WimMark I for 2.5.64-mm2
WimMark I report for 2.5.64-mm2
Runs with deadline scheduler: 1580.10 1537.95 Runs with anticipatory scheduler: 632.87 597.33 555.19
WimMark I is a rough benchmark we have been running
here at Oracle against various kernels. Each run tests an OLTP workload on the Oracle database with somewhat restrictive memory conditions. This reduces in-memory buffering of data, allowing for more I/O. The I/O is read and sync write, random and seek-laden.
The benchmark is called "WimMark I" because it has no
official standing and is only a relative benchmark useful for comparing kernel changes. The benchmark is normalized an arbitrary kernel, which scores 1000.0. All other numbers are relative to this.
The machine in question is a 4 way 700 MHz Xeon machine with 2GB
of RAM. CONFIG_HIGHMEM4GB is selected. The disk accessed for data is a 10K RPM U2W SCSI of similar vintage. The data files are living on an ext3 filesystem. Unless mentioned, all runs are
on this machine (variation in hardware would indeed change the benchmark).
Signature · 9 lines
"There are some experiences in life which should not be demanded
twice from any man, and one of them is listening to the Brahms Requiem."
- George Bernard Shaw
Joel Becker
Senior Member of Technical Staff
Oracle Corporation
E-mail: [email protected]
Phone: (650) 506-8127Quoted 6 lines · Joel Becker
WimMark I report for 2.5.64-mm2
Runs with deadline scheduler: 1580.10 1537.95 Runs with anticipatory scheduler: 632.87 597.33 555.19
The anticipatory scheduler will never be better than deadline with these sorts of workloads. The best we can do is to equal it.
With other OLTP-style tests, AS is at worst 5-10% behind deadline.
So what's up with WimMark? Is it possible that the test is exhibiting some nonlinearity, wherein a small change in inputs causes a large swing in output?
One way to tell that would be to perform several runs with different values of /sys/block/sdXX/io_sched/antic_expire. And see how the overall runtime varies as that is altered.
The default it currently 10 (milliseconds). With zero you should get the same throughput as deadline.
I'm not sure what to conclude from this result. Can you shed any light on what it means, on what's going on?