Skip to contentSkip to conversation

Fix sched-rt sysctl files & update docs

PATCH Applied Cyril Hrubis 3 participants 8 messages Oct 2, 2023

Subsystems (2)
lore
Share & tools
lore
#0 lore raw

v3 cover Fix sched-rt sysctl files & update docs

New in v3:
- Spelling fixes as requested by Ingo
- added third patch that replaces all cases of realtime with real-time in the docs

Cyril Hrubis (3):
sched/rt: Disallow writing invalid values to sched_rt_period_us
docs: scheduler-rt: Clarify & fix sched_rt_* sysctl docs
docs: scheduler-rt: Use real-time instead of realtime

 Documentation/scheduler/sched-rt-group.rst | 40 ++++++++++++----------
 kernel/sched/rt.c                          |  9 ++---
 2 files changed, 26 insertions(+), 23 deletions(-)
Signature · 1 line
2.41.0
#1 lore raw

PATCH v3 1/3 sched/rt: Disallow writing invalid values to sched_rt_period_us

The validation of the value written to sched_rt_period_us was broken because:

- the sysclt_sched_rt_period is declared as unsigned int
- parsed by proc_do_intvec()
- the range is asserted after the value parsed by proc_do_intvec()

Because of this negative values written to the file were written into a unsigned integer that were later on interpreted as large positive integers which did passed the check:

if (sysclt_sched_rt_period <= 0)

	return EINVAL;

This commit fixes the parsing by setting explicit range for both perid_us and runtime_us into the sched_rt_sysctls table and processes the values with proc_dointvec_minmax() instead.

Alternatively if we wanted to use full range of unsigned int for the period value we would have to split the proc_handler and use proc_douintvec() for it however even the Documentation/scheduller/sched-rt-group.rst describes the range as 1 to INT_MAX.

As far as I can tell the only problem this causes is that the sysctl file allows writing negative values which when read back may confuse userspace.

There is also a LTP test being submitted for these sysctl files at:

http://patchwork.ozlabs.org/project/ltp/patch/[email protected]/

---
 kernel/sched/rt.c | 9 +++++----
 1 file changed, 5 insertions(+), 4 deletions(-)
kernel/sched/rt.c +5 -4
index 0597ba0f85ff..aed3d55de2dd 100644
@@ -37,6 +37,8 @@ static struct ctl_table sched_rt_sysctls[] = {
 		.maxlen         = sizeof(unsigned int),
 		.mode           = 0644,
 		.proc_handler   = sched_rt_handler,
+		.extra1         = SYSCTL_ONE,
+		.extra2         = SYSCTL_INT_MAX,
 	},
 	{
 		.procname       = "sched_rt_runtime_us",
@@ -44,6 +46,8 @@ static struct ctl_table sched_rt_sysctls[] = {
 		.maxlen         = sizeof(int),
 		.mode           = 0644,
 		.proc_handler   = sched_rt_handler,
+		.extra1         = SYSCTL_NEG_ONE,
+		.extra2         = SYSCTL_INT_MAX,
 	},
 	{
 		.procname       = "sched_rr_timeslice_ms",
@@ -2985,9 +2989,6 @@ static int sched_rt_global_constraints(void)
 #ifdef CONFIG_SYSCTL
 static int sched_rt_global_validate(void)
 {
-	if (sysctl_sched_rt_period <= 0)
-		return -EINVAL;
-
 	if ((sysctl_sched_rt_runtime != RUNTIME_INF) &&
 		((sysctl_sched_rt_runtime > sysctl_sched_rt_period) ||
 		 ((u64)sysctl_sched_rt_runtime *
@@ -3018,7 +3019,7 @@ static int sched_rt_handler(struct ctl_table *table, int write, void *buffer,
 	old_period = sysctl_sched_rt_period;
 	old_runtime = sysctl_sched_rt_runtime;
 
-	ret = proc_dointvec(table, write, buffer, lenp, ppos);
+	ret = proc_dointvec_minmax(table, write, buffer, lenp, ppos);
 
 	if (!ret && write) {
 		ret = sched_rt_global_validate();
Signature · 1 line
2.41.0
merge bot Applied
#2 lore raw

