Commit moratorium to staging
Committers,
It looks like osstest is a bit behind because of ARM64 boxes (they are fully loaded) and XP testing (they now have been removed see [1]).
I'd like to cut the next rc when staging == master, so please stop committing today.
Ian forced pushed osstest today, so hopefully we can get a push tomorrow.
Cheers,
[1] https://lists.xenproject.org/archives/html/xen-devel/2017-05/msg00425.html
Signature · 6 lines
Julien Grall _______________________________________________ Xen-devel mailing list [email protected] https://lists.xen.org/xen-devel
Julien Grall writes ("Commit moratorium to staging"):
Quoted 5 lines
It looks like osstest is a bit behind because of ARM64 boxes (they are fully loaded) and XP testing (they now have been removed see [1]).
I'd like to cut the next rc when staging == master, so please stop committing today.
I force pushed xen#master earlier and there is no longer any need for this moratorium.
Of course any commits to staging still need RM approval from Julien.
Thanks,
Ian.
_______________________________________________
Xen-devel mailing list
[email protected]
https://lists.xen.org/xen-devel