Planning for 1.0 (and freezing the master branch)
Hi,
I've posted an initial proposal for the 1.0 release on the wiki[1].
The release would be targeted for December 1st. Unlike previous releases, I'm proposing that instead of forking master into a stable branch and releasing from there, we stop taking features into master and all work on stablizing master.
Historically, we forked stable for the releases simply because it was the least intrusive way to get us on a somewhat reasonable release schedule. I think especially since we're targeting a 1.0, we're ready to get a bit more serious about releases.
I see the following advantages in using master for releases:
1) All maintainers are participating in the process which means releases are much less likely to be delayed due to lack of time from a single person.
2) Everyone (contributors) are forced to focus on stability which should improve the release's quality.
3) Feature development can still happen in maintainers trees. I think this is an important step to moving to a merge-window based development model which I think will be our best way to scale long term.
Obviously, this will only work well if all the maintainers participate so I'd really like to hear what everyone thinks about this.
[1] http://wiki.qemu.org/Planning/1.0
Regards,
Anthony Liguori
Quoted 9 lines · Anthony Liguori
Hi,
I've posted an initial proposal for the 1.0 release on the wiki[1].
The release would be targeted for December 1st. Unlike previous releases, I'm proposing that instead of forking master into a stable branch and releasing from there, we stop taking features into master and all work on stablizing master.
Quoted 4 lines
Historically, we forked stable for the releases simply because it was the least intrusive way to get us on a somewhat reasonable release schedule. I think especially since we're targeting a 1.0, we're ready to get a bit more serious about releases.
Even more historically, with CVS, not forking was the only way.
Quoted 8 lines
I see the following advantages in using master for releases:
1) All maintainers are participating in the process which means releases are much less likely to be delayed due to lack of time from a single person.
2) Everyone (contributors) are forced to focus on stability which should improve the release's quality.
Quoted 8 lines
3) Feature development can still happen in maintainers trees. I think this is an important step to moving to a merge-window based development model which I think will be our best way to scale long term.
Obviously, this will only work well if all the maintainers participate so I'd really like to hear what everyone thinks about this.
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I'm not convinced about merge window model at least how it's used with Linux kernel development. There will be a lot of breakage during the merge window. Major changes at the same time would need major rebasing efforts since they would be developed and merged within same time frame. Also pretty strong coordination would be needed. We don't have the luxury of infinite army of monkeys lead by genius who has dedicated his entire life to the project like kernel has. I'd rather try to keep the code base at (sort of) release quality at all times and merge changes every now and then.
Quoted 10 lines · Blue Swirl
Quoted 9 lines · Anthony Liguori
Hi,
I've posted an initial proposal for the 1.0 release on the wiki[1].
The release would be targeted for December 1st. Unlike previous releases, I'm proposing that instead of forking master into a stable branch and releasing from there, we stop taking features into master and all work on stablizing master.
Quoted 6 lines
Quoted 4 lines
Historically, we forked stable for the releases simply because it was the least intrusive way to get us on a somewhat reasonable release schedule. I think especially since we're targeting a 1.0, we're ready to get a bit more serious about releases.
Even more historically, with CVS, not forking was the only way.
Indeed :-)
Quoted 7 lines
Quoted 7 lines
3) Feature development can still happen in maintainers trees. I think this is an important step to moving to a merge-window based development model which I think will be our best way to scale long term.
Obviously, this will only work well if all the maintainers participate so I'd really like to hear what everyone thinks about this.
Quoted 8 lines
Quoted 1 line
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I feel like 2 weeks was too short for this release and releases in the past. Conversely, I feel like more than 2 weeks on a different branch is too long because people move on to shinier things.
That's why I'm proposing 4 weeks of hard freeze w/o opening up a new development branch. That gives us more time to iron out any issues and makes sure people still keep focusing on stability.
I want to move to 4 weeks primarily because I want to increase the amount of release testing we do. We haven't had a really active set of stable releases in a long time so for the most part, the .0 or .1 release is what people are going to be using. I think that means that we should put a bit more effort into making .0 be as strong as it can be.
Quoted 9 lines
I'm not convinced about merge window model at least how it's used with Linux kernel development. There will be a lot of breakage during the merge window. Major changes at the same time would need major rebasing efforts since they would be developed and merged within same time frame. Also pretty strong coordination would be needed. We don't have the luxury of infinite army of monkeys lead by genius who has dedicated his entire life to the project like kernel has. I'd rather try to keep the code base at (sort of) release quality at all times and merge changes every now and then.
That's why I started with a 4 week freeze proposal :-) It gives us a chance to try it out. If it works well, maybe we try 6-8 weeks for 1.1.
If it doesn't, we can drop back down to 2.
