A question on the credit scheduler
Hi All,
In the credit scheduler, the scheduling decision function csched_schedule() is called in the schedule function in scheduler.c, such as the following. next_slice = sched->do_schedule(sched, now, tasklet_work_scheduled);
But, how often the csched_schedule() is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?
Best Regards,
Gavin
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
2011/12/16 zhikai <[email protected]>:
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function csched_schedule() is called in the schedule function in
scheduler.c, such as the following.next_slice=sched->do_schedule(sched, now, tasklet_work_scheduled);But, how often the csched_schedule() is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?
The scheduler runs whenever the SCHEDULE_SOFTIRQ is raised. If you grep through the source code fro that string, you can find all the places where it's raised.
Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up
* When a vcpu blocks
* When a vcpu is migrated from one cpu to another
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
-George
At 2011-12-16 19:04:19,"George Dunlap" <[email protected]> wrote:>2011/12/16 zhikai <[email protected]>:
Quoted 20 lines
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function
csched_schedule()is called in the schedule function inscheduler.c, such as the following.next_slice=sched->do_schedule(sched, now, tasklet_work_scheduled);But, how often the
csched_schedule()is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?The scheduler runs whenever the
SCHEDULE_SOFTIRQis raised. If you grep through the source code fro that string, you can find all the places where it's raised.Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up
* When a vcpu blocks
* When a vcpu is migrated from one cpu to another
Quoted 3 lines
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the SCHEDULE_SOFTIRQ is raised. And we cannot find a small timeslice, such as a(ms), which makes the time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
Best Regards,
Gavin
Quoted 7 lines
-George
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
2011/12/16 gavin <[email protected]>:
Quoted 23 lines
Quoted 21 lines · At 2011-12-16 19:04:19,"George Dunlap" <[email protected]> wrote:
2011/12/16 zhikai <[email protected]>:
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function csched_schedule() is called in the schedule function in scheduler.c, such as the following. next_slice = sched->do_schedule(sched, now, tasklet_work_scheduled);
But, how often the csched_schedule() is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?
The scheduler runs whenever the SCHEDULE_SOFTIRQ is raised. If you grep through the source code fro that string, you can find all the places where it's raised.
Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up * When a vcpu blocks
* When a vcpu is migrated from one cpu to another
Quoted 8 lines
Quoted 3 lines
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the SCHEDULE_SOFTIRQ is raised.
It depends; if you have a cpu-burning vcpu running on a cpu all by itself, then after its 30ms timeslice, Xen will have no one else to run, and so will let it run again.
But yes, if there are other vcpus on the runqueue, or the host is moderately busy, it's likely that SCHEDULE_SOFTIRQ will cause a context-switch.
Quoted 3 lines
And we cannot find a small timeslice, such as a(ms), which makes the time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
I'm sorry, I don't really understand your question. Perhaps if you told me what you're trying to accomplish?
-George
Quoted 41 lines · At 2011-12-16 23:58:26,"George Dunlap" <[email protected]> wrote:
2011/12/16 gavin <[email protected]>:
Quoted 23 lines
Quoted 21 lines · At 2011-12-16 19:04:19,"George Dunlap" <[email protected]> wrote:
2011/12/16 zhikai <[email protected]>:
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function
csched_schedule()is called in the schedule function inscheduler.c, such as the following.next_slice=sched->do_schedule(sched, now, tasklet_work_scheduled);But, how often the
csched_schedule()is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?The scheduler runs whenever the
SCHEDULE_SOFTIRQis raised. If you grep through the source code fro that string, you can find all the places where it's raised.Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up
* When a vcpu blocks
* When a vcpu is migrated from one cpu to anotherQuoted 8 lines
Quoted 3 lines
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the
SCHEDULE_SOFTIRQis raised.It depends; if you have a cpu-burning vcpu running on a cpu all by itself, then after its 30ms timeslice, Xen will have no one else to run, and so will let it run again.
But yes, if there are other vcpus on the runqueue, or the host is moderately busy, it's likely that
SCHEDULE_SOFTIRQwill cause a context-switch.
Quoted 6 lines
Quoted 3 lines
And we cannot find a small timeslice, such as a(ms), which makes the time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
I'm sorry, I don't really understand your question. Perhaps if you told me what you're trying to accomplish?
I try to describe my idea as the following clearly. But I really don't know if it will work. Please give me some advice if possible.
