drm/scheduler: don't update last scheduled fence in TDR
Subsystems (3)
PATCH 1/1 drm/scheduler: don't update last scheduled fence in TDR
The current sequence in scheduler thread is:
1. update last sched fence
2. job begin (adding to mirror list)
3. job finish (remove from mirror list)
4. back to 1
Since we update last sched prior to joining mirror list, the jobs in mirror list already pass the last sched fence. TDR just run the jobs in mirror list, so we should not update the last sched fences in TDR.
--- drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 --- 1 file changed, 3 deletions(-)
drivers/gpu/drm/scheduler/gpu_scheduler.c +0 -3
@@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched) fence = sched->ops->run_job (s_job);atomic_inc (&sched->hw_rq_count); -dma_fence_put (s_job->entity->last_scheduled); - s_job->entity->last_scheduled =dma_fence_get (&s_fence->finished); -if (fence) { s_fence->parent =dma_fence_get (fence); r = dma_fence_add_callback(fence, &s_fence->cb,
Signature · 6 lines
2.7.4 _______________________________________________ amd-gfx mailing list [email protected] https://lists.freedesktop.org/mailman/listinfo/amd-gfx
A message that is not in the archive (sent off-list or not yet received): 1524645589-16162-1-git-send-email-Pixel.Ding-5C7GfCeVMHo@public.gmane.org
Hi Monk,
Please review it. Thanks.
—
Sincerely Yours,
Pixel
On 2018/4/25, 4:39 PM, "Pixel Ding" <[email protected]> wrote:
The current sequence in scheduler thread is:
1. update last sched fence
2. job begin (adding to mirror list)
3. job finish (remove from mirror list)
4. back to 1
Since we update last sched prior to joining mirror list, the jobs
in mirror list already pass the last sched fence. TDR just run
the jobs in mirror list, so we should not update the last sched
fences in TDR.
Signed-off-by: Pixel Ding <[email protected]>
---
drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 ---
1 file changed, 3 deletions(-)
diff --git a/drivers/gpu/drm/scheduler/gpu_scheduler.c b/drivers/gpu/drm/scheduler/gpu_scheduler.c
index 088ff2b..1f1dd70 100644
--- a/drivers/gpu/drm/scheduler/gpu_scheduler.c
+++ b/drivers/gpu/drm/scheduler/gpu_scheduler.c
@@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched)
fence = sched->ops->run_job(s_job);
atomic_inc(&sched->hw_rq_count);
- dma_fence_put(s_job->entity->last_scheduled);
- s_job->entity->last_scheduled = dma_fence_get(&s_fence->finished);
-
if (fence) {
s_fence->parent = dma_fence_get(fence);
r = dma_fence_add_callback(fence, &s_fence->cb,
--
2.7.4_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
A message that is not in the archive (sent off-list or not yet received): 6A08CC55-19DC-46E1-9741-24CE89C49763-5C7GfCeVMHo@public.gmane.org
NAK on it.
First of all, without this patch, Does it cause any issue?
second,
entity->last_scheduled present the last submiting job.
Your this change will break this meaning and don't work, e.g.
1. mirror list has jobA and jobB, assuming they are belonged to same entity, then the entity->last_scheduled is jobB->finished.
2. when you do recovery, re-submit jobA first, if don't update last_scheduled, then entity->last_scheduled still is jobB->finished.
3. killed this process, will call to drm_sched_entity_cleanup, will register drm_sched_entity_kill_jobs_cb to jobB->finished, but jobB isn't submitted at all.
So the change isn't necessary at all.
Regards,
David Zhou
Quoted 46 lines · Pixel
Hi Monk,
Please review it. Thanks.
