Current Dev Position: YP 3.3 M3 development

Next Deadline: 1st March 2021 YP 3.3 M3 build

Next Team Meetings:

* Bug Triage meeting Thursday Feb. 18th at 7:30am PDT (
<https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09>
https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
* Monthly Project Meeting Tuesday Mar. 2nd at 8am PDT (
<https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09>
https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09
<https://zoom.us/j/990892712> )
* Weekly Engineering Sync Tuesday Feb. 16th at 8am PDT (
<https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09>
https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09
<https://zoom.us/j/990892712> )
* Twitch - See https://www.twitch.tv/theyoctojester

Key Status/Updates:

* YP 3.2.2 is currently building.
* We've been upgrading uninative and buildtools-extended-tarball
however glibc 2.33 has caused issues with build in containers and with pseudo. Hopefully these issues are now resolved or worked around with the latest patches.
* There is apparently a reputation that Yocto Project is not
reproducible. It's builds are! We now have an live status report on our website for this:
<https://www.yoctoproject.org/reproducible-build-results/>
https://www.yoctoproject.org/reproducible-build-results/ showing the status live from the autobuilder (thanks Joshua and Michael)
* Given the above, we've managed to improve the reproducible selftest
by separating to its own autobuilder target and showing which exclusions are no longer needed.
* We have also fixed reproducibility issues in a number of recipes.
There are still some low hanging issues in the current exclusion list.
* The AUH (Automatic Upgrade Helper) has run and was relatively
successful, please help us get the version upgrades in before M3 builds on the 1st.
* We've changed the default umask applying to tasks in builds to make
it easier to avoid reproducibility issues (bitbake now has a BB_DEFAULT_UMASK variable).
* Intermittent autobuilder issues continue to occur. You can see the
list of failures we're continuing to see by searching for the "AB-INT" tag in bugzilla:
<https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT>
https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

Ways to contribute:

* There are bugs identified as possible for newcomers to the project:
<https://wiki.yoctoproject.org/wiki/Newcomers>
https://wiki.yoctoproject.org/wiki/Newcomers
* There are bugs that are currently unassigned for YP 3.3. See:
<https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enha
ncements.2FBugs>
https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhan
cements.2FBugs
* We'd welcome new maintainers for recipes in OE-Core. Please see the
list at:
<http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/mai
ntainers.inc>
http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/main
tainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to "Unassigned" soon to help facilitate this.

YP 3.3 Milestone Dates:

* YP 3.3 M3 build date 2021/03/01
* YP 3.3 M3 Release date 2021/03/12
* YP 3.3 M4 build date 2021/04/05
* YP 3.3 M4 Release date 2021/04/30

Planned upcoming dot releases:

* YP 3.2.2 is building.
* YP 3.2.2 release date 2021/02/19
* YP 3.1.6 build date 2021/02/22
* YP 3.1.6 release date 2021/03/05
* YP 3.2.3 build date 2021/03/15
* YP 3.2.3 release date 2021/03/26
* YP 3.1.7 build date 2021/03/29
* YP 3.1.7 release date 2021/04/09

Tracking Metrics:

* WDD 2618 (last week 2639) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
* Poky Patch Metrics

* Total patches found: 1272 (last week 1278)
* Patches in the Pending State: 490 (39%) [last week 495 (39%)]

The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at:

<https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

[If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley

Yocto Project Program Manager

* Cell: (208) 244-4460

* Email: [email protected]
<mailto:[email protected]>