Given the frequency of schedule() calling, there is a margin to improve it. In step of recalculate task priority, it first dequeues from one priority queue, calls recalc_task_prio(), then enqueue the task into another priority queue. However, statistics shows only around 0.5% of recalculation changed task priority (see below). While rest of 99.5% of recalculation do not change priority, it is reasonably to use requeue_task() to avoid overhead of dequeue and enqueue on the same priority queue.
The patch is implemented with above idea. Note, a new help function, change_queue_task(), to combine dequeue() and enqueue() to reduce one function call overhead. Two statistics fields, sched_prio_changed and sched_prio_unchanged, are added to provide statistic data on priority recalculation.
Thanks,
/*===== Statistics ===== */
The statistics is based on Intel x86 machine with 2 Xeon 1.8G processors with hyperthreading enable.
Prio_unchanged prio_changed sched_cnt
CPU0 109 22743 59123 CPU1 120 23733 60407
CPU2 73 29981 86153 CPU3 96 22050 53094
/*===== Patch <linux-2.6.11.10> kernel/sched.c =====*/
kernel/sched.c +40 -8
@@ -249,6 +249,8 @@unsigned long sched_noswitch;unsigned long sched_switch;unsigned long sched_cnt; +unsigned long sched_prio_changed; +unsigned long sched_prio_unchanged;unsigned long sched_goidle;/* pull_task() stats */
@@ -347,12 +349,20 @@/* runqueue-specific stats */ seq_printf(seq, - "cpu%d %lu %lu %lu %lu %lu %lu %lu %lu %lu %lu %lu %lu " - "%lu %lu %lu %lu %lu %lu %lu %lu %lu %lu", + "cpu%d \n\tyld: both(%lu) act(%lu) both(%lu) cnt(%lu) " + "\n\tsched: noswitch(%lu) switch(%lu) " + "\n\t\t cnt(%lu) prio_changed(%lu) prio_unchanged(%lu)" + "\n\t\t goidle(%lu) " + "\n\talb: cnt(%lu) gained(%lu) lost(%lu) failed(%lu) " + "\n\tttwu:cnt(%lu) moved(%lu) attempts(%lu) " + "\n\twunt: cnt(%lu) moved(%lu) " + "\n\tsmt: cnt(%lu) \n\tsbe: cnt(%lu) " + "\n\trq_sched_info: cpu_time(%lu) run_delay(%lu) pcnt(%lu)", cpu, rq->yld_both_empty, rq->yld_act_empty, rq->yld_exp_empty, rq->yld_cnt, rq->sched_noswitch, - rq->sched_switch, rq->sched_cnt, rq->sched_goidle, + rq->sched_switch, rq->sched_cnt, rq->sched_prio_changed, + rq->sched_prio_unchanged, rq->sched_goidle, rq->alb_cnt, rq->alb_gained, rq->alb_lost, rq->alb_failed, rq->ttwu_cnt, rq->ttwu_moved, rq->ttwu_attempts,
@@ -374,14 +384,14 @@seq_printf (seq,"domain%d %s" , dcnt++, mask_str);for (itype =SCHED_IDLE ; itype <MAX_IDLE_TYPES ; itype++) { -seq_printf (seq," %lu %lu %lu %lu %lu" , +seq_printf (seq,"lb: cnt(%lu) failed(%lu) imbl(%lu) nobzq(%lu) %lu" , sd->lb_cnt[itype], sd->lb_failed[itype], sd->lb_imbalance[itype], sd->lb_nobusyq[itype], sd->lb_nobusyg[itype]); } -seq_printf (seq," %lu %lu %lu %lu\n" , +seq_printf (seq,"sbe: pushed(%lu) attempts(%lu) %lu %lu\n" , sd->sbe_pushed, sd->sbe_attempts, sd->ttwu_wake_affine, sd->ttwu_wake_balance); }
@@ -580,6 +590,18 @@ p->array = array; } +static void change_queue_task (struct task_struct *p,prio_array_t *array, +int old_prio) +{ +list_del (&p->run_list); +if (list_empty (array->queue + old_prio)) +__clear_bit (old_prio, array->bitmap); + +sched_info_queued (p); +list_add_tail (&p->run_list, array->queue + p->prio); +__set_bit (p->prio, array->bitmap); + p->array = array; +}/* * Put task to the end of the run list without the overhead of dequeue * followed by enqueue.