According to the credit scheduler in Xen, a vCPU can run a 30ms timeslice when it is scheduled on the physical CPU. And, a vCPU with the BOOST priority will preempt the running one and run additional 10ms. So, what I think is if we monitor the physical CPU every 10ms and we can get the mapping information of a physical CPU and a vCPU. And also, we can get the un-mapping information that a physical CPU isn’t mapped to any vCPU. Thus, we can get the CPU usage by calculating the proportion of the mapping information to the total time when we monitored.
For example, if we monitor the physical CPUs every 10ms and we can get 100 pairs of pCPU and vCPU in a second, such as (pCPU_id, vCPU_id). If there is 60 mapping pairs that the pCPU is mapped to a valid vPCU, and 40 un-mapping pairs that we cannot find the pCPU to be mapped a valid vCPU. So, we can get the usage of the physical CPUs that is 60%.
Here, we monitor the physical CPUs every 10ms. We also can monitor them once less than the 10ms interval, such as 1ms interval. Whatever interval we choose, we must make sure no CPU content switch in the interval or the context switch always occur at the edge of interval. Only in this condition, can this idea work.
So, I am not sure whether we can find such a time interval that can meet this condition. In other words, whether we can find such a time interval that ensures all the CPU content switch occur at the edge of interval.
Thank you very much.
Gavin
Quoted 6 lines
-George
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
2011/12/17 gavin <[email protected]>:
Quoted 74 lines
Quoted 41 lines · At 2011-12-16 23:58:26,"George Dunlap" <[email protected]> wrote:
2011/12/16 gavin <[email protected]>:
Quoted 23 lines
Quoted 21 lines · At 2011-12-16 19:04:19,"George Dunlap" <[email protected]> wrote:
2011/12/16 zhikai <[email protected]>:
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function csched_schedule() is called in the schedule function in scheduler.c, such as the following. next_slice = sched->do_schedule(sched, now, tasklet_work_scheduled);
But, how often the csched_schedule() is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?
The scheduler runs whenever the SCHEDULE_SOFTIRQ is raised. If you grep through the source code fro that string, you can find all the places where it's raised.
Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up * When a vcpu blocks
* When a vcpu is migrated from one cpu to anotherQuoted 8 lines
Quoted 3 lines
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the SCHEDULE_SOFTIRQ is raised.
It depends; if you have a cpu-burning vcpu running on a cpu all by itself, then after its 30ms timeslice, Xen will have no one else to run, and so will let it run again.
But yes, if there are other vcpus on the runqueue, or the host is moderately busy, it's likely that SCHEDULE_SOFTIRQ will cause a context-switch.
Quoted 6 lines
Quoted 3 lines
And we cannot find a small timeslice, such as a(ms), which makes the time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
I'm sorry, I don't really understand your question. Perhaps if you told me what you're trying to accomplish?
I try to describe my idea as the following clearly. But I really don't know if it will work. Please give me some advice if possible.
According to the credit scheduler in Xen, a vCPU can run a 30ms timeslice when it is scheduled on the physical CPU. And, a vCPU with the BOOST priority will preempt the running one and run additional 10ms. So, what I think is if we monitor the physical CPU every 10ms and we can get the mapping information of a physical CPU and a vCPU. And also, we can get the un-mapping information that a physical CPU isn’t mapped to any vCPU. Thus, we can get the CPU usage by calculating the proportion of the mapping information to the total time when we monitored.
For example, if we monitor the physical CPUs every 10ms and we can get 100 pairs of pCPU and vCPU in a second, such as (
pCPU_id,vCPU_id). If there is 60 mapping pairs that the pCPU is mapped to a valid vPCU, and 40 un-mapping pairs that we cannot find the pCPU to be mapped a valid vCPU. So, we can get the usage of the physical CPUs that is 60%.Here, we monitor the physical CPUs every 10ms. We also can monitor them once less than the 10ms interval, such as 1ms interval. Whatever interval we choose, we must make sure no CPU content switch in the interval or the context switch always occur at the edge of interval. Only in this condition, can this idea work.
Quoted 3 lines
So, I am not sure whether we can find such a time interval that can meet this condition. In other words, whether we can find such a time interval that ensures all the CPU content switch occur at the edge of interval.
You still haven't described exactly what it is you're trying to
accomplish: what is your end goal? It seems to be related somehow to measuring how busy the system is (i.e., the number of active pcpus and idle pcpus); but as I don't know what you want to do with that information, I can't tell you the best way to get it.
