Skip to contentSkip to conversation

public roadmap/todo list (was: ns vs. tsc as internal timer base)

Xenomai-core Jan Kiszka 1 participant 1 message Jun 13, 2006

lore
Share & tools
lore

Jan Kiszka

author
#0 lore raw
Quoted 7 lines · Philippe Gerum
Quoted 3 lines · Jan Kiszka

:) We should coordinate better.

The answer is published roadmap + todo list, but this requires some organisation we have not been able to setup yet.

Indeed.

I think this is first of all a technical issue: lowering the convenience barrier for entering/updating stuff within the team. Spontaneously, I have two options in mind:

- existing bug/feature tracking system on gna.org
- non-existent wiki with one or more dedicated pages about this, following some loose convention on the item structure

Any other suggestions? Any preferences? How to proceed?

Jan