[tip: sched/core] sched/rt: Disallow writing invalid values to sched_rt_period_us

The following commit has been merged into the sched/core branch of tip:

The following commit has been merged into the sched/core branch of tip:

Commit-ID:     079be8fc630943d9fc70a97807feb73d169ee3fc
Gitweb:        https://git.kernel.org/tip/079be8fc630943d9fc70a97807feb73d169ee3fc
Author:        Cyril Hrubis <[email protected]>
AuthorDate:    Mon, 02 Oct 2023 13:55:51 +02:00
Committer:     Ingo Molnar <[email protected]>
CommitterDate: Mon, 02 Oct 2023 15:15:56 +02:00

sched/rt: Disallow writing invalid values to sched_rt_period_us

The validation of the value written to sched_rt_period_us was broken because:

- the sysclt_sched_rt_period is declared as unsigned int
- parsed by proc_do_intvec()
- the range is asserted after the value parsed by proc_do_intvec()

Because of this negative values written to the file were written into a unsigned integer that were later on interpreted as large positive integers which did passed the check:

if (sysclt_sched_rt_period <= 0)

	return EINVAL;

This commit fixes the parsing by setting explicit range for both perid_us and runtime_us into the sched_rt_sysctls table and processes the values with proc_dointvec_minmax() instead.

Alternatively if we wanted to use full range of unsigned int for the period value we would have to split the proc_handler and use proc_douintvec() for it however even the Documentation/scheduller/sched-rt-group.rst describes the range as 1 to INT_MAX.

As far as I can tell the only problem this causes is that the sysctl file allows writing negative values which when read back may confuse userspace.

There is also a LTP test being submitted for these sysctl files at:

http://patchwork.ozlabs.org/project/ltp/patch/[email protected]/

---
 kernel/sched/rt.c |  9 +++++----
 1 file changed, 5 insertions(+), 4 deletions(-)
kernel/sched/rt.c +5 -4
index 3b627ab..88fc986 100644
@@ -37,6 +37,8 @@ static struct ctl_table sched_rt_sysctls[] = {
 		.maxlen         = sizeof(unsigned int),
 		.mode           = 0644,
 		.proc_handler   = sched_rt_handler,
+		.extra1         = SYSCTL_ONE,
+		.extra2         = SYSCTL_INT_MAX,
 	},
 	{
 		.procname       = "sched_rt_runtime_us",
@@ -44,6 +46,8 @@ static struct ctl_table sched_rt_sysctls[] = {
 		.maxlen         = sizeof(int),
 		.mode           = 0644,
 		.proc_handler   = sched_rt_handler,
+		.extra1         = SYSCTL_NEG_ONE,
+		.extra2         = SYSCTL_INT_MAX,
 	},
 	{
 		.procname       = "sched_rr_timeslice_ms",
@@ -2935,9 +2939,6 @@ static int sched_rt_global_constraints(void)
 #ifdef CONFIG_SYSCTL
 static int sched_rt_global_validate(void)
 {
-	if (sysctl_sched_rt_period <= 0)
-		return -EINVAL;
-
 	if ((sysctl_sched_rt_runtime != RUNTIME_INF) &&
 		((sysctl_sched_rt_runtime > sysctl_sched_rt_period) ||
 		 ((u64)sysctl_sched_rt_runtime *
@@ -2968,7 +2969,7 @@ static int sched_rt_handler(struct ctl_table *table, int write, void *buffer,
 	old_period = sysctl_sched_rt_period;
 	old_runtime = sysctl_sched_rt_runtime;
 
-	ret = proc_dointvec(table, write, buffer, lenp, ppos);
+	ret = proc_dointvec_minmax(table, write, buffer, lenp, ppos);
 
 	if (!ret && write) {
 		ret = sched_rt_global_validate();
#3 lore raw

PATCH v3 2/3 docs: scheduler-rt: Clarify & fix sched_rt_* sysctl docs

In reply to Cyril Hrubis

- Describe explicitly that sched_rt_runtime_us is allocated from sched_rt_period_us and hence always less or equal to that value.

