Rust test too long
Hello Eric,
The tests.package.test_rust.TestRust test case takes more than 3 hours and Gitlab, and causes the overall test suite to always fail:
https://gitlab.com/buildroot.org/buildroot/pipelines/23578303/failures
(This one also has a failure related to check-package caused by the mender package, but I've fixed that)
Is this expected that this test takes as much as 3 hours ? Is there something we can do to reduce this ?
Best regards,
Thomas
Signature · 3 lines
Thomas Petazzoni, CTO, Bootlin (formerly Free Electrons) Embedded Linux and Kernel engineering https://bootlin.com
Hi!
Quoted 5 lines · Thomas Petazzoni
Hello Eric,
The tests.package.test_rust.TestRust test case takes more than 3 hours and Gitlab, and causes the overall test suite to always fail:
Quoted 7 lines
https://gitlab.com/buildroot.org/buildroot/pipelines/23578303/failures
(This one also has a failure related to check-package caused by the mender package, but I've fixed that)
Is this expected that this test takes as much as 3 hours ? Is there something we can do to reduce this ?
What is the horsepower of the Gitlab instance?
When building rust from source, the longest part is building the LLVM backend.
On a 4-core i5-7500 CPU @ 3.40GHz, TestRust takes 60 minutes. But on a 4-core i3-4010U CPU @ 1.70GHz, it does takes nearly 3 hours...
Regards.
--
ELB
Hello,
Quoted 4 lines · Eric Le Bihan
Quoted 2 lines
Is this expected that this test takes as much as 3 hours ? Is there something we can do to reduce this ?
What is the horsepower of the Gitlab instance?
I have no idea :-/
Quoted 5 lines
When building rust from source, the longest part is building the LLVM backend.
On a 4-core i5-7500 CPU @ 3.40GHz, TestRust takes 60 minutes. But on a 4-core i3-4010U CPU @ 1.70GHz, it does takes nearly 3 hours...
OK, so it is not crazy that the Gitlab instances are not able to build this. So, I'd say we need to:
- In the short term, disable this test from the Gitlab testing. Do you think you could look into this ?
- In the mid/long term, have our own Gitlab instances, that have more horsepower and no limit in the duration of jobs.
Best regards,
Thomas
Signature · 3 lines
Thomas Petazzoni, CTO, Bootlin (formerly Free Electrons) Embedded Linux and Kernel engineering https://bootlin.com
Quoted 17 lines · Thomas Petazzoni
Hello,
Quoted 4 lines · Eric Le Bihan
Quoted 2 lines
Is this expected that this test takes as much as 3 hours ? Is there something we can do to reduce this ?
What is the horsepower of the Gitlab instance?
I have no idea :-/
Quoted 5 lines
When building rust from source, the longest part is building the LLVM backend.
On a 4-core i5-7500 CPU @ 3.40GHz, TestRust takes 60 minutes. But on a 4-core i3-4010U CPU @ 1.70GHz, it does takes nearly 3 hours...
Quoted 8 lines
OK, so it is not crazy that the Gitlab instances are not able to build this. So, I'd say we need to:
- In the short term, disable this test from the Gitlab testing. Do you think you could look into this ?
- In the mid/long term, have our own Gitlab instances, that have more horsepower and no limit in the duration of jobs.
I actually have spare cycles @work, but I'm lacking the time to set up a gitlab
runner instance. I'm also lacking in disk space but for the tests it should be fine.
Regards,
Arnout
Signature · 6 lines
Arnout Vandecappelle arnout at mind be Senior Embedded Software Architect +32-16-286500 Essensium/Mind http://www.mind.be G.Geenslaan 9, 3001 Leuven, Belgium BE 872 984 063 RPR Leuven LinkedIn profile: http://www.linkedin.com/in/arnoutvandecappelle GPG fingerprint: 7493 020B C7E3 8618 8DEC 222C 82EB F404 F9AC 0DDF