drm/sched: Remove optimization that causes hang when killing dependent jobs
Subsystems (3)
PATCH v2 1/1 drm/sched: Remove optimization that causes hang when killing dependent jobs
When application A submits jobs and application B submits a job with a dependency on A's fence, the normal flow wakes up the scheduler after processing each job. However, the optimization in drm_sched_entity_add_dependency_cb() uses a callback that only clears dependencies without waking up the scheduler.
When application A is killed before its jobs can run, the callback gets triggered but only clears the dependency without waking up the scheduler, causing the scheduler to enter sleep state and application B to hang.
Remove the optimization by deleting drm_sched_entity_clear_dep() and its usage, ensuring the scheduler is always woken up when dependencies are cleared.
--- drivers/gpu/drm/scheduler/sched_entity.c | 21 ++------------------- 1 file changed, 2 insertions(+), 19 deletions(-)
drivers/gpu/drm/scheduler/sched_entity.c +2 -19
@@ -355,17 +355,6 @@ void drm_sched_entity_destroy(struct drm_sched_entity *entity) }EXPORT_SYMBOL (drm_sched_entity_destroy); -/* drm_sched_entity_clear_dep - callback to clear the entities dependency */ -static void drm_sched_entity_clear_dep (struct dma_fence *f, -struct dma_fence_cb *cb) -{ -struct drm_sched_entity *entity = - container_of(cb, struct drm_sched_entity, cb); - - entity->dependency =NULL ; -dma_fence_put (f); -} -/* * drm_sched_entity_wakeup - callback to clear the entity's dependency and * wake up the scheduler
@@ -376,7 +365,8 @@ static void drm_sched_entity_wakeup(struct dma_fence *f,struct drm_sched_entity *entity = container_of(cb, struct drm_sched_entity, cb); -drm_sched_entity_clear_dep (f, cb); + entity->dependency =NULL ; +dma_fence_put (f);drm_sched_wakeup (entity->rq->sched); }
@@ -429,13 +419,6 @@ static bool drm_sched_entity_add_dependency_cb(struct drm_sched_entity *entity) fence =dma_fence_get (&s_fence->scheduled);dma_fence_put (entity->dependency); entity->dependency = fence; -if (!dma_fence_add_callback (fence, &entity->cb, - drm_sched_entity_clear_dep)) -return true; - -/* Ignore it when it is already scheduled */ -dma_fence_put (fence); -return false; } if (!dma_fence_add_callback(entity->dependency, &entity->cb,
Signature · 1 line
2.46.1
Philipp Stanner
AppliedQuoted 19 lines · Lin.Cao
When application A submits jobs and application B submits a job with a
dependency on A's fence, the normal flow wakes up the scheduler after processing each job. However, the optimization indrm_sched_entity_add_dependency_cb()uses a callback that only clears dependencies without waking up the scheduler.When application A is killed before its jobs can run, the callback gets
triggered but only clears the dependency without waking up the scheduler,
causing the scheduler to enter sleep state and application B to hang.Remove the optimization by deleting
drm_sched_entity_clear_dep()and its
usage, ensuring the scheduler is always woken up when dependencies are
cleared.
Quoted 5 lines
Fixes 777dbd458c89 ("drm/amdgpu: drop a dummy wakeup scheduler")Cc [email protected] # v4.6+Signed-off-by Lin.Cao <[email protected]>Reviewed-by Christian König <[email protected]>
Applied to drm-misc-fixes, thank you.
P.
Quoted 57 lines
---
drivers/gpu/drm/scheduler/sched_entity.c | 21 ++-------------------1 file changed, 2 insertions(+), 19 deletions(-)drivers/gpu/drm/scheduler/sched_entity.c +0
-0@@ -355,17 +355,6 @@ void drm_sched_entity_destroy(struct drm_sched_entity *entity) } EXPORT_SYMBOL(drm_sched_entity_destroy);
-/*drm_sched_entity_clear_dep- callback to clear the entities dependency */drivers/gpu/drm/scheduler/sched_entity.c +0
-10-static void drm_sched_entity_clear_dep (struct dma_fence *f, - struct dma_fence_cb *cb) -{ -struct drm_sched_entity *entity = - container_of(cb, struct drm_sched_entity, cb); - - entity->dependency =NULL ; -dma_fence_put (f); -} -/*
*drm_sched_entity_wakeup- callback to clear the entity's dependency and
* wake up the schedulerdrivers/gpu/drm/scheduler/sched_entity.c +0
-0@@ -376,7 +365,8 @@ static void drm_sched_entity_wakeup(struct dma_fence *f,struct
drm_sched_entity*entity =container_of(cb, struct drm_sched_entity, cb);drivers/gpu/drm/scheduler/sched_entity.c +2
-1-drm_sched_entity_clear_dep (f, cb); + entity->dependency =NULL ; +dma_fence_put (f);
drm_sched_wakeup(entity->rq->sched);
}drivers/gpu/drm/scheduler/sched_entity.c +0
-7@@ -429,13 +419,6 @@ static bool drm_sched_entity_add_dependency_cb(struct drm_sched_entity *entity) fence = dma_fence_get(&s_fence->scheduled); dma_fence_put(entity->dependency); entity->dependency = fence; -if (!dma_fence_add_callback (fence, &entity->cb, - drm_sched_entity_clear_dep)) -return true; - -/* Ignore it when it is already scheduled */ -dma_fence_put (fence); -return false; }
if (!dma_fence_add_callback(entity->dependency,&entity->cb,