tests/qtest/migration: Fix slow test dirty_limit
PATCH 1/1 tests/qtest/migration: Fix slow test dirty_limit
After the referenced commit, the incoming side doesn't exit automatically after a failure. Tests that expect the destination to fail should use -incoming defer, issue QMP migrate-incoming, wait for the failure event and issue QMP quit.
Fix the dirty_limit test which wasn't updated properly.
--- tests/qtest/migration/precopy-tests.c | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-)
tests/qtest/migration/precopy-tests.c +2 -2
@@ -1070,11 +1070,10 @@ static void test_dirty_limit(char *name, MigrateCommon *args) args->start.hide_stderr = true; args->start.use_dirty_ring = true; - args->listen_uri = uri; args->connect_uri = uri;/* Start src, dst vm */ -if (migrate_start (&from, &to, args->listen_uri, &args->start)) { +if (migrate_start (&from, &to,"defer" , &args->start)) {return ; }
@@ -1082,6 +1081,7 @@ static void test_dirty_limit(char *name, MigrateCommon *args)migrate_dirty_limit_wait_showup (from, dirtylimit_period, dirtylimit_value);/* Start migrate */ +migrate_incoming_qmp (to, args->connect_uri,NULL ,"{}" );migrate_qmp (from, to, args->connect_uri,NULL ,"{}" );/* Wait for dirty limit throttle begin */
Signature · 1 line
2.51.0
Quoted 10 lines · Fabiano Rosas
After the referenced commit, the incoming side doesn't exit automatically after a failure. Tests that expect the destination to fail should use -incoming defer, issue QMP migrate-incoming, wait for the failure event and issue QMP quit.
Fix the
dirty_limittest which wasn't updated properly.Fixes 4e8c4dda97 ("tests/qtest/migration: Force exit-on-error=false")Reported-by Thomas Huth <[email protected]>Signed-off-by Fabiano Rosas <[email protected]>
Highly likely I missed something, but could you remind me what is the problem before the change, and why "defer" fixes it?
The current failure path in this test is:
/* Now cancel migrate and wait for dirty limit throttle switch off */
migrate_cancel(from);
wait_for_migration_status(from, "cancelled", NULL);
/* destination always fails after cancel */
migration_event_wait(to, "failed");
qtest_set_expected_status(to, EXIT_FAILURE);
qtest_quit(to);It waits for "failed", so IIUC after switching to exit-on-error it'll make sure things got gracefully shutdown before qtest_quit(). So I'm a bit lost on what we're fixing.
PS: a nitpick is if we could always attach a "Link:" to the commit message, it might help a bit on knowing the original report too.
Quoted 32 lines
--- tests/qtest/migration/precopy-tests.c | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-)tests/qtest/migration/precopy-tests.c +2
-2@@ -1070,11 +1070,10 @@ static void test_dirty_limit(char *name, MigrateCommon *args) args->start.hide_stderr = true; args->start.use_dirty_ring = true; - args->listen_uri = uri; args->connect_uri = uri;/* Start src, dst vm */ -if (migrate_start (&from, &to, args->listen_uri, &args->start)) { +if (migrate_start (&from, &to,"defer" , &args->start)) {return ; }@@ -1082,6 +1081,7 @@ static void test_dirty_limit(char *name, MigrateCommon *args)migrate_dirty_limit_wait_showup (from, dirtylimit_period, dirtylimit_value);/* Start migrate */ +migrate_incoming_qmp (to, args->connect_uri,NULL ,"{}" );migrate_qmp (from, to, args->connect_uri,NULL ,"{}" );/* Wait for dirty limit throttle begin */ Signature · 1 line
2.51.0
Signature · 1 line
Peter Xu
Quoted 6 lines · Peter Xu
Quoted 5 lines · Fabiano Rosas
After the referenced commit, the incoming side doesn't exit automatically after a failure. Tests that expect the destination to fail should use -incoming defer, issue QMP migrate-incoming, wait for the failure event and issue QMP quit.
