Folks,

As we get ready for M3 opening up shortly, I wanted to get folks aware of where we are with M2 and the recipe updating process. Based on my rough reckoning, we had about 266 recipes that needed updating at the start of M2, we updated about 110 (possibly more). There are now about 160 recipes in the update list that need tackling.

Also, the distro tracking data for Version information is getting stale, there are about 135 RECIPE_LATEST_VERSION metadata tags that need to be updated.

I have attached a spreadsheet that shows the update status of both the upstream (RMatch Column) and tracking data (TMatch Column).

I would like to see the team and community pitch in and complete these 160 recipe updates for the 1.0 Release. Please be sure the ownership / RECIPE_MAINTAINER information is correct.

IMPORTANT: Please use distro/stage in poky-contrib to update the distro_tracking_fields.inc file, I have many updates in that already, I will do my best not to rebase that until we get it updated.

The attached spread sheet contains 3 Sheets, please review the 2nd and 3rd sheets (Labeled Tracking Updates and Recipe Updates respectively).

Thanks.

Signature · 5 lines
    Sau!

Saul Wold
Yocto Component Wrangler @ Intel
Yocto Project / Poky Build System
#1 lore raw
Quoted 15 lines

From: Saul Wold
Sent: Thursday, December 16, 2010 8:58 AM

Folks,

As we get ready for M3 opening up shortly, I wanted to get folks aware of where we are with M2 and the recipe updating process. Based on my rough reckoning, we had about 266 recipes that needed updating at the start of M2, we updated about 110 (possibly more). There are now about 160 recipes in the update list that need tackling.

Also, the distro tracking data for Version information is getting stale, there are about 135 RECIPE_LATEST_VERSION metadata tags that need to be updated.

Quoted 7 lines

I have attached a spreadsheet that shows the update status of both the upstream (RMatch Column) and tracking data (TMatch Column).

I would like to see the team and community pitch in and complete these 160 recipe updates for the 1.0 Release. Please be sure the ownership / RECIPE_MAINTAINER information is correct.

I'm kind of surprised when seeing this data, as I thought we have upgraded more than 110 recipes. Then distro team gathered just now to understand whether there's anything mismatch. The major point causing confusion is that the code generating above sheet is stateless, which doesn't track historical data while there do have many packages releasing new versions just in M2 window. This then moves some packages we do upgrade into the '160' group. Basically we think those items with small version difference fall into this category. So it's not that bad as I originally thought. :-)

Ke is collecting some data and will reply later to clarify in 160 recieps:
- what have been upgraded in M2 window already, and
- what have not been touched at all

With that data we'll see how much work remains in M3 for this task.

On the other hand, along with this I realize that there's one area we need further discuss. How often should we upgrade packages in a given release cycle? MeeGo only does once. For Yocto we want to keep our recipes in cutting-edge which is why we schedule two upgrade windows in M2 and M3 this time. The policy for each recipe however could be a bit different:

- M2 is our 1st upgrade window, within which we try to upgrade as many
recipes as possible to avoid rush push in last release point. The order is done by:
* first upgrade small version changes in a batch which normally implicates
those recipes have been touched in previous release cycle and thus small risk
* then upgrade the rest recipes which may need more debug time
because they may not been touched for some time or at all

- M3 (now) is our 2nd upgrade window, within which we try to ensure our
final release in cutting-edge. Then I suggest a reverse order:
* first upgrade recipes which haven't been covered in M2, which implicates
more work required and higher risk
* then upgrade small version changes at end of the window. This way
can ensure catching latest version or else we may need to do it multiple times if doing it too early. This has small risk

So in generally I propose to have a longer window for recipes which have been upgraded and got a new version now. For now we can have distro team focusing on those recipes which haven't been touched yet.

Does it sound OK?

----

BTW, I think our package report system (in experimental phase now) can help the upgrade decision clearly. A suggested flow will be:

The server checks upstream version every day or every several days. When there's a new version newly released, a mail will be sent to the recipe owner and CC this list.

The owner then need react to the notification:
- verify whether this is a valid message
- decide whether a upgrade is required. The reason for non-upgrade could be:
* pure SCM commit (for SCM check we may need more thinking)
* an unstable release
* known critical bugs/security holes
* not worthy of upgrade effort since no new features are introduced
* ...
- mark decision on the package report system
* to-be-upgraded
* not upgrade (if so, reason). If we still use RECIPE_NO_UPDATE_REASON,
then a patch may be required to update that field

The package report system will record all the historical versions and decisions, to avoid trigger unnecessary messages again.

When a upgrade window starts and ends, we can then use above stateful data to draw overall picture and track our progress accurately.

Comments?

Thanks
Kevin

#2 lore raw
Quoted 4 lines · Kevin

On the other hand, along with this I realize that there's one area we need further discuss. How often should we upgrade packages in a given release cycle? MeeGo only does once. For Yocto we want to keep our recipes in cutting-edge which is why we schedule two upgrade windows in M2 and M3 this time.

I'd like to question this. Is the goal for Poky/Yocto to track the bleeding-edge releases of software, or is the goal to be a well-tested and stable foundation for embedded software applications?

Upgrading a recipe within a couple of weeks of its release may end up using more of our resources if/when we encounter new bugs that were introduced in the new release. Or worse, if we don't encounter them during distro builds and then our users take our release and discover them for themselves.

I'm not saying we need to be as conservative as long-term-support enterprise Linux distros, but IMHO I think racing to always upgrade our recipes to versions released a handful of weeks ago can be counterproductive in many situations.

A policy I might put forward for consideration is this: recipe upgrades are done once per release cycle, and upstream versions that have come out within the last 30 days should not be upgraded unless we have a really good reason for doing so.

Scott

Signature · 2 lines
Scott Garman
Embedded Linux Distro Engineer - Yocto Project
#3 lore raw
Quoted 4 lines

From: Garman, Scott A
Sent: Friday, December 17, 2010 5:57 AM

On 12/15/2010 06:40 PM, Tian, Kevin wrote:

Quoted 8 lines
Quoted 4 lines

On the other hand, along with this I realize that there's one area we need further discuss. How often should we upgrade packages in a given release cycle? MeeGo only does once. For Yocto we want to keep our recipes in cutting-edge which is why we schedule two upgrade windows in M2 and M3 this time.

I'd like to question this. Is the goal for Poky/Yocto to track the bleeding-edge releases of software, or is the goal to be a well-tested and stable foundation for embedded software applications?

I think the both. :-)

Quoted 6 lines

Upgrading a recipe within a couple of weeks of its release may end up using more of our resources if/when we encounter new bugs that were introduced in the new release. Or worse, if we don't encounter them during distro builds and then our users take our release and discover them for themselves.

This is always being a tradeoff in all distributions. There's no simple guideline whether there's severe risk to upgrade to a latest release, and I think the one general rule is to pick up a newer release with enough stability. How to judge that? This finally goes to the owner of each recipe.

Quoted 11 lines

I'm not saying we need to be as conservative as long-term-support enterprise Linux distros, but IMHO I think racing to always upgrade our recipes to versions released a handful of weeks ago can be counterproductive in many situations.

A policy I might put forward for consideration is this: recipe upgrades are done once per release cycle, and upstream versions that have come out within the last 30 days should not be upgraded unless we have a really good reason for doing so.

I think there's no simple guideline meaningful in general context like this. All the decisions should come to the actual recipe maintainer, based on his knowledge in this specific area. Once we involve with upstream more closely, we should be able to tell whether a new release is worthy to go or not in most cases.

Besides that, what in general we can do is about the process.

That's why we come up a two phase upgrade windows in 1.0. With the first window as the major upgrade, and the 2nd window to catch up minor version changes which should be with little risk. If there's important release coming out in 2nd window, we (again mainly the recipe owner) again need to make decision instead of a simple global rule "to go" or "not to go". As I raised in early thread, I suggest to those minor version upgrade in later of 2nd window.

That's also why we're currently developing the package reporting system, which is expected to check upstream release periodically and once a new release coming out the maintainer gets notified to make decision.

So in a nutshell:
- the general goal is to being cutting-edge
- we work out a process which give recipe maintainers enough opportunities
to check new releases of packages they own, toward our 'cutting-edge' goal
- Saul generates a general candidate list from those info in start of each
upgrade window
- then it's always recipe maintainers to make decision whether a new release
should go or not, based on its stability, new features and risks given time to Yocto release point. If there's a decision not to upgrade, the maintainer should document it well

Having said that so far our process is not exactly as expected yet, and our expertise on each area still need time. But I think that's the what we'll need to be. :-)

Thanks
Kevin

#4 lore raw
In reply to Saul Wold

Thanks Saul for working out this list.

I am a bit surprised on the large number of to-be-upgraded list: 160, because according to our plan, we actually upgrade most of the recipes in M2, and only a small number of recipes are supposed to be left for M3. To find out the reason why, PRC team collect some data to analysis, and here is the result:

Among the 160, PRC team (Dexuan, Dongxiao, Edwin, Ke, Qing) owns 105 recipes. the 105 recipes can be grouped into 3 cases:
Case A: the recipe is not planned to upgrade in M2, mostly due to that it is up-to-update in M2 planning time, and later has new version available. Case B: the recipe is planned to upgrade in M2, but not upgrade and leave it to M3
Case C: the recipe is planned to upgrade in M2, and it is upgraded in M2, but later has new version available.

According to our data collection, Case A has 31 recipes, Case B has 21 recipes, Case C has 53 recipes. In other word, in M2 time, we leave 21 recipes (Case B) for M3, but due to new version available after the planning, there are extra 84 recipes (case A + case C) added to be upgraded. Even only count Case C, we can see almost 50% ofM3 to-be-upgraded recipes are already upgraded in M2. This is probably one area we can improved in the future.

Regards
Ke

Quoted 41 lines

-----Original Message-----
From: [email protected] [mailto:poky- [email protected]] On Behalf Of Saul Wold
Sent: Thursday, December 16, 2010 8:58 AM
To: Yocto Project Discussion; [email protected]
Subject: [poky] Recipe Updating Status and call to action

Folks,

As we get ready for M3 opening up shortly, I wanted to get folks aware of where we are with M2 and the recipe updating process. Based on my rough reckoning, we had about 266 recipes that needed updating at the start of M2, we updated about 110 (possibly more). There are now about 160 recipes in the update list that need tackling.

Also, the distro tracking data for Version information is getting stale, there are about 135 RECIPE_LATEST_VERSION metadata tags that need to be updated.

I have attached a spreadsheet that shows the update status of both the upstream (RMatch Column) and tracking data (TMatch Column).

I would like to see the team and community pitch in and complete these 160 recipe updates for the 1.0 Release. Please be sure the ownership / RECIPE_MAINTAINER information is correct.

IMPORTANT: Please use distro/stage in poky-contrib to update the distro_tracking_fields.inc file, I have many updates in that already, I will do my best not to rebase that until we get it updated.

The attached spread sheet contains 3 Sheets, please review the 2nd and 3rd sheets (Labeled Tracking Updates and Recipe Updates respectively).

Thanks.

--
Sau!

Saul Wold
Yocto Component Wrangler @ Intel
Yocto Project / Poky Build System

author
#5 lore raw
Quoted 4 lines · Ke

Thanks Saul for working out this list.

I am a bit surprised on the large number of to-be-upgraded list: 160, because according to our plan, we actually upgrade most of the recipes in M2, and only a small number of recipes are supposed to be left for M3. To find out the reason why, PRC team collect some data to analysis, and here is the result:

I am sorry I gave everyone a scare with my numbers, as Kevin points out, currently this information is stateless, I am going my best to gather the information that I have at hand

Quoted 4 lines

Among the 160, PRC team (Dexuan, Dongxiao, Edwin, Ke, Qing) owns 105 recipes. the 105 recipes can be grouped into 3 cases:
Case A: the recipe is not planned to upgrade in M2, mostly due to that it is up-to-update in M2 planning time, and later has new version available. Case B: the recipe is planned to upgrade in M2, but not upgrade and leave it to M3
Case C: the recipe is planned to upgrade in M2, and it is upgraded in M2, but later has new version available.

