HFSC parameter
My problem with HFSC tc command is ...
tc command's HFSC have a lot parameter with 4 curve type
SC curve -> umax dmax rate
LS curve -> umax dmax rate
RT curve -> umax dmax rate
UL curve -> umax dmax rate
so i'dont know which parameter are appropriate for my test case such real time class which curve are appropriate and good working result.
my assumption about umax,dmax,rate ... this is true
first, HFSC will doing with "umax" rate but after delay exceed "dmax" rate, HFSC will change rate to "rate" ????
Can everybody tell me all 12 parameter ,what does it mean????
thank you
raku
---------------------------------
All-new Yahoo! Mail - Fire up a more powerful email and get things done faster.
_______________________________________________
LARTC mailing list
[email protected]
http://mailman.ds9a.nl/cgi-bin/mailman/listinfo/lartc
Thossapron Apinyapanha napisał(a):
Quoted 1 line
Can everybody tell me all 12 parameter ,what does it mean????
Nobody knows:)
Is anybody here, who is using HFSC?
_______________________________________________
LARTC mailing list
[email protected]
http://mailman.ds9a.nl/cgi-bin/mailman/listinfo/lartc
Quoted 9 lines · Thossapron Apinyapanha
tc command's HFSC have a lot parameter with 4 curve type
SC curve -> umax dmax rate
LS curve -> umax dmax rate
RT curve -> umax dmax rate
UL curve -> umax dmax rateso i'dont know which parameter are appropriate for my test case such real time class which curve are appropriate and good working result.
LS = link-share service curve, defines relation of service between sibling classes. Can be used for intermediate and leaf classes.
UL = upper-limit service curve, limits LS curve.
RS = real-time service curve, defines absolute service guarantees for leaf classes. Can be used, but does nothing for intermediate classes.
SC = service curve, sets LS and RS to the same curve. Should usually be used for leaf-classes instead of RS.
Quoted 3 lines
my assumption about umax,dmax,rate ... this is true
first, HFSC will doing with "umax" rate but after delay exceed "dmax" rate, HFSC will change rate to "rate" ????
No, this is true for m1, d and m2 (use rate m1 for time d, then m2). umax, dmax and rate are another way to specify the curve, m2 = rate and m1 and d are calculated from umax and dmax.