Patch "tools lib traceevent: Fix prev/next_prio for deadline tasks" has been added to the 4.9-stable tree
This is a note to let you know that I've just added the patch titled
tools lib traceevent: Fix prev/next_prio for deadline tasks
to the 4.9-stable tree which can be found at:
http://www.kernel.org/git/?p=linux/kernel/git/stable/stable-queue.git;a=summary
The filename of the patch is:
tools-lib-traceevent-fix-prev-next_prio-for-deadline-tasks.patch
and it can be found in the queue-4.9 subdirectory.
If you, or anyone else, feels it should not be added to the stable tree, please let <[email protected]> know about it.
Quoted 1 line
From foo@baz Fri Aug 4 15:15:01 PDT 2017
From: Daniel Bristot de Oliveira <[email protected]>
Date: Tue, 3 Jan 2017 12:42:42 +0100
Subject: tools lib traceevent: Fix prev/next_prio for deadline tasks
From: Daniel Bristot de Oliveira <[email protected]>
[ Upstream commit 074859184d770824f4437dca716bdeb625ae8b1c ]
Currently, the sched:sched_switch tracepoint reports deadline tasks with priority -1. But when reading the trace via perf script I've got the following output:
# ./d & # (d is a deadline task, see [1])
# perf record -e sched:sched_switch -a sleep 1
# perf script
...
swapper 0 [000] 2146.962441: sched:sched_switch: swapper/0:0 [120] R ==> d:2593 [4294967295]
d 2593 [000] 2146.972472: sched:sched_switch: d:2593 [4294967295] R ==> g:2590 [4294967295]The task d reports the wrong priority [4294967295]. This happens because the "int prio" is stored in an unsigned long long val. Although it is set as a %lld, as int is shorter than unsigned long long, trace_seq_printf prints it as a positive number.
The fix is just to cast the val as an int, and print it as a %d, as in the sched:sched_switch tracepoint's "format".
The output with the fix is:
# ./d &
# perf record -e sched:sched_switch -a sleep 1
# perf script
...
swapper 0 [000] 4306.374037: sched:sched_switch: swapper/0:0 [120] R ==> d:10941 [-1]
d 10941 [000] 4306.383823: sched:sched_switch: d:10941 [-1] R ==> swapper/0:0 [120][1] d.c
---
#include <stdio.h>
#include <unistd.h>
#include <sys/syscall.h>
#include <linux/types.h>
#include <linux/sched.h>
struct sched_attr {
__u32 size, sched_policy;
__u64 sched_flags;
__s32 sched_nice;
__u32 sched_priority;
__u64 sched_runtime, sched_deadline, sched_period;};
int sched_setattr(pid_t pid, const struct sched_attr *attr, unsigned int flags)
{
return syscall(__NR_sched_setattr, pid, attr, flags);}
int main(void)
{
struct sched_attr attr = {
.size = sizeof(attr),
.sched_policy = SCHED_DEADLINE, /* This creates a 10ms/30ms reservation */
.sched_runtime = 10 * 1000 * 1000,
.sched_period = attr.sched_deadline = 30 * 1000 * 1000,
};
if (sched_setattr(0, &attr, 0) < 0) {
perror("sched_setattr");
return -1;
}
for(;;); }
---
Committer notes:
Got the program from the provided URL, http://bristot.me/lkml/d.c,
trimmed it and included in the cset log above, so that we have everything needed to test it in one place.
--- tools/lib/traceevent/plugin_sched_switch.c | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-)
tools/lib/traceevent/plugin_sched_switch.c +2 -2
@@ -111,7 +111,7 @@ static int sched_switch_handler(struct ttrace_seq_printf (s,"%lld " , val);if (pevent_get_field_val (s, event,"prev_prio" , record, &val,0 ) ==0 ) -trace_seq_printf (s,"[%lld] " , val); +trace_seq_printf (s,"[%d] " , (int ) val);if (pevent_get_field_val (s, event,"prev_state" , record, &val,0 ) ==0 )write_state (s, val);
@@ -129,7 +129,7 @@ static int sched_switch_handler(struct ttrace_seq_printf (s,"%lld" , val);if (pevent_get_field_val (s, event,"next_prio" , record, &val,0 ) ==0 ) -trace_seq_printf (s," [%lld]" , val); +trace_seq_printf (s," [%d]" , (int ) val);return 0 ; }
Patches currently in stable-queue which might be from [email protected] are
queue-4.9/tools-lib-traceevent-fix-prev-next_prio-for-deadline-tasks.patch