gitlab-ci/cirrus: Increase timeout to 80 minutes
PATCH 1/1 gitlab-ci/cirrus: Increase timeout to 80 minutes
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
--- .gitlab-ci.d/cirrus.yml | 1 + 1 file changed, 1 insertion(+)
.gitlab-ci.d/cirrus.yml +1 -0
@@ -14,6 +14,7 @@ stage: build image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master needs: [] + timeout: 80m allow_failure: true script: - source .gitlab-ci.d/cirrus/$NAME.vars
Signature · 1 line
2.27.0
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
On a successful pipeline I see
freebsd-11 - 28 minutes freebsd-12 - 57 minutes macos - 30 minutes
We know cirrus allows 2 concurrent jobs, so from that I infer that the freebsd-12 job was queued for ~30 minutes waiting for either the freebsd-11 or macos job to finish, and then it ran in 30 minutes, giving the ~60 minute total.
That's too close to the 60 minute gitlab default job timeout for comfort - it can easily slip over 60 minutes by just a small amount.
80 minutes will certainly help in the case where we randomly take a little longer than 30 minutes to build, and have 1 of the 3 jobs queued.
When we're running jobs on both master + staging, we can have 2 jobs running and 4 more queued - 2 of those queued might just finish in time, but 2 will definitely fail. My patch will cut these extra jobs on master, so in common case we only ever get 1 queued, which should work well in combo with your patch here. That should be good enough for the qemu-project namespace, unless someone is triggering pipelines for stable branch staging at the same time as the master branch staging.
If we do want to worry about more than 2 queued jobs again for that reason, we might consider putting it upto 100 minutes. That would give us enough slack to have 4 queued jobs behind two running jobs and have them all succeed
Quoted 10 lines
Signed-off-by Thomas Huth <[email protected]>--- .gitlab-ci.d/cirrus.yml | 1 + 1 file changed, 1 insertion(+).gitlab-ci.d/cirrus.yml +0
-0
.gitlab-ci.d/cirrus.yml line 20
Quoted 7 lines
.gitlab-ci.d/cirrus.yml +1
-0@@ -14,6 +14,7 @@ stage: build image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master needs: [] + timeout: 80m allow_failure: true script: - source .gitlab-ci.d/cirrus/$NAME.vars
Whether 80 or 100 minute, consider it
Regards,
Daniel
Signature · 3 lines
|: https://berrange.com -o- https://www.flickr.com/photos/dberrange :| |: https://libvirt.org -o- https://fstop138.berrange.com :| |: https://entangle-photo.org -o- https://www.instagram.com/dberrange :|
Philippe Mathieu-Daudé
Reviewed-byQuoted 62 lines · Daniel P. Berrangé
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
On a successful pipeline I see
freebsd-11 - 28 minutes freebsd-12 - 57 minutes macos - 30 minutesWe know cirrus allows 2 concurrent jobs, so from that I infer that the freebsd-12 job was queued for ~30 minutes waiting for either the freebsd-11 or macos job to finish, and then it ran in 30 minutes, giving the ~60 minute total.
That's too close to the 60 minute gitlab default job timeout for comfort - it can easily slip over 60 minutes by just a small amount.
80 minutes will certainly help in the case where we randomly take a little longer than 30 minutes to build, and have 1 of the 3 jobs queued.
When we're running jobs on both master + staging, we can have 2 jobs running and 4 more queued - 2 of those queued might just finish in time, but 2 will definitely fail. My patch will cut these extra jobs on master, so in common case we only ever get 1 queued, which should work well in combo with your patch here. That should be good enough for the qemu-project namespace, unless someone is triggering pipelines for stable branch staging at the same time as the master branch staging.
If we do want to worry about more than 2 queued jobs again for that reason, we might consider putting it upto 100 minutes. That would give us enough slack to have 4 queued jobs behind two running jobs and have them all succeed
Quoted 10 lines
Signed-off-by Thomas Huth <[email protected]>--- .gitlab-ci.d/cirrus.yml | 1 + 1 file changed, 1 insertion(+).gitlab-ci.d/cirrus.yml +0
-0.gitlab-ci.d/cirrus.yml line 20
Quoted 7 lines
.gitlab-ci.d/cirrus.yml +1
-0@@ -14,6 +14,7 @@ stage: build image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master needs: [] + timeout: 80m allow_failure: true script: - source .gitlab-ci.d/cirrus/$NAME.varsWhether 80 or 100 minute, consider it
Quoted 1 line
Reviewed-by Daniel P. Berrangé <[email protected]>
This pipeline took 1h51m09s:
https://gitlab.com/qemu-project/qemu/-/pipelines/409666733/builds
But Richard restarted unstable jobs, which probably added time to the total.