- The limit for sched_rt_runtime_us is not INT_MAX-1, but rather it's limited by the value of sched_rt_period_us. If sched_rt_period_us is INT_MAX then sched_rt_runtime_us can be set to INT_MAX as well.

---
 Documentation/scheduler/sched-rt-group.rst | 14 ++++++++------
 1 file changed, 8 insertions(+), 6 deletions(-)
Documentation/scheduler/sched-rt-group.rst +8 -6
index 655a096ec8fb..a16bee8f74c2 100644
@@ -87,18 +87,20 @@ lack an EDF scheduler to make non-uniform periods usable.
 The system wide settings are configured under the /proc virtual file system:
 
 /proc/sys/kernel/sched_rt_period_us:
-  The scheduling period that is equivalent to 100% CPU bandwidth
+  The scheduling period that is equivalent to 100% CPU bandwidth.
 
 /proc/sys/kernel/sched_rt_runtime_us:
-  A global limit on how much time realtime scheduling may use.  Even without
-  CONFIG_RT_GROUP_SCHED enabled, this will limit time reserved to realtime
-  processes. With CONFIG_RT_GROUP_SCHED it signifies the total bandwidth
-  available to all realtime groups.
+  A global limit on how much time realtime scheduling may use. This is always
+  less or equal to the period_us, as it denotes the time allocated from the
+  period_us for the realtime tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
+  this will limit time reserved to realtime processes. With
+  CONFIG_RT_GROUP_SCHED=y it signifies the total bandwidth available to all
+  realtime groups.
 
   * Time is specified in us because the interface is s32. This gives an
     operating range from 1us to about 35 minutes.
   * sched_rt_period_us takes values from 1 to INT_MAX.
-  * sched_rt_runtime_us takes values from -1 to (INT_MAX - 1).
+  * sched_rt_runtime_us takes values from -1 to sched_rt_period_us.
   * A run time of -1 specifies runtime == period, ie. no limit.
 
 
Signature · 1 line
2.41.0
merge bot Applied
#4 lore raw

[tip: sched/core] sched/rt/docs: Clarify & fix sched_rt_* sysctl docs

The following commit has been merged into the sched/core branch of tip:

The following commit has been merged into the sched/core branch of tip:

Commit-ID:     e6dbdd8fb75526b01787050087b65d12c76b3666
Gitweb:        https://git.kernel.org/tip/e6dbdd8fb75526b01787050087b65d12c76b3666
Author:        Cyril Hrubis <[email protected]>
AuthorDate:    Mon, 02 Oct 2023 13:55:52 +02:00
Committer:     Ingo Molnar <[email protected]>
CommitterDate: Mon, 02 Oct 2023 15:17:13 +02:00

sched/rt/docs: Clarify & fix sched_rt_* sysctl docs

- Describe explicitly that sched_rt_runtime_us is allocated from sched_rt_period_us and hence always less or equal to that value.

- The limit for sched_rt_runtime_us is not INT_MAX-1, but rather it's limited by the value of sched_rt_period_us. If sched_rt_period_us is INT_MAX then sched_rt_runtime_us can be set to INT_MAX as well.

---
 Documentation/scheduler/sched-rt-group.rst | 14 ++++++++------
 1 file changed, 8 insertions(+), 6 deletions(-)
Documentation/scheduler/sched-rt-group.rst +8 -6
index 655a096..a16bee8 100644
@@ -87,18 +87,20 @@ lack an EDF scheduler to make non-uniform periods usable.
 The system wide settings are configured under the /proc virtual file system:
 
 /proc/sys/kernel/sched_rt_period_us:
-  The scheduling period that is equivalent to 100% CPU bandwidth
+  The scheduling period that is equivalent to 100% CPU bandwidth.
 