@@ -2668,7 +2690,7 @@struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, prio;/* * Test if we are atomic. Since do_exit() needs to call into
@@ -2787,9 +2809,19 @@ delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); + prio = next->prio;recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + +if (unlikely (prio != next->prio)) + { +change_queue_task (next, array, prio); +schedstat_inc (rq, sched_prio_changed); + } +else + { +requeue_task (next, array); +schedstat_inc (rq, sched_prio_unchanged); + } } next->activated =0 ; switch_tasks:
Quoted 15 lines · chen Shang
Given the frequency of
schedule()calling, there is a margin to improve it. In step of recalculate task priority, it first dequeues from one priority queue, callsrecalc_task_prio(), then enqueue the task into another priority queue. However, statistics shows only around 0.5% of recalculation changed task priority (see below). While rest of 99.5% of recalculation do not change priority, it is reasonably to userequeue_task()to avoid overhead of dequeue and enqueue on the same priority queue.The patch is implemented with above idea. Note, a new help function,
change_queue_task(), to combinedequeue()andenqueue()to reduce one function call overhead. Two statistics fields,sched_prio_changedandsched_prio_unchanged, are added to provide statistic data on priority recalculation.
Quoted 5 lines
Thanks,
Hi Chen,
With the added branch and the extra icache footprint, it isn't clear that this would be a win.
Also, you didn't say where your statistics came from (what workload).
So you really need to start by demonstrating some increase on some workload.
Also, minor comments on the patch: please work against mm kernels, please follow kernel coding style, and don't change schedstat output format in the same patch (makes it easier for those with schedstat parsing tools).
Quoted 54 lines
kernel/sched.c +12
-0+static void change_queue_task (struct task_struct *p,prio_array_t *array, +int old_prio) +{ +list_del (&p->run_list); +if (list_empty (array->queue + old_prio)) +__clear_bit (old_prio, array->bitmap); + +sched_info_queued (p); +list_add_tail (&p->run_list, array->queue + p->prio); +__set_bit (p->prio, array->bitmap); + p->array = array; +}/*
* Put task to the end of the run list without the overhead of dequeue
* followed by enqueue.kernel/sched.c +13
-3@@ -2668,7 +2690,7 @@struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, prio;/* * Test if we are atomic. Since do_exit() needs to call into @@ -2787,9 +2809,19 @@ delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); + prio = next->prio;recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + +if (unlikely (prio != next->prio)) + { +change_queue_task (next, array, prio); +schedstat_inc (rq, sched_prio_changed); + } +else + { +requeue_task (next, array); +schedstat_inc (rq, sched_prio_unchanged); + } } next->activated =0 ;
switch_tasks:
-
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in the body of a message to [email protected]
More majordomo info at http://vger.kernel.org/majordomo-info.html
Please read the FAQ at http://www.tux.org/lkml/
Quoted 6 lines
Hi Chen,
With the added branch and the extra icache footprint, it isn't clear that this would be a win.Also, you didn't say where your statistics came from (what workload).
Quoted 8 lines
So you really need to start by demonstrating some increase on some workload.
Also, minor comments on the patch: please work against mm kernels, please follow
kernel coding style, and don't change schedstat output format in the same patch
(makes it easier for those with schedstat parsing tools).
Hi Nick,
Thank you very much for your comments. This is the first time of my kernel hacking. I will reduce the lines of changes as much as possible. As regard to the statistics, there are just count, ie, the total number of priority-recalculations vs. the number of priority changed from the former recalculation.
Thanks again,
-chen
Quoted 14 lines · chen Shang
Quoted 6 lines
Hi Chen,
With the added branch and the extra icache footprint, it isn't clear that this would be a win.Also, you didn't say where your statistics came from (what workload).
Quoted 8 lines
So you really need to start by demonstrating some increase on some workload.
Also, minor comments on the patch: please work against mm kernels, please follow
kernel coding style, and don't change schedstat output format in the same patch
(makes it easier for those with schedstat parsing tools).
