Interoperability ambitions
Yes - and having this "stop the client" principle will make for something that can be used in future upgrade scenarios as well.
Note that I have copied lustre-devel as this is of general interest.
Peter
Quoted 91 lines · Huang Hua
Hello All,
This is what I propose (it is mentioned in the revised HLD: see bug 11824, but I'd like to enhance it as followings)
--------------------------------
Upgrade is a special fail-over, invoked and controlled by administrator. We can try to make the whole lustre into a ``Quiescent'' state and block any update operations.
This is something similar while we take a snapshot for a file system. Clients block any incoming update operations (maybe all operations exceptsys_statfs()) and sync all pending operations. By this, all transactions on client side and server side are committed. There are only some ``open'' requests in the replay queue. These open requests are already committed on server side. They are still in replay queue because the files are not closed yet.In this "Quiescent" state, all read-only operations, such as getattr, lookup, statfs can pass through.
Maybe onlystatfs()can pass through. Wire protocol forstatfs()does not change from 1.8 to 2.0.
And this enables users can execute "df" command in this state.This idea is similar to
super_operation->write_super_lockfs()in local file system.By this mechanism, we can avoid reformatting for all requests except open+create enqueue.
Since the open+create enqueue itself is committed by server at the time of upgrade, the server only need to open the newly created file. The new file, created by 1.8 MDS server, can be opened by 2.0 MDS server while replay.The clients will leave this "Quiescent" state while the upgrade is done.
This will tremendously simplify the upgrade.
Especially the reformatting of all resend/replay/delayed request, and then handle replay case in upgrade case, and
test all possible upgrade cases.
--------------------------------What's your comment?
Thanks,
Huang HuaQuoted 40 lines · Andreas Dilger
Quoted 12 lines · Peter J. Braam
I understood from Huang Hua that a considerable degree of perfection is being pursued with the interoperability of 1.8 clients and 1.8/2.0 servers.
In particular I was quite worried when I heard what Huang Hua has been asked to do. It seems excessive to me to make replay/resend/version recovery all work in a failover situation from 1.8 to 2.0. This requires incredibly detailed testing of every RPC that might be rolled back or in transit across such an upgrade, something that is not too easy to automate I think. Quite apart from this, it might not be transparent to user applications if during 1.8(client)-2.0(server) the same fids are not allocated to the client (I am not sure if this would be the case).
Minor note - IGIF will ensure that client-visible identifiers remain the same over a 1.8->2.0 upgrade. This will NOT be true in the case of a 2.0->1.8 downgrade (which will require client eviction), but that should only happen if there are already serious problems with 2.0.
Quoted 11 lines
It would be much better, to dramatically reduce the hassles with protocol interoperability, to have a mechanism to tell a client to wait for completion of its requests and block new ones while the server failover is in progress. This would be organized through the configuration lock. This would lead to a situation where no state in the protocol needs to be recovered.
Why is this not being pursued?
Peter
Cheers, Andreas
--
Andreas Dilger
Sr. Staff Engineer, Lustre Group
Sun Microsystems of Canada, Inc.