—
Sincerely Yours,
PixelOn 2018/4/25, 4:39 PM, "Pixel Ding" <[email protected]> wrote:
The current sequence in scheduler thread is: 1. update last sched fence 2. job begin (adding to mirror list) 3. job finish (remove from mirror list) 4. back to 1 Since we update last sched prior to joining mirror list, the jobs in mirror list already pass the last sched fence. TDR just run the jobs in mirror list, so we should not update the last sched fences in TDR. Signed-off-by: Pixel Ding <[email protected]> --- drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 --- 1 file changed, 3 deletions(-) diff --git a/drivers/gpu/drm/scheduler/gpu_scheduler.c b/drivers/gpu/drm/scheduler/gpu_scheduler.c index 088ff2b..1f1dd70 100644 --- a/drivers/gpu/drm/scheduler/gpu_scheduler.c +++ b/drivers/gpu/drm/scheduler/gpu_scheduler.c @@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched) fence = sched->ops->run_job(s_job); atomic_inc(&sched->hw_rq_count); - dma_fence_put(s_job->entity->last_scheduled); - s_job->entity->last_scheduled = dma_fence_get(&s_fence->finished); - if (fence) { s_fence->parent = dma_fence_get(fence); r = dma_fence_add_callback(fence, &s_fence->cb, -- 2.7.4
Quoted 4 lines
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
A message that is not in the archive (sent off-list or not yet received): 2c43a4bf-dc5a-69e2-1d9f-02a4019d9d27-5C7GfCeVMHo@public.gmane.org
That change is indeed fixing a problem. When drm_sched_job_recovery() is called s_job->entity should already be NULL.
And even when the process is killed we should still either re-submit the jobs or set the error.
BTW: There is another bug in that function: guilty_context needs to be kept alive over the course of a loop.
Going to submit a patch for that.
Regards,
Christian.
Am 26.04.2018 um 06:23 schrieb zhoucm1:
Quoted 71 lines
NAK on it.
First of all, without this patch, Does it cause any issue?
second,
entity->last_scheduledpresent the last submiting job.Your this change will break this meaning and don't work, e.g.
1. mirror list has jobA and jobB, assuming they are belonged to same entity, then the
entity->last_scheduledisjobB->finished.2. when you do recovery, re-submit jobA first, if don't update
last_scheduled, thenentity->last_scheduledstill isjobB->finished.3. killed this process, will call to
drm_sched_entity_cleanup, will registerdrm_sched_entity_kill_jobs_cbtojobB->finished, but jobB isn't submitted at all.So the change isn't necessary at all.
Regards,
David Zhou
Quoted 40 lines · Pixel
Hi Monk,
Please review it. Thanks.
—
Sincerely Yours,
PixelOn 2018/4/25, 4:39 PM, "Pixel Ding" <[email protected]> wrote:
The current sequence in scheduler thread is:
1. update last sched fence
2. job begin (adding to mirror list)
3. job finish (remove from mirror list)
4. back to 1
Since we update last sched prior to joining mirror list, the jobs in mirror list already pass the last sched fence. TDR just run the jobs in mirror list, so we should not update the last sched fences in TDR.Signed-off-by Pixel Ding <[email protected]>---
drivers/gpu/drm/scheduler/gpu_scheduler.c| 3 ---1 file changed, 3 deletions(-)diff --git
a/drivers/gpu/drm/scheduler/gpu_scheduler.cb/drivers/gpu/drm/scheduler/gpu_scheduler.cindex 088ff2b..1f1dd70 100644
---a/drivers/gpu/drm/scheduler/gpu_scheduler.c
+++b/drivers/gpu/drm/scheduler/gpu_scheduler.c
@@ -575,9 +575,6 @@ voiddrm_sched_job_recovery(struct drm_gpu_scheduler *sched)fence =sched->ops->run_job(s_job);
atomic_inc(&sched->hw_rq_count);
-dma_fence_put(s_job->entity->last_scheduled);
-s_job->entity->last_scheduled=dma_fence_get(&s_fence->finished);
-
if (fence) {
s_fence->parent=dma_fence_get(fence);
r = dma_fence_add_callback(fence,&s_fence->cb,
--
2.7.4Quoted 4 lines
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
Quoted 4 lines
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
3. killed this process, will call to drm_sched_entity_cleanup, will register drm_sched_entity_kill_jobs_cb to jobB->finished, but jobB isn't submitted at all.
I think that point is your misunderstanding. Killing process won’t stop jobB to be submitted.