Quoted 7 lines
Hi Nick,
Thank you very much for your comments. This is the first time of my kernel hacking. I will reduce the lines of changes as much as possible. As regard to the statistics, there are just count, ie, the total number of priority-recalculations vs. the number of priority changed from the former recalculation.
A kernel profile (check list archives for oprofile) would easily demonstrate any performance gain. On my system the residency of schedule() is around 1% so this will be easy to spot.
Lee
Quoted 15 lines · chen Shang
Quoted 6 lines
Hi Chen,
With the added branch and the extra icache footprint, it isn't clear that this would be a win.Also, you didn't say where your statistics came from (what workload).
Quoted 9 lines
So you really need to start by demonstrating some increase on some workload.
Also, minor comments on the patch: please work against mm kernels, please follow
kernel coding style, and don't change schedstat output format in the same patch
(makes it easier for those with schedstat parsing tools).
Quoted 9 lines
Hi Nick,
Thank you very much for your comments. This is the first time of my kernel hacking. I will reduce the lines of changes as much as possible. As regard to the statistics, there are just count, ie, the total number of priority-recalculations vs. the number of priority changed from the former recalculation.
The only problem there is that changing the format will break at least my schedstats parser.
Seeing as it is not some functional change to the scheduler, your patch should not change schedstats. If you are *also* interested in the priority changed vs unchanged statistic, then you can do a patch for that seperately (ie. it doesn't depend on your optimisation in question).
Thanks,
Nick
I minimized my patch and against to 2.6.12-rc4 this time, see below.
The new schedstat fields are for the test propose only, so I removed them completedly from patch. Theoritically, requeue_task() is always cheaper than dequeue_task() followed by enqueue_task(). So, if 99% of priority recalculation trigger requeue_task(), it will save.
In addition, my load is to build the kernel, which took around 30 minutes with around 30% CPU usage on 2x2 processors (duel processors with HT enable).
Here is the statistics:
CPU0: priority_changed (669 times), priority_unchanged(335,138 times)
CPU1: priority_changed (784 times), priority_unchanged(342,419 times)
CPU2: priority_changed (782 times), priority_unchanged(283,494 times)
CPU3: priority_changed (872 times), priority_unchanged(365,865 times)
Thanks,
-chen
/*=====Patch=====*/
kernel/sched.c +11 -3
@@ -2613,7 +2613,7 @@struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, prio;/* * Test if we are atomic. Since do_exit() needs to call into
@@ -2735,9 +2735,17 @@ delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); + prio = next->prio; +recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + +if (unlikely (prio != next->prio)) + { +dequeue_task (next, array); +enqueue_task (next, array); + } +else +requeue_task (next, array); } next->activated =0 ; switch_tasks:
Quoted 12 lines · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
The new schedstat fields are for the test propose only, so I removed them completedly from patch. Theoritically,
requeue_task()is always cheaper thandequeue_task()followed byenqueue_task(). So, if 99% of priority recalculation triggerrequeue_task(), it will save.In addition, my load is to build the kernel, which took around 30 minutes with around 30% CPU usage on 2x2 processors (duel processors with HT enable).
Here is the statistics:
Quoted 6 lines
CPU0:
priority_changed(669 times),priority_unchanged(335,138 times)
CPU1:priority_changed(784 times),priority_unchanged(342,419 times)
CPU2:priority_changed(782 times),priority_unchanged(283,494 times)
CPU3:priority_changed(872 times),priority_unchanged(365,865 times)
OK that gives you a good grounds to look at the patch, but _performance_ improvement is what is needed to get it included.
Quoted 24 lines
Thanks,
-chen/*=====Patch=====*/
kernel/sched.c +3
-2@@ -2613,7 +2613,7 @@struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, prio;/* * Test if we are atomic. Since do_exit() needs to call into @@ -2735,9 +2735,17 @@ delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); + prio = next->prio; +recalc_task_prio (next, next->timestamp + delta);
kernel/sched.c line 2749
Quoted 10 lines
kernel/sched.c +8
-1-enqueue_task (next, array); + +if (unlikely (prio != next->prio)) + { +dequeue_task (next, array); +enqueue_task (next, array); + } +else +requeue_task (next, array);
Coding style says
if (unlikely()) {
...
} else
...
