Skip to contentSkip to conversation

RDMA/irdma: Bound in-flight CQP ops across deferred completions

PATCH Applied Sunny Tiwari 4 participants 4 messages Oct 17 – Oct 20

Subsystems (2)
lore
Share & tools
lore
#0 lore raw

PATCH 1/1 RDMA/irdma: Bound in-flight CQP ops across deferred completions

On IRDMA_GEN_3+ devices, CQP operations can complete in two stages:
Stage-1 on the CCQ acknowledges receipt and moves an entry from cqp->ooo_avail to cqp->ooo_pnd, while Stage-2 signals final completion via an AEQ event or a subsequent CCQ CQE.

In irdma_sc_ccq_get_cqe_info(), Stage-1 processing advances cqp->sq_ring.tail so the SQ descriptor slot can be reused once consumed by hardware, whereas cqp->completed_ops is only incremented on Stage-2. Because irdma_cqp_ring_full() only checks cqp->sq_ring, a burst of backlogged commands in dev->cqp_cmd_head allows irdma_process_bh() to submit more concurrent in-flight CQP commands than the maximum supported limit (cqp->sq_size - 1) while earlier commands await Stage-2. This causes CQP completions to be lost and synchronous waiters to time out with -ETIMEDOUT (-110).

Fix this by:
- Updating irdma_cqp_ring_full() to bound total in-flight CQP

    operations (cqp->requested_ops - cqp->completed_ops) to
    (cqp->sq_size - 1).

- Calling irdma_process_bh() at the end of irdma_process_ae_def_cmpl() so backlogged commands are drained after Stage-2 AEQ completions increment cqp->completed_ops and free in-flight capacity.

Fixes c7db0abe5f2b ("RDMA/irdma: Add GEN3 CQP support with deferred completions")
Assisted-by Gemini
---
 drivers/infiniband/hw/irdma/ctrl.c | 6 +++++-
 drivers/infiniband/hw/irdma/hw.c   | 1 +
 2 files changed, 6 insertions(+), 1 deletion(-)
drivers/infiniband/hw/irdma/ctrl.c +5 -1
index 335ae3c82e17..99fc9bf4face 100644
@@ -5331,7 +5331,11 @@ int irdma_sc_static_hmc_pages_allocated(struct irdma_sc_cqp *cqp, u64 scratch,
  */
 static bool irdma_cqp_ring_full(struct irdma_sc_cqp *cqp)
 {
-	return IRDMA_RING_FULL_ERR(cqp->sq_ring);
+	u64 in_flight = cqp->requested_ops -
+			atomic64_read(&cqp->completed_ops);
+
+	return IRDMA_RING_FULL_ERR(cqp->sq_ring) ||
+	       in_flight >= (cqp->sq_size - 1);
 }
 
 /**
drivers/infiniband/hw/irdma/hw.c +1 -0
index c345cc654256..f678ef8c1d24 100644
@@ -265,6 +265,7 @@ static void irdma_process_ae_def_cmpl(struct irdma_pci_f *rf,
 		irdma_sc_cqp_def_cmpl_ae_handler(&rf->sc_dev, info, false,
 						 &scratch, &sw_def_info);
 	}
+	irdma_process_bh(&rf->sc_dev);
 }
 
 /**
Signature · 1 line
2.56.0.176.g3575e65682-goog
#1 lore raw
Sashiko has reviewed this patch and found no issues.
Quoted 19 lines

On IRDMA_GEN_3+ devices, CQP operations can complete in two stages:
Stage-1 on the CCQ acknowledges receipt and moves an entry from cqp->ooo_avail to cqp->ooo_pnd, while Stage-2 signals final completion via an AEQ event or a subsequent CCQ CQE.

In irdma_sc_ccq_get_cqe_info(), Stage-1 processing advances cqp->sq_ring.tail so the SQ descriptor slot can be reused once consumed by hardware, whereas cqp->completed_ops is only incremented on Stage-2. Because irdma_cqp_ring_full() only checks cqp->sq_ring, a burst of backlogged commands in dev->cqp_cmd_head allows irdma_process_bh() to submit more concurrent in-flight CQP commands than the maximum supported limit (cqp->sq_size - 1) while earlier commands await Stage-2. This causes CQP completions to be lost and synchronous waiters to time out with -ETIMEDOUT (-110).

Fix this by:
- Updating irdma_cqp_ring_full() to bound total in-flight CQP

    operations (cqp->requested_ops - cqp->completed_ops) to
    (cqp->sq_size - 1).
Quoted 7 lines

- Calling irdma_process_bh() at the end of irdma_process_ae_def_cmpl() so backlogged commands are drained after Stage-2 AEQ completions increment cqp->completed_ops and free in-flight capacity.

Fixes c7db0abe5f2b ("RDMA/irdma: Add GEN3 CQP support with deferred completions")
Assisted-by Gemini

Sashiko has reviewed this patch and found no issues.

Signature · 1 line
Sashiko AI review · https://sashiko.dev/#/patchset/[email protected]?part=1
#3 lore raw
In reply to Sunny Tiwari
Quoted 15 lines · Sunny Tiwari

On IRDMA_GEN_3+ devices, CQP operations can complete in two stages:
Stage-1 on the CCQ acknowledges receipt and moves an entry from cqp->ooo_avail to cqp->ooo_pnd, while Stage-2 signals final completion via an AEQ event or a subsequent CCQ CQE.

In irdma_sc_ccq_get_cqe_info(), Stage-1 processing advances cqp->sq_ring.tail so the SQ descriptor slot can be reused once consumed by hardware, whereas cqp->completed_ops is only incremented on Stage-2. Because irdma_cqp_ring_full() only checks cqp->sq_ring, a burst of backlogged commands in dev->cqp_cmd_head allows irdma_process_bh() to submit more concurrent in-flight CQP commands than the maximum supported limit (cqp->sq_size - 1) while earlier commands await Stage-2. This causes CQP completions to be lost and synchronous waiters to time out with -ETIMEDOUT (-110).

Quoted 1 line

[...]

Applied, thanks!

[1/1] RDMA/irdma: Bound in-flight CQP ops across deferred completions

      https://git.kernel.org/rdma/rdma/c/c3e8e9451e6f1b

Best regards,

Signature · 1 line
Leon Romanovsky <[email protected]>