Skip to contentSkip to conversation

3 of 5 IMA: LSM-based measurement code

PATCH Reiner Sailer 1 participant 1 message Jun 15, 2005

lore
Share & tools
lore
#0 lore raw
Quoted 9 lines · Serge E. Hallyn

That's true, of course. Reiner, would any of the integrity measurement hooks be moved to a better place than the current LSM hooks? Is there a preferred ordering - ie measurement should always happen before the LSM modules, or always after? Either of these would of course be clear reasons to separate IMA into its own subsystem.

thanks,
-serge

Originally, IMA was not an LSM. However, when moving to a 2.6 kernel, we moved it to LSM and have found very easily the current hooks. I don't think the hook position would change when moving from LSM to non-LSM.

Thanks
Reiner