cip-dev progress report weeks 39-40
Hi! Reporting on the Codethink CIP testing development over the past 2 weeks.
CIP kernel testing
- A provisioned box with the latest master is in preparation and should be available early next week.
Renesas Board
- The iwg20m board now works reliably with board at desk an MR having been made and accepted - thanks to Nguyen for assistance with this.
Health Checks
- Regular health checks are now performed with the iwg20m board as well as the beaglebone.
Robert
Signature · 3 lines
Robert Marshall, Software Developer Codethink Ltd Telephone: +44 7762 840 414 3rd Floor, Dale House, 35 Dale Street https://www.codethink.co.uk/ MANCHESTER, M1 2HF. United Kingdom