Regarding a map of pcpus to vcpus, that already exists. The scheduling code will keep track of the currently running vcpu here:
per_cpu(schedule_data, pcpu_id).curr
You can see examples of the above structure used in xen/common/sched_credit2.c. If "is_idle(per_cpu(schedule_data, pcpu).curr)" is false, then the cpu is running a vcpu; if it is true, then the pcpu is idle (although it may be running a tasklet).
Additionally, if all you want is the number of non-idle cpus, the credit1 scheduler keeps track of the idle and non-idle cpus in prv->idlers. You could easily use "cpumask_weight(&prv->idlers)" to find out how many idle cpus there are at any given time. If you know how many online cpus there are, that will give you the busy-ness of the system.
So now that you have this instantaneous percentage, what do you want to do with it?
-George
Quoted 118 lines · George Dunlap
2011/12/17 gavin <[email protected]>:
Quoted 52 lines
At 2011-12-16 23:58:26,"George Dunlap" <[email protected]
Quoted 2 lines · wrote:
2011/12/16 gavin <[email protected]>:
Quoted 1 line
At 2011-12-16 19:04:19,"George Dunlap" <[email protected]
Quoted 45 lines · wrote:
Quoted 30 lines
Quoted 22 lines
2011/12/16 zhikai <[email protected]>:
Quoted 5 lines
Hi All,
In the credit scheduler, the scheduling decision function
csched_schedule()Quoted 7 lines
is called in the schedule function in
scheduler.c, such as the following.next_slice=sched->do_schedule(sched, now, tasklet_work_scheduled);But, how often the
csched_schedule()is called and to run? Does thisfrequency have something to do with the slice of credit scheduler that is 30ms?
The scheduler runs whenever the
SCHEDULE_SOFTIRQis raised. If you grep through the source code fro that string, you can find all the places where it's raised.Some examples include:
* When the 30ms timeslice is finishedQuoted 7 lines
* When a sleeping vcpu of higher priority than what's currently running wakes up
* When a vcpu blocks
* When a vcpu is migrated from one cpu to another30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Quoted 5 lines
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the
SCHEDULE_SOFTIRQis raised.It depends; if you have a cpu-burning vcpu running on a cpu all by itself, then after its 30ms timeslice, Xen will have no one else to run, and so will let it run again.
But yes, if there are other vcpus on the runqueue, or the host is moderately busy, it's likely that
SCHEDULE_SOFTIRQwill cause a context-switch.Quoted 1 line
And we cannot find a small timeslice, such as a(ms), which makes the
Quoted 7 lines
Quoted 5 lines
Quoted 2 lines
time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
I'm sorry, I don't really understand your question. Perhaps if you told me what you're trying to accomplish?
I try to describe my idea as the following clearly. But I really don't
know
Quoted 7 lines
if it will work. Please give me some advice if possible.
According to the credit scheduler in Xen, a vCPU can run a 30ms timeslice when it is scheduled on the physical CPU. And, a vCPU with the BOOST priority will preempt the running one and run additional 10ms. So, what I think is if we monitor the physical CPU every 10ms and we can get the mapping information of a physical CPU and a vCPU. And also, we can get
the
Quoted 1 line
un-mapping information that a physical CPU isn’t mapped to any vCPU.
Thus,
Quoted 4 lines
we can get the CPU usage by calculating the proportion of the mapping information to the total time when we monitored.
For example, if we monitor the physical CPUs every 10ms and we can get
100
Quoted 1 line
pairs of pCPU and vCPU in a second, such as (
pCPU_id,vCPU_id). If thereis
Quoted 1 line
60 mapping pairs that the pCPU is mapped to a valid vPCU, and 40
un-mapping
Quoted 1 line
pairs that we cannot find the pCPU to be mapped a valid vCPU. So, we can
get
Quoted 3 lines
the usage of the physical CPUs that is 60%.
Here, we monitor the physical CPUs every 10ms. We also can monitor them
once
Quoted 3 lines
less than the 10ms interval, such as 1ms interval. Whatever interval we choose, we must make sure no CPU content switch in the interval or the context switch always occur at the edge of interval. Only in this
condition,
Quoted 5 lines
can this idea work.
So, I am not sure whether we can find such a time interval that can meet this condition. In other words, whether we can find such a time interval that ensures all the CPU content switch occur at the edge of interval.
