Scheduling with Hyperthreading
Sorry, should have been more specific. I am referring to the scheduler. I have noticed that if I run two compute intensive jobs on a Dual Xeon, the processes run on separate physical cpus and can spend a significant amount of time with both on a single cpu. I have seen some patches that try to improve on this and was wondering if they have made it into the production kernel stream. I ran tests on a 2.4.20 kernel and it had the same problem as a 2.4.18 kernel.
Thanks
Mike
Quoted 30 lines · William Lee Irwin III
Quoted 4 lines · Mike Sullivan
Quoted 4 lines
What kernel versions will attempt to distribute jobs across physical CPUs on Xeon SMP configurations.
Quoted 9 lines · James Bourne
From what I've heard, Arjans' user space daemon might be the way things are going, it's at http://people.redhat.com/arjanv/irqbalance/ . The other way that you might try is the irq load balance patch that Ingo produced. There is a patch that is from 2.4.20 at
http://www.hardrock.org/kernel/2.4.20/ and it is what I'm using at work on our current Xeon systems (until I have the chance to test the user space daemon at least).I think he's referring to the cpu scheduler, not interrupt load balancing. mingo might have some insight into current patches for this and current results thereof. I don't really participate in the scheduler aside from very occasional bugfixing.
-- wli
Signature · 6 lines
---------------------------------------------------------------------- Mike Sullivan Director Performance Computing @lliance Technologies, Voice: (416) 385-3255, 18 Wynford Dr, Suite 407 Fax: (416) 385-1774 Toronto, ON, Canada, M3C-3S2 Toll Free:1-877-216-3199 http://www.alltec.com