Skip to contentSkip to conversation

Intel hybrid CPU scheduler always prefers E cores

DISCUSSION Bagas Sanjaya 6 participants 9 messages Nov 28, 2023 – Dec 18, 2023 1 message not in the archive

Subsystems (2)
lore
Share & tools
lore
#0 lore raw

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter

Quoted 6 lines · wrote:

I am running an intel alder lake system (Core i7-1260P), with a mix of P and E cores.

Since Linux 6.6, and also on the current 6.7 RC, the scheduler seems to have a strong preference for the E cores, and single threaded workloads are consistently scheduled on one of the E cores.

With Linux 6.4 and before, when I ran a single threaded CPU-bound process, it was scheduled on a P core. With 6.5, it seems that the choice of P or E seemed rather random.

Quoted 8 lines

I tested these by running "stress" with different amounts of threads. With a single thread on Linux 6.6 and 6.7, I always have an E core at 100% and no load on the P cores. Starting from 3 threads I get some load on the P cores as well, but the E cores stay more heavily loaded. With "taskset" I can force a process to run on a P core, but clearly it's not very practical to have to do CPU scheduling manually.

This severely affects single-threaded performance of my CPU since the E cores are considerably slower. Several of my workflows are now a lot slower due to them being single-threaded and heavily CPU-bound and being scheduled on E cores whereas they would run on P cores before.

I am not sure what the exact desired behaviour is here, to balance power consumption and performance, but currently my P cores are barely used for single-threaded workloads.

Is this intended behaviour or is this indeed a regression? Or is there perhaps any configuration that I should have done from my side? Is there any further info that I can provide to help you figure out what's going on?

PM and scheduler people, is this a regression or works as intended?

Thanks.

[1]: https://bugzilla.kernel.org/show_bug.cgi?id=218195

Signature · 1 line
An old man doll... just what I always wanted! - Clara
maintainer
#1 lore raw
Quoted 4 lines · Bagas Sanjaya

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter wrote:

Thanks for forwarding, what happend in bugzilla staysi in bugzilla etc..

Did you perchance Cc the reporter?

Quoted 29 lines
Quoted 29 lines

I am running an intel alder lake system (Core i7-1260P), with a mix of P and E cores.

Since Linux 6.6, and also on the current 6.7 RC, the scheduler seems to have a strong preference for the E cores, and single threaded workloads are consistently scheduled on one of the E cores.

With Linux 6.4 and before, when I ran a single threaded CPU-bound process, it was scheduled on a P core. With 6.5, it seems that the choice of P or E seemed rather random.

I tested these by running "stress" with different amounts of threads. With a single thread on Linux 6.6 and 6.7, I always have an E core at 100% and no load on the P cores. Starting from 3 threads I get some load on the P cores as well, but the E cores stay more heavily loaded. With "taskset" I can force a process to run on a P core, but clearly it's not very practical to have to do CPU scheduling manually.

This severely affects single-threaded performance of my CPU since the E cores are considerably slower. Several of my workflows are now a lot slower due to them being single-threaded and heavily CPU-bound and being scheduled on E cores whereas they would run on P cores before.

I am not sure what the exact desired behaviour is here, to balance power consumption and performance, but currently my P cores are barely used for single-threaded workloads.

Quoted 6 lines
Quoted 4 lines

Is this intended behaviour or is this indeed a regression? Or is there perhaps any configuration that I should have done from my side? Is there any further info that I can provide to help you figure out what's going on?

PM and scheduler people, is this a regression or works as intended?

AFAIK that is supposed to be steered by the ITMT muck and I don't think we changed that.

Ricardo?

Quoted 7 lines

Thanks.

[1]: https://bugzilla.kernel.org/show_bug.cgi?id=218195

Signature · 1 line
An old man doll... just what I always wanted! - Clara
#2 lore raw
Quoted 10 lines · Peter Zijlstra
Quoted 4 lines · Bagas Sanjaya

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter wrote:

Thanks for forwarding, what happend in bugzilla staysi in bugzilla etc..

Did you perchance Cc the reporter?

Yes, I CC'ed him.

Signature · 1 line
An old man doll... just what I always wanted! - Clara
#4 lore raw
In reply to Bagas Sanjaya
Quoted 18 lines · Bagas Sanjaya

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter

Quoted 13 lines · wrote:

I am running an intel alder lake system (Core i7-1260P), with a mix of P and E cores.

Since Linux 6.6, and also on the current 6.7 RC, the scheduler seems to have a strong preference for the E cores, and single threaded workloads are consistently scheduled on one of the E cores.