As long as we're not making massive changes, I think its a good idea to experiment a bit.
Regards,
Anthony Liguori
Quoted 1 line
Hi,
Quoted 9 lines
Quoted 6 lines
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I feel like 2 weeks was too short for this release and releases in the past.
Well, one reason for the release process not being that smooth is that a big pile of stuff was merged just before 0.15-rc0. First because there was a noticable backlog due to maintainers vacation, and second because a bunch of people wanted there stuff be merged for 0.15.
I think two weeks soft freeze and two weeks hard freeze should work reasonable well. I think shorter release cycles will help too, so the pressure to get stuff in before the freeze is lower as the following release isn't that far away.
So how about this:
- roughly four weeks development phase.
- two weeks soft freeze (aka no big stuff).
- two weeks hard freeze (aka bugfixes only).
Don't be too strict about this, if there is a reason to slip (xmas holiday season, summer vacation time, kvm forum, $bignewfeature took a bit longer to stabilize, $whateverelse) just stretch the development phase (or soft freeze) a bit. We would probably end up with 4-5 releases/year when following this model.
Quoted 2 lines
Quoted 2 lines
I'm not convinced about merge window model at least how it's used with Linux kernel development.
Agree. A short two-week merge window would work out nicely only if we would run a qemu-next so most issues can be sorted beforehand. I don't think we have the man power to actually do that.
Quoted 3 lines
Quoted 3 lines
I'd rather
try to keep the code base at (sort of) release quality at all times and merge changes every now and then.
Agree. I think we are not that bad here today. I'm running qemu from fresh master checkouts quite alot and I rarely hit bugs.
cheers,
Gerd
Quoted 22 lines · Gerd Hoffmann
Hi,
Quoted 9 lines
Quoted 6 lines
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I feel like 2 weeks was too short for this release and releases in the past.
Well, one reason for the release process not being that smooth is that a big pile of stuff was merged just before 0.15-rc0. First because there was a noticable backlog due to maintainers vacation, and second because a bunch of people wanted there stuff be merged for 0.15.
I think two weeks soft freeze and two weeks hard freeze should work reasonable well. I think shorter release cycles will help too, so the pressure to get stuff in before the freeze is lower as the following release isn't that far away.
Quoted 5 lines
So how about this:
- roughly four weeks development phase.
- two weeks soft freeze (aka no big stuff).
- two weeks hard freeze (aka bugfixes only).
This 50% duty cycle would mean that for half of the time, people only work within their forked trees and then try to merge these forks. I think the rate should be something like 80% merging, 20% freeze, which (with one month freeze) would be close to current speed of two releases per year.
I agree releasing more often is better, but for that to work, I'd go for something like:
- 2 months development
- two weeks soft freeze
- fork stable rc0, release after 2 to 4 weeks
This would still give 80/20 rate at the expense of hard freeze only affecting stable fork, yielding four releases per year.
Quoted 23 lines
Don't be too strict about this, if there is a reason to slip (xmas holiday season, summer vacation time, kvm forum, $bignewfeature took a bit longer to stabilize, $whateverelse) just stretch the development phase (or soft freeze) a bit. We would probably end up with 4-5 releases/year when following this model.
Quoted 2 lines
Quoted 2 lines
I'm not convinced about merge window model at least how it's used with Linux kernel development.
Agree. A short two-week merge window would work out nicely only if we would run a qemu-next so most issues can be sorted beforehand. I don't think we have the man power to actually do that.
Quoted 3 lines
Quoted 3 lines
I'd rather
try to keep the code base at (sort of) release quality at all times and merge changes every now and then.Agree. I think we are not that bad here today. I'm running qemu from fresh master checkouts quite alot and I rarely hit bugs.
cheers,
Gerd
Quoted 35 lines · Blue Swirl
Quoted 22 lines · Gerd Hoffmann
Hi,
Quoted 9 lines
Quoted 6 lines
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I feel like 2 weeks was too short for this release and releases in the past.
Well, one reason for the release process not being that smooth is that a big pile of stuff was merged just before 0.15-rc0. First because there was a noticable backlog due to maintainers vacation, and second because a bunch of people wanted there stuff be merged for 0.15.
I think two weeks soft freeze and two weeks hard freeze should work reasonable well. I think shorter release cycles will help too, so the pressure to get stuff in before the freeze is lower as the following release isn't that far away.
Quoted 5 lines
So how about this:
- roughly four weeks development phase.
- two weeks soft freeze (aka no big stuff).
- two weeks hard freeze (aka bugfixes only).This 50% duty cycle would mean that for half of the time, people only work within their forked trees and then try to merge these forks. I think the rate should be something like 80% merging, 20% freeze, which (with one month freeze) would be close to current speed of two releases per year.