IIRC from a maintainer perspective 1h15 is the upper limit. 80m fits, 100m is over. Up to the project maintainers (personally I don't have any objection, in particular if this reduces the failures rate).
Quoted 7 lines · Philippe Mathieu-Daudé
Quoted 6 lines · Daniel P. Berrangé
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
...>>> diff --git a/.gitlab-ci.d/cirrus.yml b/.gitlab-ci.d/cirrus.yml
Quoted 16 lines
Quoted 14 lines
.gitlab-ci.d/cirrus.yml line 20
Quoted 11 lines
index
e7b25e7427..22d42585e4100644.gitlab-ci.d/cirrus.yml +1
-0@@ -14,6 +14,7 @@ stage: build image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master needs: [] + timeout: 80m allow_failure: true script: - source .gitlab-ci.d/cirrus/$NAME.varsWhether 80 or 100 minute, consider it
Quoted 1 line
Reviewed-by Daniel P. Berrangé <[email protected]>
Quoted 7 lines
This pipeline took 1h51m09s:
https://gitlab.com/qemu-project/qemu/-/pipelines/409666733/builds
But Richard restarted unstable jobs, which probably added time to the total.IIRC from a maintainer perspective 1h15 is the upper limit. 80m fits, 100m is over.
I think I agree ... I normally don't want to wait more than a little bit more than one hour, so 100 minutes feels too long already. We already have some 70m timeouts in other jobs, and one 80 minute timeout in .gitlab-ci.d/crossbuild-template.yml, so I'd say 80 minutes are really the upper boundary that we should use.
Quoted 1 line
Reviewed-by Philippe Mathieu-Daudé <[email protected]>
Thank to all for your reviews!
Thomas
Quoted 30 lines · Thomas Huth
Quoted 7 lines · Philippe Mathieu-Daudé
Quoted 6 lines · Daniel P. Berrangé
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
...>>> diff --git
a/.gitlab-ci.d/cirrus.ymlb/.gitlab-ci.d/cirrus.ymlQuoted 21 lines
Quoted 14 lines
Quoted 11 lines
index
e7b25e7427..22d42585e4100644.gitlab-ci.d/cirrus.yml +0
-0@@ -14,6 +14,7 @@stage: build
image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master
needs: []
+ timeout: 80m
allow_failure: true
script:
- source .gitlab-ci.d/cirrus/$NAME.varsWhether 80 or 100 minute, consider it
Quoted 1 line
Reviewed-by Daniel P. Berrangé <[email protected]>This pipeline took 1h51m09s:
https://gitlab.com/qemu-project/qemu/-/pipelines/409666733/builds
But Richard restarted unstable jobs, which probably added time to the total.
Quoted 4 lines
Quoted 2 lines
IIRC from a maintainer perspective 1h15 is the upper limit. 80m fits, 100m is over.
I think I agree ... I normally don't want to wait more than a little bit more than one hour, so 100 minutes feels too long already. We already have some 70m timeouts in other jobs, and one 80 minute timeout in
.gitlab-ci.d/crossbuild-template.yml, so I'd say 80 minutes are really the upper boundary that we should use.
We are also talking apples and oranges:
Gitlab timeouts are on the amount of time the job runs. Cirrus timeouts appear to be on the amount of time the job is queued.
If cirrus would just not start accounting until the thing runs we'd be fine.
r~
Quoted 40 lines · Richard Henderson
Quoted 30 lines · Thomas Huth
Quoted 7 lines · Philippe Mathieu-Daudé
Quoted 6 lines · Daniel P. Berrangé
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
...>>> diff --git
a/.gitlab-ci.d/cirrus.ymlb/.gitlab-ci.d/cirrus.ymlQuoted 21 lines
Quoted 14 lines
Quoted 11 lines
index
e7b25e7427..22d42585e4100644.gitlab-ci.d/cirrus.yml +0
-0@@ -14,6 +14,7 @@stage: build
image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master
needs: []
+ timeout: 80m
allow_failure: true
script:
- source .gitlab-ci.d/cirrus/$NAME.varsWhether 80 or 100 minute, consider it
Quoted 1 line
Reviewed-by Daniel P. Berrangé <[email protected]>This pipeline took 1h51m09s:
https://gitlab.com/qemu-project/qemu/-/pipelines/409666733/builds
But Richard restarted unstable jobs, which probably added time to the total.Quoted 8 lines
Quoted 2 lines
IIRC from a maintainer perspective 1h15 is the upper limit. 80m fits, 100m is over.
I think I agree ... I normally don't want to wait more than a little bit more than one hour, so 100 minutes feels too long already. We already have some 70m timeouts in other jobs, and one 80 minute timeout in
.gitlab-ci.d/crossbuild-template.yml, so I'd say 80 minutes are really the upper boundary that we should use.
Quoted 5 lines
We are also talking apples and oranges:
Gitlab timeouts are on the amount of time the job runs. Cirrus timeouts appear to be on the amount of time the job is queued.If cirrus would just not start accounting until the thing runs we'd be fine.
Unfortunately it isn't that easy. Our cirrus CI jobs are launched using the cirrus-run tool, from a gitlab job. The timeouts we're usually hitting are from the gitlab job which is sitting around waiting for the cirrus job it launched to finish, so it can report back stats.
Cirrus CI does itself have a job timeout, but I'm not aware of us hitting that typically, unless i'm misinterpreting something.
Regards,
Daniel
Signature · 3 lines
|: https://berrange.com -o- https://www.flickr.com/photos/dberrange :| |: https://libvirt.org -o- https://fstop138.berrange.com :| |: https://entangle-photo.org -o- https://www.instagram.com/dberrange :|
Quoted 47 lines · Daniel P. Berrangé
Quoted 40 lines · Richard Henderson
Quoted 30 lines · Thomas Huth
Quoted 7 lines · Philippe Mathieu-Daudé
Quoted 6 lines · Daniel P. Berrangé
Quoted 5 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
...>>> diff --git
a/.gitlab-ci.d/cirrus.ymlb/.gitlab-ci.d/cirrus.ymlQuoted 21 lines
Quoted 14 lines
.gitlab-ci.d/cirrus.yml line 20
Quoted 11 lines
index
e7b25e7427..22d42585e4100644.gitlab-ci.d/cirrus.yml +1
-0@@ -14,6 +14,7 @@ stage: build image: registry.gitlab.com/libvirt/libvirt-ci/cirrus-run:master needs: [] + timeout: 80m allow_failure: true script: - source .gitlab-ci.d/cirrus/$NAME.varsWhether 80 or 100 minute, consider it
Quoted 1 line
Reviewed-by Daniel P. Berrangé <[email protected]>This pipeline took 1h51m09s:
https://gitlab.com/qemu-project/qemu/-/pipelines/409666733/builds
But Richard restarted unstable jobs, which probably added time to the total.Quoted 8 lines
Quoted 2 lines
IIRC from a maintainer perspective 1h15 is the upper limit. 80m fits, 100m is over.
I think I agree ... I normally don't want to wait more than a little bit more than one hour, so 100 minutes feels too long already. We already have some 70m timeouts in other jobs, and one 80 minute timeout in
.gitlab-ci.d/crossbuild-template.yml, so I'd say 80 minutes are really the upper boundary that we should use.Quoted 5 lines
We are also talking apples and oranges:
Gitlab timeouts are on the amount of time the job runs. Cirrus timeouts appear to be on the amount of time the job is queued.If cirrus would just not start accounting until the thing runs we'd be fine.
Quoted 7 lines
Unfortunately it isn't that easy. Our cirrus CI jobs are launched using the cirrus-run tool, from a gitlab job. The timeouts we're usually hitting are from the gitlab job which is sitting around waiting for the cirrus job it launched to finish, so it can report back stats.
Cirrus CI does itself have a job timeout, but I'm not aware of us hitting that typically, unless i'm misinterpreting something.
Right, the problem is the timeout on the gitlab-CI side, not the timeout on the Cirrus-CI side. I've never seen us hitting the timeout on the Cirrus side either.
Thomas
Quoted 7 lines · Thomas Huth
The jobs on Cirrus-CI sometimes get delayed quite a bit, waiting to be scheduled, so while the build test itself finishes within 60 minutes, the total run time of the jobs can be longer due to this waiting time. Thus let's increase the timeout on the gitlab side a little bit, so that these jobs are not marked as failing just because of the delay.
Quoted 5 lines
Signed-off-by Thomas Huth <[email protected]>--- .gitlab-ci.d/cirrus.yml | 1 + 1 file changed, 1 insertion(+)