With Linux 6.4 and before, when I ran a single threaded CPU-bound process, it was scheduled on a P core. With 6.5, it seems that the choice of P or E seemed rather random.

I tested these by running "stress" with different amounts of threads. With a single thread on Linux 6.6 and 6.7, I always have an E core at 100% and no load on the P cores. Starting from 3 threads I get some load on the P cores as well, but the E cores stay more heavily loaded. With "taskset" I can force a process to run on a P core, but clearly it's not very practical to have to do CPU scheduling manually.

This severely affects single-threaded performance of my CPU since the E cores are considerably slower. Several of my workflows are now a lot slower due to them being single-threaded and heavily CPU-bound and being scheduled on E cores whereas they would run on P cores before.

I am not sure what the exact desired behaviour is here, to balance power consumption and performance, but currently my P cores are barely used for single-threaded workloads.

Quoted 8 lines
Quoted 1 line

Is this intended behaviour or is this indeed a regression? Or is there perhaps any configuration that I should have done from my side? Is there any further info that I can provide to help you figure out what's going on?

PM and scheduler people, is this a regression or works as intended?

Thanks.

[1]: https://bugzilla.kernel.org/show_bug.cgi?id=218195

I have noticed that the current code sometimes is quite trigger happy moving tasks off P-core, whenever there are more than 2 tasks on a core. Sometimes, Short running house keeping tasks
could disturb the running task on P-core as a result.

Can you try the following patch? On my Alder Lake system, I see as I add single threaded tasks, they first run on P-cores, then followed by E-cores with this patch on 6.6.

Tim

From 68a15ef01803c252261ebb47d86dfc1f2c68ae1e Mon Sep 17 00:00:00 2001
From: Tim Chen <[email protected]>
Date: Fri, 6 Oct 2023 15:58:56 -0700
Subject: [PATCH] sched/fair: Don't force smt balancing when CPU has spare
capacity

Currently group_smt_balance is picked whenever there are more than two tasks on a core with two SMT. However, the utilization of those tasks may be low and do not warrant a task migration to a CPU of lower priority.

Adjust sched group clssification and sibling_imbalance() to reflect this consideration. Use sibling_imbalance() to compute imbalance in calculate_imbalance() for the group_smt_balance case.

---
 kernel/sched/fair.c | 23 +++++++++++------------
 1 file changed, 11 insertions(+), 12 deletions(-)
kernel/sched/fair.c +11 -12
index ef7490c4b8b4..7dd7c2d2367a 100644
@@ -9460,14 +9460,15 @@ group_type group_classify(unsigned int imbalance_pct,
 	if (sgs->group_asym_packing)
 		return group_asym_packing;
 
-	if (sgs->group_smt_balance)
-		return group_smt_balance;
-
 	if (sgs->group_misfit_task_load)
 		return group_misfit_task;
 
-	if (!group_has_capacity(imbalance_pct, sgs))
-		return group_fully_busy;
+	if (!group_has_capacity(imbalance_pct, sgs)) {
+		if (sgs->group_smt_balance)
+			return group_smt_balance;
+		else
+			return group_fully_busy;
+	}
 
 	return group_has_spare;
 }
@@ -9573,6 +9574,11 @@ static inline long sibling_imbalance(struct lb_env *env,
 	if (env->idle == CPU_NOT_IDLE || !busiest->sum_nr_running)
 		return 0;
 
+	/* Do not pull tasks off preferred group with spare capacity */
+	if (busiest->group_type == group_has_spare &&
+	    sched_asym_prefer(sds->busiest->asym_prefer_cpu, env->dst_cpu))
+		return 0;
+
 	ncores_busiest = sds->busiest->cores;
 	ncores_local = sds->local->cores;
 
@@ -10411,13 +10417,6 @@ static inline void calculate_imbalance(struct lb_env *env, struct sd_lb_stats *s
 		return;
 	}
 
-	if (busiest->group_type == group_smt_balance) {
-		/* Reduce number of tasks sharing CPU capacity */
-		env->migration_type = migrate_task;
-		env->imbalance = 1;
-		return;
-	}
-
 	if (busiest->group_type == group_imbalanced) {
 		/*
 		 * In the group_imb case we cannot rely on group-wide averages
Signature · 1 line
2.32.0
#5 lore raw

(Sending again since I accidentally sent my last mail as HTML.)

I applied the patch on top of 6.6.2, but unfortunately I see more or less the same behaviour as before, with single-threaded CPU-bound tasks running almost exclusively on E cores.

Ramses

Nov 28, 2023, 18:39 by [email protected]:

Quoted 116 lines · Bagas Sanjaya
Quoted 19 lines

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter

Quoted 13 lines · wrote:

I am running an intel alder lake system (Core i7-1260P), with a mix of P and E cores.

