RFC use virtual time for CFS on s390
Get series with b4
b4 am [email protected]Versions newest first
- v1 RFC Latest2 patches 0 repliesNew
Patches in v1 No applies recorded yet
| # | Subject and files | Size | Replies | Applied |
|---|---|---|---|---|
| 1/2 | virtual sched_clock() for s390arch/ arch/ include/ | +70 | 0 replies | |
| 2/2 | base scheduler_tick() on virtual timearch/ arch/ include/ +1 more | +16 | 0 replies |
Reviews trailers per patch
No Reviewed-by, Acked-by or Tested-by trailers for v1 yet.
Cover letter [RFC PATCH 0/2] use virtual time for CFS on s390
Hi Ingo,
an outcome from the previous discussion about a virtual sched_clock() on s390 was that scheduler_tick() should also be called based on virtual time. The second patch changes the scheduler_tick() call to only happen after a tick passed for the virtual cpu.
The patches cause nothing obvious to break, numbers from top look sane but I've seen something strange...
For a simple make -j6 workload top reports processes very often to be in state <defunct>. Thats' not terribly wrong since this can happens also without the patches but I wonder if this indicates that the scheduler behaves badly and does less often schedule the parent processes that gathers the waiting zombie processes?
Are there any indicators in the sched_debug output that I could look for?
Jan