 /proc/sys/kernel/sched_rt_runtime_us:
-  A global limit on how much time realtime scheduling may use.  Even without
-  CONFIG_RT_GROUP_SCHED enabled, this will limit time reserved to realtime
-  processes. With CONFIG_RT_GROUP_SCHED it signifies the total bandwidth
-  available to all realtime groups.
+  A global limit on how much time realtime scheduling may use. This is always
+  less or equal to the period_us, as it denotes the time allocated from the
+  period_us for the realtime tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
+  this will limit time reserved to realtime processes. With
+  CONFIG_RT_GROUP_SCHED=y it signifies the total bandwidth available to all
+  realtime groups.
 
   * Time is specified in us because the interface is s32. This gives an
     operating range from 1us to about 35 minutes.
   * sched_rt_period_us takes values from 1 to INT_MAX.
-  * sched_rt_runtime_us takes values from -1 to (INT_MAX - 1).
+  * sched_rt_runtime_us takes values from -1 to sched_rt_period_us.
   * A run time of -1 specifies runtime == period, ie. no limit.
 
 
#5 lore raw

PATCH v3 3/3 docs: scheduler-rt: Use real-time instead of realtime

In reply to Cyril Hrubis
---
 Documentation/scheduler/sched-rt-group.rst | 34 +++++++++++-----------
 1 file changed, 17 insertions(+), 17 deletions(-)
Documentation/scheduler/sched-rt-group.rst +17 -17
index a16bee8f74c2..d685609ed3d7 100644
@@ -39,10 +39,10 @@ Most notable:
 1.1 The problem
 ---------------
 
-Realtime scheduling is all about determinism, a group has to be able to rely on
+Real-time scheduling is all about determinism, a group has to be able to rely on
 the amount of bandwidth (eg. CPU time) being constant. In order to schedule
-multiple groups of realtime tasks, each group must be assigned a fixed portion
-of the CPU time available.  Without a minimum guarantee a realtime group can
+multiple groups of real-time tasks, each group must be assigned a fixed portion
+of the CPU time available.  Without a minimum guarantee a real-time group can
 obviously fall short. A fuzzy upper limit is of no use since it cannot be
 relied upon. Which leaves us with just the single fixed portion.
 
@@ -50,14 +50,14 @@ relied upon. Which leaves us with just the single fixed portion.
 ----------------
 
 CPU time is divided by means of specifying how much time can be spent running
-in a given period. We allocate this "run time" for each realtime group which
-the other realtime groups will not be permitted to use.
+in a given period. We allocate this "run time" for each real-time group which
+the other real-time groups will not be permitted to use.
 
-Any time not allocated to a realtime group will be used to run normal priority
+Any time not allocated to a real-time group will be used to run normal priority
 tasks (SCHED_OTHER). Any allocated run time not used will also be picked up by
 SCHED_OTHER.
 
-Let's consider an example: a frame fixed realtime renderer must deliver 25
+Let's consider an example: a frame fixed real-time renderer must deliver 25
 frames a second, which yields a period of 0.04s per frame. Now say it will also
 have to play some music and respond to input, leaving it with around 80% CPU
 time dedicated for the graphics. We can then give this group a run time of 0.8
@@ -70,7 +70,7 @@ needs only about 3% CPU time to do so, it can do with a 0.03 * 0.005s =
 of 0.00015s.
 
 The remaining CPU time will be used for user input and other tasks. Because
-realtime tasks have explicitly allocated the CPU time they need to perform
+real-time tasks have explicitly allocated the CPU time they need to perform
 their tasks, buffer underruns in the graphics or audio can be eliminated.
 
 NOTE: the above example is not fully implemented yet. We still
@@ -90,12 +90,12 @@ The system wide settings are configured under the /proc virtual file system:
   The scheduling period that is equivalent to 100% CPU bandwidth.
 