Quoted 5 lines
I agree releasing more often is better, but for that to work, I'd go for something like:
- 2 months development
- two weeks soft freeze
- fork stable rc0, release after 2 to 4 weeks
Maybe something more like:
2 months development
-rc0 goes out (master enters soft feature freeze)
2 weeks development in master, stabilization and careful consideration of new features -rc1 goes out (master enters hard feature freeze)
1 week stabilization
-rc2 goes out
1 week stabilization
-rc3 goes out, -rc3 becomes release
I think a shorter cycle could work better long term. I think it needs to be done as part of the master branch though and I'd wait until 1.1 to implement it.
Regards,
Anthony Liguori
Quoted 47 lines · Anthony Liguori
Quoted 40 lines · Blue Swirl
Quoted 26 lines · Gerd Hoffmann
Hi,
Quoted 9 lines
Quoted 6 lines
In general the idea is OK. Especially soft freeze could solve problems like those qemu-ga inclusion had.
Two weeks for soft freeze would be close to OK but I think a month of hard freeze is too long. With the previous releases, the problems in stable were ironed out within a week or two. How about 2 + 2?
I feel like 2 weeks was too short for this release and releases in the past.
Well, one reason for the release process not being that smooth is that a big
pile of stuff was merged just before 0.15-rc0. First because there was a noticable backlog due to maintainers vacation, and second because a bunch of
people wanted there stuff be merged for 0.15.I think two weeks soft freeze and two weeks hard freeze should work reasonable well. I think shorter release cycles will help too, so the pressure to get stuff in before the freeze is lower as the following release
isn't that far away.Quoted 5 lines
So how about this:
- roughly four weeks development phase.
- two weeks soft freeze (aka no big stuff).
- two weeks hard freeze (aka bugfixes only).This 50% duty cycle would mean that for half of the time, people only work within their forked trees and then try to merge these forks. I think the rate should be something like 80% merging, 20% freeze, which (with one month freeze) would be close to current speed of two releases per year.
Quoted 5 lines
I agree releasing more often is better, but for that to work, I'd go for something like:
- 2 months development
- two weeks soft freeze
- fork stable rc0, release after 2 to 4 weeks
Quoted 4 lines
Maybe something more like:
2 months development
-rc0 goes out (master enters soft feature freeze)
Why an rc0 at this point? 0.15-rc0 was in a bad shape because it was forked just after heavy development (ga etc). I'd nominate release candidates only after soft freeze, then there would not be any major changes. Though a rc0 could attract testing efforts from outside and for those, the earlier the better.
Quoted 7 lines
2 weeks development in master, stabilization and careful consideration of new features
-rc1 goes out (master enters hard feature freeze)
1 week stabilization
-rc2 goes out
1 week stabilization
-rc3 goes out, -rc3 becomes release
So at this point master would be released? What's the difference in time between rc3 and release?
Overall this would only give a duty cycle of 67%. For 4 weeks total freeze, the development would need to be 4 months for an 80% duty cycle. But I think this version could work too.
Quoted 8 lines
I think a shorter cycle could work better long term. I think it needs to be done as part of the master branch though and I'd wait until 1.1 to implement it.
Regards,
Anthony Liguori
On 08/14/2011 02:30 PM, Blue Swirl wrote:>> Maybe something more like:
Quoted 6 lines
Quoted 3 lines
2 months development
-rc0 goes out (master enters soft feature freeze)Why an rc0 at this point? 0.15-rc0 was in a bad shape because it was forked just after heavy development (ga etc).
It could be called -beta1 instead of -rc0. We just need to tag it with something.
Quoted 5 lines
I'd nominate release
candidates only after soft freeze, then there would not be any major changes. Though a rc0 could attract testing efforts from outside and for those, the earlier the better.
Quoted 10 lines
Quoted 7 lines
2 weeks development in master, stabilization and careful consideration of new features
-rc1 goes out (master enters hard feature freeze)
1 week stabilization
-rc2 goes out
1 week stabilization
-rc3 goes out, -rc3 becomes releaseSo at this point master would be released? What's the difference in time between rc3 and release?
Ideally, nothing. Having an -rc3 is just a conservative mechanism to make sure that there is an absolute final call for testing before teh release.
Quoted 4 lines
Overall this would only give a duty cycle of 67%. For 4 weeks total freeze, the development would need to be 4 months for an 80% duty cycle. But I think this version could work too.
Yeah, that's more or less what I'm proposing for 1.0 :-)
Regards,
Anthony Liguori
Quoted 10 lines
Quoted 9 lines
I think a shorter cycle could work better long term. I think it needs to be done as part of the master branch though and I'd wait until 1.1 to implement it.
Regards,
Anthony Liguori