You still haven't described exactly what it is you're trying to
accomplish: what is your end goal? It seems to be related somehow to measuring how busy the system is (i.e., the number of active pcpus and idle pcpus); but as I don't know what you want to do with that information, I can't tell you the best way to get it.Regarding a map of pcpus to vcpus, that already exists. The scheduling code will keep track of the currently running vcpu here:
per_cpu(schedule_data, pcpu_id).currYou can see examples of the above structure used in
xen/common/sched_credit2.c. If "is_idle(per_cpu(schedule_data, pcpu).curr)" is false, then the cpu is running a vcpu; if it is true, then the pcpu is idle (although it may be running a tasklet).Additionally, if all you want is the number of non-idle cpus, the credit1 scheduler keeps track of the idle and non-idle cpus in
prv->idlers. You could easily use "cpumask_weight(&prv->idlers)" to find out how many idle cpus there are at any given time. If you know how many online cpus there are, that will give you the busy-ness of the system.
Quoted 4 lines
So now that you have this instantaneous percentage, what do you want to do with it?
A tangential question:
When you pin a pcpu to a vcpu (e.g. xm vcpu-pin 0 0 0), are the soft irqs
for that cpu still raised ? (Lets assume for the sake of simplicity that there
are 2 cpus in the system and 2 domains - a dom0 and a domU, each pinned to one CPU).
Do the vcpu pauses (and subsequent resumes with no context switch etc)
still happen due to the irqs or the scheduler code? Or will the scheduler be effectively disabled in this scenario ?
shriram
-George
Quoted 6 lines
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
1) My original goal is to calculate the usage percentage of CPU in a different way from other tools, such as xentrace.
Because the aim of all the scheduling is to map the vCPU to pCPU, we can get a mapping sequence of pCPU and vCPU by monitoring the pCPU in a fixed interval.
For example, if the SCHEDULE_SOFTIRQ is just raised when the timeslice is finished, the vCPU runs as described in the figure 1 (two pCPU and three vCPU). We monitor all the CPUs once every time t, which is equal to the time of the timeslice here. In ten timeslice (maybe 0.3 second in credit1), we can get the mapping sequence, which contains 20 (pCPU, vCPU) pairs as the following.
(pCPU1, vCPU1), (pCPU2, vCPU2), (pCPU1, vCPU1), (pCPU2, non), (pCPU1, vCPU1), (pCPU2, vCPU3), (pCPU1, vCPU2), (pCPU2, non), (pCPU1, non), (pCPU2, vCPU2), (pCPU1, vCPU3), (pCPU2, non), (pCPU1, vCPU3), (pCPU2, vCPU1), (pCPU1, non), (pCPU2, vCPU1), (pCPU1, vCPU1), (pCPU2, non), (pCPU1, non), (pCPU2, vCPU2)。
If there is no vCPU mapped on the pCPU, we use (pCPU*, non) pair, which means the pCPU is idle. In the above sequence, there are 7 idle pairs in total.
So, from the above mapping sequence, we can calculate the usage percentage of the CPU in ten timeslcie (0.3 sencond).
Usage Percentage = (20-7)/20 = 65%
2) If we can get such a mapping sequence of pCPU and vCPU, besides calculating the usage percentage of CPU, maybe we also can find somelaws of the mapping sequence and use the laws to infer the CPU-bound task and I/O-bound task.
However, this idea may not work. Because the SCHEDULE_SOFTIRQ is not only raised when the timeslice is finished, but also raised in many other situations, we cannot get a regular mapping of vCPU and pCPU just like figure 1. The mapping is irregular possibly shown in figure 2. In the figure 2, we cannot find a very proper time t to monitor the CPUs.
--
Best Regards,
Gavin
Quoted 104 lines · At 2011-12-19 18:37:14,"George Dunlap" <[email protected]> wrote:
2011/12/17 gavin <[email protected]>:
Quoted 74 lines
Quoted 41 lines · At 2011-12-16 23:58:26,"George Dunlap" <[email protected]> wrote:
2011/12/16 gavin <[email protected]>:
Quoted 23 lines
Quoted 21 lines · At 2011-12-16 19:04:19,"George Dunlap" <[email protected]> wrote:
2011/12/16 zhikai <[email protected]>:
Quoted 9 lines
Hi All,
In the credit scheduler, the scheduling decision function
csched_schedule()is called in the schedule function inscheduler.c, such as the following.next_slice=sched->do_schedule(sched, now, tasklet_work_scheduled);But, how often the
csched_schedule()is called and to run? Does this frequency have something to do with the slice of credit scheduler that is 30ms?The scheduler runs whenever the
SCHEDULE_SOFTIRQis raised. If you grep through the source code fro that string, you can find all the places where it's raised.Some examples include:
* When the 30ms timeslice is finished
* When a sleeping vcpu of higher priority than what's currently running wakes up
* When a vcpu blocks
* When a vcpu is migrated from one cpu to anotherQuoted 8 lines
Quoted 3 lines
30ms is actually a pretty long time; in typical workloads, vcpus block or are preempted by other waking vcpus without using up their full timeslice.