Since Linux 6.6, and also on the current 6.7 RC, the scheduler seems to have a strong preference for the E cores, and single threaded workloads are consistently scheduled on one of the E cores.

With Linux 6.4 and before, when I ran a single threaded CPU-bound process, it was scheduled on a P core. With 6.5, it seems that the choice of P or E seemed rather random.

I tested these by running "stress" with different amounts of threads. With a single thread on Linux 6.6 and 6.7, I always have an E core at 100% and no load on the P cores. Starting from 3 threads I get some load on the P cores as well, but the E cores stay more heavily loaded. With "taskset" I can force a process to run on a P core, but clearly it's not very practical to have to do CPU scheduling manually.

This severely affects single-threaded performance of my CPU since the E cores are considerably slower. Several of my workflows are now a lot slower due to them being single-threaded and heavily CPU-bound and being scheduled on E cores whereas they would run on P cores before.

I am not sure what the exact desired behaviour is here, to balance power consumption and performance, but currently my P cores are barely used for single-threaded workloads.

Quoted 8 lines
Quoted 1 line

Is this intended behaviour or is this indeed a regression? Or is there perhaps any configuration that I should have done from my side? Is there any further info that I can provide to help you figure out what's going on?

PM and scheduler people, is this a regression or works as intended?

Thanks.

[1]: https://bugzilla.kernel.org/show_bug.cgi?id=218195

I have noticed that the current code sometimes is quite trigger happy moving tasks off P-core, whenever there are more than 2 tasks on a core. Sometimes, Short running house keeping tasks
could disturb the running task on P-core as a result.

Can you try the following patch? On my Alder Lake system, I see as I add single threaded tasks, they first run on P-cores, then followed by E-cores with this patch on 6.6.

Tim

From 68a15ef01803c252261ebb47d86dfc1f2c68ae1e Mon Sep 17 00:00:00 2001
From: Tim Chen <[email protected]>
Date: Fri, 6 Oct 2023 15:58:56 -0700
Subject: [PATCH] sched/fair: Don't force smt balancing when CPU has spare
capacity

Currently group_smt_balance is picked whenever there are more than two tasks on a core with two SMT. However, the utilization of those tasks may be low and do not warrant a task migration to a CPU of lower priority.

Adjust sched group clssification and sibling_imbalance() to reflect this consideration. Use sibling_imbalance() to compute imbalance in calculate_imbalance() for the group_smt_balance case.

---
 kernel/sched/fair.c | 23 +++++++++++------------
 1 file changed, 11 insertions(+), 12 deletions(-)
kernel/sched/fair.c +11 -12
index ef7490c4b8b4..7dd7c2d2367a 100644
@@ -9460,14 +9460,15 @@ group_type group_classify(unsigned int imbalance_pct,
 if (sgs->group_asym_packing)
 return group_asym_packing;
 
-	if (sgs->group_smt_balance)
-		return group_smt_balance;
-
 if (sgs->group_misfit_task_load)
 return group_misfit_task;
 
-	if (!group_has_capacity(imbalance_pct, sgs))
-		return group_fully_busy;
+	if (!group_has_capacity(imbalance_pct, sgs)) {
+		if (sgs->group_smt_balance)
+			return group_smt_balance;
+		else
+			return group_fully_busy;
+	}
 
 return group_has_spare;
 }
@@ -9573,6 +9574,11 @@ static inline long sibling_imbalance(struct lb_env *env,
 if (env->idle == CPU_NOT_IDLE || !busiest->sum_nr_running)
 return 0;
 
+	/* Do not pull tasks off preferred group with spare capacity */
+	if (busiest->group_type == group_has_spare &&
+	    sched_asym_prefer(sds->busiest->asym_prefer_cpu, env->dst_cpu))
+		return 0;
+
 ncores_busiest = sds->busiest->cores;
 ncores_local = sds->local->cores;
 
@@ -10411,13 +10417,6 @@ static inline void calculate_imbalance(struct lb_env *env, struct sd_lb_stats *s
 return;
 }
 
-	if (busiest->group_type == group_smt_balance) {
-		/* Reduce number of tasks sharing CPU capacity */
-		env->migration_type = migrate_task;
-		env->imbalance = 1;
-		return;
-	}
-
 if (busiest->group_type == group_imbalanced) {
 /*
 * In the group_imb case we cannot rely on group-wide averages
Signature · 1 line
2.32.0
#7 lore raw
In reply to a message not in the archive
Quoted 3 lines · Ramses

I applied the patch on top of 6.6.2, but unfortunately I see more or less the same behaviour as before, with single-threaded CPU-bound tasks running almost exclusively on E cores.