Quoted 13 lines · Nick Piggin
Quoted 12 lines · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
The new schedstat fields are for the test propose only, so I removed them completedly from patch. Theoritically,
requeue_task()is always cheaper thandequeue_task()followed byenqueue_task(). So, if 99% of priority recalculation triggerrequeue_task(), it will save.In addition, my load is to build the kernel, which took around 30 minutes with around 30% CPU usage on 2x2 processors (duel processors with HT enable).
Here is the statistics:
Quoted 7 lines
Quoted 4 lines
CPU0:
priority_changed(669 times),priority_unchanged(335,138 times)
CPU1:priority_changed(784 times),priority_unchanged(342,419 times)
CPU2:priority_changed(782 times),priority_unchanged(283,494 times)
CPU3:priority_changed(872 times),priority_unchanged(365,865 times)OK that gives you a good grounds to look at the patch, but _performance_ improvement is what is needed to get it included.
If you end up using requeue_task() in the fast path and it is hit frequently with your code you'll need to modify requeue_task to be inline as well. Currently it is hit only via sched_yield and once every 10 scheduler ticks which is why it is not inline. The performance hit will be demonstrable if it is hit in every schedule()
Cheers,
Con
Quoted 1 line · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
looks good - i've done some small style/whitespace cleanups and renamed prio to old_prio, patch against -rc4 below.
Ingo
From: Chen Shang <[email protected]>
kernel/sched.c renamed from kernel/sched.c.orig +9 -3
@@ -2613,7 +2613,7 @@ asmlinkage void __sched schedule(void)struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, old_prio;/* * Test if we are atomic. Since do_exit() needs to call into
@@ -2735,9 +2735,15 @@ go_idle: delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); + old_prio = next->prio; +recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + +if (unlikely (old_prio != next->prio)) { +dequeue_task (next, array); +enqueue_task (next, array); + }else +requeue_task (next, array); } next->activated =0 ; switch_tasks:
Quoted 5 lines · Ingo Molnar
Quoted 1 line · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
looks good - i've done some small style/whitespace cleanups and renamed prio to
old_prio, patch against -rc4 below.
We should inline requeue_task as well.
Con
----
Putting requeue_task into the common fast path code in schedule() will benefit generically from inlining the requeue_task function.
kernel/sched.c +1 -1
@@ -560,7 +560,7 @@ static void enqueue_task(struct task_str* Put task to the end of the run list without the overhead of dequeue * followed by enqueue. */ -static void requeue_task (struct task_struct *p,prio_array_t *array) +static inline void requeue_task (struct task_struct *p,prio_array_t *array) {list_move_tail (&p->run_list, array->queue + p->prio); }
Ingo Molnar
Acked-byQuoted 8 lines · Con Kolivas
Quoted 5 lines · Ingo Molnar
Quoted 1 line · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
looks good - i've done some small style/whitespace cleanups and renamed prio to
old_prio, patch against -rc4 below.We should inline
requeue_taskas well.
yeah.
Ingo
Here is the statistics data to support requeue_task() inline with the counter on sched_cnt at the same period. In brief, every 10 schedule() will trigger recalc_task_prio() a little more than 4 times.
CPU0: priority_changed (669 times), priority_unchanged(335,138 times), schedule_cnt(787,085 times)
CPU1: priority_changed (784 times), priority_unchanged(342,419 times), schedule_cnt(784,873 times)
CPU2: priority_changed (782 times), priority_unchanged(283,494 times), schedule_cnt(681,917 times)
CPU3: priority_changed (872 times), priority_unchanged(365,865 times), schedule_cnt(809,624 times)
Quoted 33 lines · Con Kolivas
Quoted 13 lines · Nick Piggin
Quoted 12 lines · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
The new schedstat fields are for the test propose only, so I removed them completedly from patch. Theoritically,
requeue_task()is always cheaper thandequeue_task()followed byenqueue_task(). So, if 99% of priority recalculation triggerrequeue_task(), it will save.In addition, my load is to build the kernel, which took around 30 minutes with around 30% CPU usage on 2x2 processors (duel processors with HT enable).