—
Sincerely Yours,
Pixel
On 2018/4/26, 12:23 PM, "amd-gfx on behalf of zhoucm1" <[email protected] on behalf of [email protected]> wrote:
NAK on it.
First of all, without this patch, Does it cause any issue?
second,
entity->last_scheduled present the last submiting job.
Your this change will break this meaning and don't work, e.g.
1. mirror list has jobA and jobB, assuming they are belonged to same
entity, then the entity->last_scheduled is jobB->finished.
2. when you do recovery, re-submit jobA first, if don't update
last_scheduled, then entity->last_scheduled still is jobB->finished.
3. killed this process, will call to drm_sched_entity_cleanup, will
register drm_sched_entity_kill_jobs_cb to jobB->finished, but jobB isn't
submitted at all.
So the change isn't necessary at all.
Regards,
David Zhou
On 2018年04月26日 11:47, Ding, Pixel wrote:
> Hi Monk,
>
> Please review it. Thanks.
>
> —
> Sincerely Yours,
> Pixel
>
>
> On 2018/4/25, 4:39 PM, "Pixel Ding" <[email protected]> wrote:
>
> The current sequence in scheduler thread is:
> 1. update last sched fence
> 2. job begin (adding to mirror list)
> 3. job finish (remove from mirror list)
> 4. back to 1
>
> Since we update last sched prior to joining mirror list, the jobs
> in mirror list already pass the last sched fence. TDR just run
> the jobs in mirror list, so we should not update the last sched
> fences in TDR.
>
> Signed-off-by: Pixel Ding <[email protected]>
> ---
> drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 ---
> 1 file changed, 3 deletions(-)
>
> diff --git a/drivers/gpu/drm/scheduler/gpu_scheduler.c b/drivers/gpu/drm/scheduler/gpu_scheduler.c
> index 088ff2b..1f1dd70 100644
> --- a/drivers/gpu/drm/scheduler/gpu_scheduler.c
> +++ b/drivers/gpu/drm/scheduler/gpu_scheduler.c
> @@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched)
> fence = sched->ops->run_job(s_job);
> atomic_inc(&sched->hw_rq_count);
>
> - dma_fence_put(s_job->entity->last_scheduled);
> - s_job->entity->last_scheduled = dma_fence_get(&s_fence->finished);
> -
> if (fence) {
> s_fence->parent = dma_fence_get(fence);
> r = dma_fence_add_callback(fence, &s_fence->cb,
> --
> 2.7.4
>
>
>
> _______________________________________________
> amd-gfx mailing list
> [email protected]
> https://lists.freedesktop.org/mailman/listinfo/amd-gfx
_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx_______________________________________________
amd-gfx mailing list
[email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
Liu, Monk
Reviewed-by Monk Liu-----Original Message-----
From: amd-gfx [mailto:[email protected]] On Behalf Of Pixel Ding
Sent: 2018年4月25日 16:40
To: [email protected]
Cc: Ding, Pixel <[email protected]>
Subject: [PATCH] drm/scheduler: don't update last scheduled fence in TDR
The current sequence in scheduler thread is:
1. update last sched fence
2. job begin (adding to mirror list)
3. job finish (remove from mirror list)
4. back to 1
Since we update last sched prior to joining mirror list, the jobs in mirror list already pass the last sched fence. TDR just run the jobs in mirror list, so we should not update the last sched fences in TDR.
--- drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 --- 1 file changed, 3 deletions(-)
drivers/gpu/drm/scheduler/gpu_scheduler.c +0 -3
@@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched) fence = sched->ops->run_job (s_job);atomic_inc (&sched->hw_rq_count); -dma_fence_put (s_job->entity->last_scheduled); - s_job->entity->last_scheduled =dma_fence_get (&s_fence->finished); -if (fence) { s_fence->parent =dma_fence_get (fence); r = dma_fence_add_callback(fence, &s_fence->cb,
--
2.7.4
_______________________________________________
amd-gfx mailing list [email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx
_______________________________________________
amd-gfx mailing list [email protected]
https://lists.freedesktop.org/mailman/listinfo/amd-gfx