Quoted 9 lines
Quoted 5 lines
Fix the
dirty_limittest which wasn't updated properly.Fixes 4e8c4dda97 ("tests/qtest/migration: Force exit-on-error=false")Reported-by Thomas Huth <[email protected]>Signed-off-by Fabiano Rosas <[email protected]>Highly likely I missed something, but could you remind me what is the problem before the change, and why "defer" fixes it?
The original issue was that on failure the incoming side exits abruptly and leaves resources in the io/channel.c and io/task.c without freeing and that triggers ASAN (when in use). The fix was to set exit-on-error=false always. -incoming defer is needed because -incoming uri has no means of setting the exit-on-error flag, we need an explicit call to migrate-incoming to be able to set the flag.
The dirty_limit test was not updated properly because it's under g_slow and I forgot to test it. I removed the qtest_set_expected_status(to, EXIT_FAILURE) line, but didn't make sure exit-on-error is set to false for this test. So it's now aborting with "expected 0, got 1".
Quoted 50 lines
The current failure path in this test is:
/* Now cancel migrate and wait for dirty limit throttle switch off */ migrate_cancel(from); wait_for_migration_status(from, "cancelled", NULL); /* destination always fails after cancel */ migration_event_wait(to, "failed"); qtest_set_expected_status(to, EXIT_FAILURE); qtest_quit(to);It waits for "failed", so IIUC after switching to exit-on-error it'll make sure things got gracefully shutdown before
qtest_quit(). So I'm a bit lost on what we're fixing.PS: a nitpick is if we could always attach a "Link:" to the commit message, it might help a bit on knowing the original report too.
Quoted 32 lines
--- tests/qtest/migration/precopy-tests.c | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-)tests/qtest/migration/precopy-tests.c +2
-2@@ -1070,11 +1070,10 @@ static void test_dirty_limit(char *name, MigrateCommon *args) args->start.hide_stderr = true; args->start.use_dirty_ring = true; - args->listen_uri = uri; args->connect_uri = uri;/* Start src, dst vm */ -if (migrate_start (&from, &to, args->listen_uri, &args->start)) { +if (migrate_start (&from, &to,"defer" , &args->start)) {return ; }@@ -1082,6 +1081,7 @@ static void test_dirty_limit(char *name, MigrateCommon *args)migrate_dirty_limit_wait_showup (from, dirtylimit_period, dirtylimit_value);/* Start migrate */ +migrate_incoming_qmp (to, args->connect_uri,NULL ,"{}" );migrate_qmp (from, to, args->connect_uri,NULL ,"{}" );/* Wait for dirty limit throttle begin */ Signature · 1 line
2.51.0
Peter Xu
Reviewed-byQuoted 25 lines · Fabiano Rosas
Quoted 6 lines · Peter Xu
Quoted 5 lines · Fabiano Rosas
After the referenced commit, the incoming side doesn't exit automatically after a failure. Tests that expect the destination to fail should use -incoming defer, issue QMP migrate-incoming, wait for the failure event and issue QMP quit.
Quoted 9 lines
Quoted 5 lines
Fix the
dirty_limittest which wasn't updated properly.Fixes 4e8c4dda97 ("tests/qtest/migration: Force exit-on-error=false")Reported-by Thomas Huth <[email protected]>Signed-off-by Fabiano Rosas <[email protected]>Highly likely I missed something, but could you remind me what is the problem before the change, and why "defer" fixes it?
The original issue was that on failure the incoming side exits abruptly and leaves resources in the
io/channel.candio/task.cwithout freeing and that triggers ASAN (when in use). The fix was to set exit-on-error=false always. -incoming defer is needed because -incoming uri has no means of setting the exit-on-error flag, we need an explicit call to migrate-incoming to be able to set the flag.
Quoted 4 lines
The
dirty_limittest was not updated properly because it's underg_slowand I forgot to test it. I removed theqtest_set_expected_status(to, EXIT_FAILURE)line, but didn't make sure exit-on-error is set to false for this test. So it's now aborting with "expected 0, got 1".
Mistery resolved after I git pull looking at the new code..
Signature · 1 line
Peter Xu