Ramses

I suspect that you may have other issues. I wonder if CPU priorities are getting assigned properly on your system.

Saw in the original bugzilla
https://bugzilla.kernel.org/show_bug.cgi?id=218195
that you don't see /proc/sys/kernel/sched_itmt_enabled which may be a symptom of such a problem.

+Srinivas, is there something Ramses can do to help find out if there are issues with cppc?

Tim

#8 lore raw

Nov 29, 2023, 00:10 by [email protected]:

Quoted 15 lines · Ramses
Quoted 5 lines

I applied the patch on top of 6.6.2, but unfortunately I see more or less the same behaviour as before, with single-threaded CPU-bound tasks running almost exclusively on E cores.

Ramses

I suspect that you may have other issues. I wonder if CPU priorities are getting assigned properly on your system.

Saw in the original bugzilla
https://bugzilla.kernel.org/show_bug.cgi?id=218195
that you don't see /proc/sys/kernel/sched_itmt_enabled which may be a symptom of such a problem.

Quoted 5 lines

+Srinivas, is there something Ramses can do to help find out if there are issues with cppc?

Tim

Yeah I'm getting the impression that something is going wrong on my system. AFAIU, itmt is supposed to be auto-detected and doesn't require additional config?

I have the intel ME disabled on my CPU (it came like that from the OEM), I don't know if that can have an effect?

Let me know if there's any additional info that I can provide.

Ramses

#9 lore raw
In reply to Tim Chen
Quoted 12 lines · Tim Chen
Quoted 5 lines · Ramses

I applied the patch on top of 6.6.2, but unfortunately I see more or less the same behaviour as before, with single-threaded CPU- bound tasks running almost exclusively on E cores.

Ramses

I suspect that you may have other issues. I wonder if CPU priorities are getting
assigned properly on your system.

Quoted 7 lines

Saw in the original bugzilla
https://bugzilla.kernel.org/show_bug.cgi?id=218195
that you don't see /proc/sys/kernel/sched_itmt_enabled which may be a symptom of such a problem.

+Srinivas, is there something Ramses can do to help find out if there are issues with cppc?

I have updated the bugzilla with the findings. The ACPI config on this system is telling us that CPPC v2 is not supported. Current implementation depends on CPPC v2.

Even in 6.4 kernel, ITMT is not enabled.

Thanks,
Srinivas

Quoted 3 lines

Tim

#3 lore raw
In reply to Peter Zijlstra
Quoted 44 lines · Peter Zijlstra
Quoted 4 lines · Bagas Sanjaya

Hi,

I come across an interesting bug report on Bugzilla [1]. The reporter wrote:

Thanks for forwarding, what happend in bugzilla staysi in bugzilla etc..

Did you perchance Cc the reporter?

Quoted 34 lines
Quoted 33 lines

I am running an intel alder lake system (Core i7-1260P), with a mix of P and E cores.

Since Linux 6.6, and also on the current 6.7 RC, the scheduler seems to have a strong preference for the E cores, and single threaded workloads are consistently scheduled on one of the E cores.

With Linux 6.4 and before, when I ran a single threaded CPU-bound process, it was scheduled on a P core. With 6.5, it seems that the choice of P or E seemed rather random.

I tested these by running "stress" with different amounts of threads. With a single thread on Linux 6.6 and 6.7, I always have an E core at 100% and no load on the P cores. Starting from 3 threads I get some load on the P cores as well, but the E cores stay more heavily loaded. With "taskset" I can force a process to run on a P core, but clearly it's not very practical to have to do CPU scheduling manually.

This severely affects single-threaded performance of my CPU since the E cores are considerably slower. Several of my workflows are now a lot slower due to them being single-threaded and heavily CPU-bound and being scheduled on E cores whereas they would run on P cores before.

I am not sure what the exact desired behaviour is here, to balance power consumption and performance, but currently my P cores are barely used for single-threaded workloads.

Is this intended behaviour or is this indeed a regression? Or is there perhaps any configuration that I should have done from my side? Is there any further info that I can provide to help you figure out what's going on?

Quoted 6 lines
Quoted 1 line

PM and scheduler people, is this a regression or works as intended?

AFAIK that is supposed to be steered by the ITMT muck and I don't think we changed that.

Ricardo?

Sorry for the late reply. This email was buried in a ton of email. To complete report here, Srinivas helped to debug the issue. The problem is that the computer in question lacks the necessary ACPI support to use ITMT.

A new firmware release appears to have solved the issue.

Thanks and BR,
Ricardo