 /proc/sys/kernel/sched_rt_runtime_us:
-  A global limit on how much time realtime scheduling may use. This is always
+  A global limit on how much time real-time scheduling may use. This is always
   less or equal to the period_us, as it denotes the time allocated from the
-  period_us for the realtime tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
-  this will limit time reserved to realtime processes. With
+  period_us for the real-time tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
+  this will limit time reserved to real-time processes. With
   CONFIG_RT_GROUP_SCHED=y it signifies the total bandwidth available to all
-  realtime groups.
+  real-time groups.
 
   * Time is specified in us because the interface is s32. This gives an
     operating range from 1us to about 35 minutes.
@@ -110,7 +110,7 @@ The system wide settings are configured under the /proc virtual file system:
 The default values for sched_rt_period_us (1000000 or 1s) and
 sched_rt_runtime_us (950000 or 0.95s).  This gives 0.05s to be used by
 SCHED_OTHER (non-RT tasks). These defaults were chosen so that a run-away
-realtime tasks will not lock up the machine but leave a little time to recover
+real-time tasks will not lock up the machine but leave a little time to recover
 it.  By setting runtime to -1 you'd get the old behaviour back.
 
 By default all bandwidth is assigned to the root group and new groups get the
@@ -118,10 +118,10 @@ period from /proc/sys/kernel/sched_rt_period_us and a run time of 0. If you
 want to assign bandwidth to another group, reduce the root group's bandwidth
 and assign some or all of the difference to another group.
 
-Realtime group scheduling means you have to assign a portion of total CPU
-bandwidth to the group before it will accept realtime tasks. Therefore you will
-not be able to run realtime tasks as any user other than root until you have
-done that, even if the user has the rights to run processes with realtime
+Real-time group scheduling means you have to assign a portion of total CPU
+bandwidth to the group before it will accept real-time tasks. Therefore you will
+not be able to run real-time tasks as any user other than root until you have
+done that, even if the user has the rights to run processes with real-time
 priority!
 
 
Signature · 1 line
2.41.0
merge bot Applied
#6 lore raw

[tip: sched/core] sched/rt/docs: Use 'real-time' instead of 'realtime'

The following commit has been merged into the sched/core branch of tip:

The following commit has been merged into the sched/core branch of tip:

Commit-ID:     83494dc51033506eb60c5e11a335461b2dc42111
Gitweb:        https://git.kernel.org/tip/83494dc51033506eb60c5e11a335461b2dc42111
Author:        Cyril Hrubis <[email protected]>
AuthorDate:    Mon, 02 Oct 2023 13:55:53 +02:00
Committer:     Ingo Molnar <[email protected]>
CommitterDate: Mon, 02 Oct 2023 15:17:14 +02:00

sched/rt/docs: Use 'real-time' instead of 'realtime'

Standardize on a single variant.

---
 Documentation/scheduler/sched-rt-group.rst | 34 ++++++++++-----------
 1 file changed, 17 insertions(+), 17 deletions(-)
Documentation/scheduler/sched-rt-group.rst +17 -17
index a16bee8..d685609 100644
@@ -39,10 +39,10 @@ Most notable:
 1.1 The problem
 ---------------
 
-Realtime scheduling is all about determinism, a group has to be able to rely on
+Real-time scheduling is all about determinism, a group has to be able to rely on
 the amount of bandwidth (eg. CPU time) being constant. In order to schedule
-multiple groups of realtime tasks, each group must be assigned a fixed portion
-of the CPU time available.  Without a minimum guarantee a realtime group can
+multiple groups of real-time tasks, each group must be assigned a fixed portion
+of the CPU time available.  Without a minimum guarantee a real-time group can
 obviously fall short. A fuzzy upper limit is of no use since it cannot be
 relied upon. Which leaves us with just the single fixed portion.
 
@@ -50,14 +50,14 @@ relied upon. Which leaves us with just the single fixed portion.
 ----------------
 
 CPU time is divided by means of specifying how much time can be spent running
-in a given period. We allocate this "run time" for each realtime group which
-the other realtime groups will not be permitted to use.
+in a given period. We allocate this "run time" for each real-time group which
+the other real-time groups will not be permitted to use.
 
