 2.2.0 in the repo also as 15.12 plus I would suggest we tag it
as LTS Long Term Support as well.
Quoted 28 lines
Quoted 19 lines
Hi Keith,
I'm confused. Have you read the proposal above and the patch above? I add it here again to make it more visible:http://dpdk.org/ml/archives/web/2015-December/000008.htmlAnd I copy-paste here:
The release cycles are progressively shorten during 2016. Release 16.04
Proposal deadline: January 31 Integration deadline: March 10
Release: April 7
Release 16.07
Proposal deadline: May 8
Integration deadline: June 16
Release: July 18
Release 16.11
Proposal deadline: August 28 Integration deadline: September 30
Release: November 2Quoted 8 lines
Release 17.02
Release: February 1
Release 17.05
Release: May 2
Release 17.08
Release: August 1
Release 17.11
Release: November 2Quoted 3 lines
Hi Thomas,
The reason I keep stating my dates above is to make the release month
the same each year not move them around each year. If we move the release months around it will be difficult to determine when the next release is to be done. I think we are both trying to increase the number of releases per year to reduce the work per release. I am trying to get a fixed release month each year just like Ubuntu has 04 and 10 each year.
Quoted 1 line
Quoted 8 lines
Quoted 1 line
Please consider making the months fixed instead of having them move a
bit each year.
Yes that's what I considered. The dates are not the same in 2016 and 2017
because of the progressive change.
But 2017 and 2018 should be identical.
And more importantly, these dates should respect the major holidays.
+1
I think this is a good compromise. It changes the release dates for 2016 gradually, so it avoids disrupting any existing plans. It also avoids the major holiday periods as much as possible, and gives us a consistent release schedule from 2017 onwards.
Quoted 8 lines
Quoted 2 lines
I will shut up about the dates now and let you/others decide, I do not
want to upset anyone.
Quoted 1 line
I hope I have been a bit clearer as to what I was trying to accomplish
with my comments.
Yes thank you Keith, it's a lot clearer.
When your comments are argumented, it's a pleasure to discuss :)
2015-12-19 22:58, O'Driscoll, Tim:
Quoted 41 lines
From: dev [mailto:[email protected]] On Behalf Of Thomas Monjalon
Quoted 40 lines
2015-12-19 16:21, Wiles, Keith:
Quoted 12 lines · Thomas Monjalon
Quoted 11 lines
2015-12-19 02:16, Wiles, Keith:
Quoted 10 lines · dev on behalf of Thomas Monjalon
Quoted 9 lines
2015-12-13 20:22, Thomas Monjalon:
Quoted 8 lines
We need to define the deadlines for the next releases. During 2015, we were doing a release every 4 months. If we keep the same pace, the next releases would be:
2.3: end of March
2.4: end of July
2.5: end of NovemberHowever, things move fast and it may be a bit long to wait 4
months for
Quoted 1 line
Quoted 1 line
Quoted 1 line
Quoted 1 line
Quoted 1 line
a feature. That's why I suggest to progressively shorten release
terms:
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
Quoted 11 lines
2.3: end of March
2.4: mid July
2.5: end of October
and continue with a release every 3 months:
2.6: end of January
2.7: end of April
2.8: end of July
This planning would preserve some of the major holiday periods (February, May, August, December).The first period, for the first submission of a feature, was 2
months long.
Quoted 12 lines
Quoted 12 lines
Quoted 12 lines
Quoted 12 lines
Quoted 8 lines
Then we had 2 other months to discuss, merge and fix. We should shorten only the first period.
Anyway, the next deadlines should be unchanged:
- January 31: end of first submission phase
- March 31: release 2.3Opinions are welcome.
It seems everybody agree with this new scheduling. The web site will be updated accordingly:
http://dpdk.org/ml/archives/web/2015-December/000008.html
[...]
Quoted 24 lines
Quoted 24 lines
Quoted 24 lines
Quoted 24 lines
I add it here again to make it more visible:
http://dpdk.org/ml/archives/web/2015-December/000008.htmlAnd I copy-paste here:
The release cycles are progressively shorten during 2016. Release 16.04
Proposal deadline: January 31 Integration deadline: March 10
Release: April 7
Release 16.07
Proposal deadline: May 8
Integration deadline: June 16
Release: July 18
Release 16.11
Proposal deadline: August 28 Integration deadline: September 30
Release: November 2
Release 17.02
Release: February 1
Release 17.05
Release: May 2
Release 17.08
Release: August 1
Release 17.11
Release: November 2
[...]
Quoted 9 lines
Quoted 8 lines
Quoted 1 line
Please consider making the months fixed instead of having them move a
bit each year.
Yes that's what I considered. The dates are not the same in 2016 and 2017
because of the progressive change.
But 2017 and 2018 should be identical.
And more importantly, these dates should respect the major holidays.
Quoted 3 lines
+1
I think this is a good compromise. It changes the release dates for 2016 gradually, so it avoids disrupting any existing plans. It also avoids the major holiday periods as much as possible, and gives us a consistent release schedule from 2017 onwards.
So it will be applied and visble on the web site.
Thanks for your comments