Here is the statistics:Quoted 7 lines
Quoted 4 lines
CPU0:
priority_changed(669 times),priority_unchanged(335,138 times)
CPU1:priority_changed(784 times),priority_unchanged(342,419 times)
CPU2:priority_changed(782 times),priority_unchanged(283,494 times)
CPU3:priority_changed(872 times),priority_unchanged(365,865 times)OK that gives you a good grounds to look at the patch, but _performance_ improvement is what is needed to get it included.
If you end up using
requeue_task()in the fast path and it is hit frequently with your code you'll need to modifyrequeue_taskto be inline as well. Currently it is hit only viasched_yieldand once every 10 scheduler ticks which is why it is not inline. The performance hit will be demonstrable if it is hit in everyschedule()Cheers,
Con
/*===== ISSUE ====*/
My second version of patch has a defect.
+ if (unlikely(old_prio != next->prio)) {
+ dequeue_task(next, array); --> ### dequeue should againstold_prio, NOT next->prio ###
+ enqueue_task(next, array);
+ }
unforunately, dequeue_task does not accept the third parameter to make adjustment. Personally, I feel it's good to add extra function as my first version of patch to combine dequeue and enqueue together. Reasons as following:
1) adding the third parameter to dequeue_task() would cause other places' code change;
2) for schedule functions, performance is the first consideration. Notice both dequeue_task() and enqueue_task() are NOT inline. Combining those two in one saves one function call overhead;
/* ===== NEW PATCH ===== */
The new patch, see below, adds new function change_queue_task() to dequeue from "old_prio queue" and enqueue the "next task" to "next->prio queue".
The patch also inlines requeue_task().
The patch has been tested with 2.6.11.10, looks good. -For somehow, 2.6.12-rc4 is still not stable on my machine (Fedora 3).
/* ===== [PATCH 2.6.11.?] kernel/sched.c =====*/
kernel/sched.c +1 -0
@@ -556,11 +556,23 @@ p->array = array; } +static void change_queue_task(struct task_struct *p, prio_array_t
*array, int old_prio)
+{
+ list_del(&p->run_list);
+ if (list_empty(array->queue + old_prio))
+ __clear_bit(old_prio, array->bitmap);
+
+ sched_info_queued(p);
+ list_add_tail(&p->run_list, array->queue + p->prio);
+ __set_bit(p->prio, array->bitmap);
+ p->array = array;
+}
+
/*
* Put task to the end of the run list without the overhead of dequeue
* followed by enqueue.
*/
-static void requeue_task(struct task_struct *p, prio_array_t *array) +static inline void requeue_task(struct task_struct *p, prio_array_t *array)
{
list_move_tail(&p->run_list, array->queue + p->prio);
}
@@ -2613,7 +2625,7 @@
struct list_head *queue;
unsigned long long now;
unsigned long run_time;
- int cpu, idx;
+ int cpu, idx, old_prio;
/*
* Test if we are atomic. Since do_exit() needs to call into
@@ -2735,9 +2747,14 @@
delta = delta * (ON_RUNQUEUE_WEIGHT * 128 / 100) / 128;
array = next->array;
- dequeue_task(next, array);
+ old_prio = next->prio;
+
recalc_task_prio(next, next->timestamp + delta);
- enqueue_task(next, array);
+
+ if (unlikely(old_prio != next->prio))
+ change_queue_task(next, array, old_prio);
+ else
+ requeue_task(next, array);
}
next->activated = 0;
switch_tasks:
/* ===== PATCH END ===== */
Thanks,
-chen
Quoted 18 lines · Ingo Molnar
Quoted 8 lines · Con Kolivas
Quoted 5 lines · Ingo Molnar
Quoted 1 line · chen Shang
I minimized my patch and against to 2.6.12-rc4 this time, see below.
looks good - i've done some small style/whitespace cleanups and renamed prio to
old_prio, patch against -rc4 below.We should inline
requeue_taskas well.yeah.
Acked-by Ingo Molnar <[email protected]>Ingo
Review
Quoted 8 lines · Chen Shang
/*===== ISSUE ====*/
My second version of patch has a defect.(quoted diff) +2
-0+ if (unlikely(old_prio != next->prio)) { + dequeue_task(next, array); --> ### dequeue should against
old_prio, NOTnext->prio###(quoted diff) +2
-0+ enqueue_task(next, array); + }
indeed...