-Any time not allocated to a realtime group will be used to run normal priority
+Any time not allocated to a real-time group will be used to run normal priority
 tasks (SCHED_OTHER). Any allocated run time not used will also be picked up by
 SCHED_OTHER.
 
-Let's consider an example: a frame fixed realtime renderer must deliver 25
+Let's consider an example: a frame fixed real-time renderer must deliver 25
 frames a second, which yields a period of 0.04s per frame. Now say it will also
 have to play some music and respond to input, leaving it with around 80% CPU
 time dedicated for the graphics. We can then give this group a run time of 0.8
@@ -70,7 +70,7 @@ needs only about 3% CPU time to do so, it can do with a 0.03 * 0.005s =
 of 0.00015s.
 
 The remaining CPU time will be used for user input and other tasks. Because
-realtime tasks have explicitly allocated the CPU time they need to perform
+real-time tasks have explicitly allocated the CPU time they need to perform
 their tasks, buffer underruns in the graphics or audio can be eliminated.
 
 NOTE: the above example is not fully implemented yet. We still
@@ -90,12 +90,12 @@ The system wide settings are configured under the /proc virtual file system:
   The scheduling period that is equivalent to 100% CPU bandwidth.
 
 /proc/sys/kernel/sched_rt_runtime_us:
-  A global limit on how much time realtime scheduling may use. This is always
+  A global limit on how much time real-time scheduling may use. This is always
   less or equal to the period_us, as it denotes the time allocated from the
-  period_us for the realtime tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
-  this will limit time reserved to realtime processes. With
+  period_us for the real-time tasks. Even without CONFIG_RT_GROUP_SCHED enabled,
+  this will limit time reserved to real-time processes. With
   CONFIG_RT_GROUP_SCHED=y it signifies the total bandwidth available to all
-  realtime groups.
+  real-time groups.
 
   * Time is specified in us because the interface is s32. This gives an
     operating range from 1us to about 35 minutes.
@@ -110,7 +110,7 @@ The system wide settings are configured under the /proc virtual file system:
 The default values for sched_rt_period_us (1000000 or 1s) and
 sched_rt_runtime_us (950000 or 0.95s).  This gives 0.05s to be used by
 SCHED_OTHER (non-RT tasks). These defaults were chosen so that a run-away
-realtime tasks will not lock up the machine but leave a little time to recover
+real-time tasks will not lock up the machine but leave a little time to recover
 it.  By setting runtime to -1 you'd get the old behaviour back.
 
 By default all bandwidth is assigned to the root group and new groups get the
@@ -118,10 +118,10 @@ period from /proc/sys/kernel/sched_rt_period_us and a run time of 0. If you
 want to assign bandwidth to another group, reduce the root group's bandwidth
 and assign some or all of the difference to another group.
 
-Realtime group scheduling means you have to assign a portion of total CPU
-bandwidth to the group before it will accept realtime tasks. Therefore you will
-not be able to run realtime tasks as any user other than root until you have
-done that, even if the user has the rights to run processes with realtime
+Real-time group scheduling means you have to assign a portion of total CPU
+bandwidth to the group before it will accept real-time tasks. Therefore you will
+not be able to run real-time tasks as any user other than root until you have
+done that, even if the user has the rights to run processes with real-time
 priority!
 
 
Applied
#7 lore raw
In reply to Cyril Hrubis
Quoted 5 lines · Cyril Hrubis

New in v3:
- Spelling fixes as requested by Ingo
- added third patch that replaces all cases of realtime with real-time in the docs

Quoted 8 lines

Cyril Hrubis (3):
sched/rt: Disallow writing invalid values to sched_rt_period_us
docs: scheduler-rt: Clarify & fix sched_rt_* sysctl docs
docs: scheduler-rt: Use real-time instead of realtime

 Documentation/scheduler/sched-rt-group.rst | 40 ++++++++++++----------
 kernel/sched/rt.c                          |  9 ++---
 2 files changed, 26 insertions(+), 23 deletions(-)

Applied to tip:sched/core for a v6.7 merge, thanks!

Ingo