Can you send me a list of the Case C recipes, I would like to review if we need to update all of them. As I said in the past some of these may be the Xserver and libraries which we do want to update since we went to an RC release first.

Sau!

Quoted 3 lines

According to our data collection, Case A has 31 recipes, Case B has 21 recipes, Case C has 53 recipes. In other word, in M2 time, we leave 21 recipes (Case B) for M3, but due to new version available after the planning, there are extra 84 recipes (case A + case C) added to be upgraded. Even only count Case C, we can see almost 50% ofM3 to-be-upgraded recipes are already upgraded in M2. This is probably one area we can improved in the future.

Thanks

Quoted 46 lines

Regards
Ke

Quoted 41 lines

-----Original Message-----
From: [email protected] [mailto:poky- [email protected]] On Behalf Of Saul Wold
Sent: Thursday, December 16, 2010 8:58 AM
To: Yocto Project Discussion; [email protected]
Subject: [poky] Recipe Updating Status and call to action

Folks,

As we get ready for M3 opening up shortly, I wanted to get folks aware of where we are with M2 and the recipe updating process. Based on my rough reckoning, we had about 266 recipes that needed updating at the start of M2, we updated about 110 (possibly more). There are now about 160 recipes in the update list that need tackling.

Also, the distro tracking data for Version information is getting stale, there are about 135 RECIPE_LATEST_VERSION metadata tags that need to be updated.

I have attached a spreadsheet that shows the update status of both the upstream (RMatch Column) and tracking data (TMatch Column).

I would like to see the team and community pitch in and complete these 160 recipe updates for the 1.0 Release. Please be sure the ownership / RECIPE_MAINTAINER information is correct.

IMPORTANT: Please use distro/stage in poky-contrib to update the distro_tracking_fields.inc file, I have many updates in that already, I will do my best not to rebase that until we get it updated.

The attached spread sheet contains 3 Sheets, please review the 2nd and 3rd sheets (Labeled Tracking Updates and Recipe Updates respectively).

Thanks.

--
Sau!

Saul Wold
Yocto Component Wrangler @ Intel
Yocto Project / Poky Build System

#6 lore raw
Quoted 7 lines

-----Original Message-----
From: Saul Wold [mailto:[email protected]]
Sent: Friday, December 17, 2010 7:19 AM
To: Yu, Ke
Cc: Yocto Project Discussion
Subject: Re: [poky] Recipe Updating Status and call to action

Quoted 7 lines

Can you send me a list of the Case C recipes, I would like to review if we need to update all of them. As I said in the past some of these may be the Xserver and libraries which we do want to update since we went to an RC release first.

Sau!

Sure. Please find the attached file for the list. Thanks.

Regards
Ke

netbase
mtd-utils
pulseaudio
gstreamer
gst-plugins-base
libogg
ofono
connman
gst-plugins-good
bluez4
glib-2.0
telepathy-idle
telepathy-mission-control
telepathy-glib
libgsmd
Tremor
xproto
lttng-viewer
liburcu
ltt-control
lttng-ust
scrnsaverproto
liberation-fonts
pixman
librsvg
libgpg-error
puzzles
libsoup-2.4
gnome-desktop
gtk-engines
gnome-keyring
gtk+
apr
apr-util
webkit-gtk
eds-dbus
shared-mime-info
Libtasn1
Libxml2
Boost
Util-linux
libzypp
zypper
sat-sover
update-rc.d
yaffs2-utils
xf86-video-omapfb
xf86-video-intel
xf86-input-evdev
xf86-input-vmmouse
xwininfo
qemugl