Thank you very much for your reply.
So, the vcpu is very likely to be preempted whenever the
SCHEDULE_SOFTIRQis raised.It depends; if you have a cpu-burning vcpu running on a cpu all by itself, then after its 30ms timeslice, Xen will have no one else to run, and so will let it run again.
But yes, if there are other vcpus on the runqueue, or the host is moderately busy, it's likely that
SCHEDULE_SOFTIRQwill cause a context-switch.Quoted 6 lines
Quoted 3 lines
And we cannot find a small timeslice, such as a(ms), which makes the time any vcpu spending on running phase is k*a(ms), k is integer here. There is no such a small timeslice. Is it right?
I'm sorry, I don't really understand your question. Perhaps if you told me what you're trying to accomplish?
I try to describe my idea as the following clearly. But I really don't know if it will work. Please give me some advice if possible.
According to the credit scheduler in Xen, a vCPU can run a 30ms timeslice when it is scheduled on the physical CPU. And, a vCPU with the BOOST priority will preempt the running one and run additional 10ms. So, what I think is if we monitor the physical CPU every 10ms and we can get the mapping information of a physical CPU and a vCPU. And also, we can get the un-mapping information that a physical CPU isn’t mapped to any vCPU. Thus, we can get the CPU usage by calculating the proportion of the mapping information to the total time when we monitored.
For example, if we monitor the physical CPUs every 10ms and we can get 100 pairs of pCPU and vCPU in a second, such as (
pCPU_id,vCPU_id). If there is 60 mapping pairs that the pCPU is mapped to a valid vPCU, and 40 un-mapping pairs that we cannot find the pCPU to be mapped a valid vCPU. So, we can get the usage of the physical CPUs that is 60%.Here, we monitor the physical CPUs every 10ms. We also can monitor them once less than the 10ms interval, such as 1ms interval. Whatever interval we choose, we must make sure no CPU content switch in the interval or the context switch always occur at the edge of interval. Only in this condition, can this idea work.
Quoted 3 lines
So, I am not sure whether we can find such a time interval that can meet this condition. In other words, whether we can find such a time interval that ensures all the CPU content switch occur at the edge of interval.
You still haven't described exactly what it is you're trying to
accomplish: what is your end goal? It seems to be related somehow to measuring how busy the system is (i.e., the number of active pcpus and idle pcpus); but as I don't know what you want to do with that information, I can't tell you the best way to get it.Regarding a map of pcpus to vcpus, that already exists. The scheduling code will keep track of the currently running vcpu here:
per_cpu(schedule_data, pcpu_id).currYou can see examples of the above structure used in
xen/common/sched_credit2.c. If "is_idle(per_cpu(schedule_data, pcpu).curr)" is false, then the cpu is running a vcpu; if it is true, then the pcpu is idle (although it may be running a tasklet).Additionally, if all you want is the number of non-idle cpus, the credit1 scheduler keeps track of the idle and non-idle cpus in
prv->idlers. You could easily use "cpumask_weight(&prv->idlers)" to find out how many idle cpus there are at any given time. If you know how many online cpus there are, that will give you the busy-ness of the system.So now that you have this instantaneous percentage, what do you want to do with it?
Quoted 6 lines
-George
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel
Hi George,
I have another question about the credit2 scheduling.
In a shared cache multi-core system, such as two processors (processor 0 and processor 1), there are two CPU cores in each processor. It seems that the credit scheduling treat all the four cores the same and doesn't distinguish them.
However, I am not sure whether the credit2 scheduling distinguishs them from each other? Maybe the four cores can be divided into two groups. The two cores on the same processor are in the same group. I noted there is development of CPU topology in the To-do list on the credit2 Xen wiki page, but there is no details about the current situation of credit2 scheduling.
--
Best Regards,
Gavin
_______________________________________________
Xen-devel mailing list
[email protected]
http://lists.xensource.com/xen-devel