Quoted 9 lines
unforunately,
dequeue_taskdoes not accept the third parameter to make adjustment. Personally, I feel it's good to add extra function as my first version of patch to combine dequeue and enqueue together. Reasons as following:
1) adding the third parameter todequeue_task()would cause other places' code change;
2) for schedule functions, performance is the first consideration. Notice bothdequeue_task()andenqueue_task()are NOT inline. Combining those two in one saves one function call overhead;
the real problem comes from recalc_task_prio() having a side-effect, which makes requeueing of tasks harder. The solution is to return the prio from recalc_task_prio() - see the tested patch below. Agreed?
Ingo
--
micro-optimize task requeueing in schedule() & clean up recalc_task_prio().
From: Chen Shang <[email protected]>
kernel/sched.c renamed from kernel/sched.c.orig +12 -7
@@ -675,7 +675,7 @@ static inline void __activate_idle_task( rq->nr_running++; } -static void recalc_task_prio (task_t *p,unsigned long long now) +static int recalc_task_prio (task_t *p,unsigned long long now) {/* Caller must always ensure 'now >= p->timestamp' */ unsigned long long __sleep_time = now - p->timestamp;
@@ -734,7 +734,7 @@ static void recalc_task_prio(task_t *p, } } - p->prio =effective_prio (p); +return effective_prio (p); }/*
@@ -757,7 +757,7 @@ static void activate_task(task_t *p, run }#endif -recalc_task_prio (p, now); + p->prio =recalc_task_prio (p, now);/* * This checks to make sure it's not an uninterruptible task
@@ -2751,7 +2751,7 @@ asmlinkage void __sched schedule(void)struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, new_prio;/* * Test if we are atomic. Since do_exit() needs to call into
@@ -2873,9 +2873,14 @@ go_idle: delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); -recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + new_prio =recalc_task_prio (next, next->timestamp + delta); + +if (unlikely (next->prio != new_prio)) { +dequeue_task (next, array); + next->prio = new_prio; +enqueue_task (next, array); + }else +requeue_task (next, array); } next->activated =0 ; switch_tasks:
much better.
If so, another place, activate_task(), need to make adjustment as well.
-chen
/* ============================ */
/*
@@ -704,7 +704,7 @@
}
#endif
- recalc_task_prio(p, now);
+ p->prio = recalc_task_prio(p, now);
/* ============================ */
Quoted 69 lines · Ingo Molnar
the real problem comes from
recalc_task_prio()having a side-effect, which makes requeueing of tasks harder. The solution is to return the prio fromrecalc_task_prio()- see the tested patch below. Agreed?Ingo
--
micro-optimize task requeueing in
schedule()& clean uprecalc_task_prio().kernel/sched.c renamed from kernel/sched.c.orig +12
-7@@ -675,7 +675,7 @@ static inline void __activate_idle_task( rq->nr_running++; } -static void recalc_task_prio (task_t *p,unsigned long long now) +static int recalc_task_prio (task_t *p,unsigned long long now) {/* Caller must always ensure 'now >= p->timestamp' */ unsigned long long __sleep_time = now - p->timestamp;@@ -734,7 +734,7 @@ static void recalc_task_prio(task_t *p, } } - p->prio =effective_prio (p); +return effective_prio (p); }/* @@ -757,7 +757,7 @@ static void activate_task(task_t *p, run }#endif -recalc_task_prio (p, now); + p->prio =recalc_task_prio (p, now);/* * This checks to make sure it's not an uninterruptible task @@ -2751,7 +2751,7 @@ asmlinkage void __sched schedule(void)struct list_head *queue;unsigned long long now;unsigned long run_time; -int cpu, idx; +int cpu, idx, new_prio;/* * Test if we are atomic. Since do_exit() needs to call into @@ -2873,9 +2873,14 @@ go_idle: delta = delta * (ON_RUNQUEUE_WEIGHT *128 /100 ) /128 ; array = next->array; -dequeue_task (next, array); -recalc_task_prio (next, next->timestamp + delta); -enqueue_task (next, array); + new_prio =recalc_task_prio (next, next->timestamp + delta); + +if (unlikely (next->prio != new_prio)) { +dequeue_task (next, array); + next->prio = new_prio; +enqueue_task (next, array); + }else +requeue_task (next, array); } next->activated =0 ; switch_tasks: