Skip to contentSkip to conversation

LTP release preparations

LTP Cyril Hrubis 3 participants 4 messages Sep 7 – Sep 24

lore
Share & tools
lore
#0 lore raw

Hi!
We are supposed to produce another release at the end of the September, so as usuall please report which patches should be considered before the release.

As for me I would like to merge the sysfs testsuite, it has been reviewed and it's ready to be merged (with a few minor adjustments).

Signature · 5 lines
Cyril Hrubis
[email protected]

-- 
Mailing list info: https://lists.linux.it/listinfo/ltp
#1 lore raw

Hi Cyril,

Quoted 7 lines

Hi!
We are supposed to produce another release at the end of the September, so as usuall please report which patches should be considered before the release.

As for me I would like to merge the sysfs testsuite, it has been reviewed and it's ready to be merged (with a few minor adjustments).

+1 feel free to merge. The earlier we do it, the higher is the chance we will find bugs in automation (if any).

Personally I have quite a few patches I would like to merge before the release.

coredump:
https://patchwork.kernel.org/project/ltp/list/?series=1157883

ghostlock reproducer:
https://patchwork.kernel.org/project/ltp/list/?series=1157677

swapon coverage:
https://patchwork.kernel.org/project/ltp/list/?series=1157115

MAP_32BIT coverage:
https://patchwork.kernel.org/project/ltp/list/?series=1153340

minimal kernel support:
https://patchwork.kernel.org/project/ltp/list/?series=1157773

There are also the keyctl coverage and the new new fchroot() testing suite, but they are quite big. Up to you if you want to review 45 patches :-)

Regards,
--
Andrea Cervesato
SUSE QE Automation Engineer Linux
[email protected]

Signature · 1 line
Mailing list info: https://lists.linux.it/listinfo/ltp
#2 lore raw
In reply to Cyril Hrubis

Hi!
As we are nearing the release my plan is to finish review of the keyctl() patchset tomorrow, it looks in good enough shape to be merged before the release with a few minor fixes.

After that I would like to freeze the git, then we will start the pre-release testing and continue working on the few fixes that are in the queue.

The release should happen as usuall on the 30th of September.

Signature · 5 lines
Cyril Hrubis
[email protected]

-- 
Mailing list info: https://lists.linux.it/listinfo/ltp
#3 lore raw
In reply to Cyril Hrubis

I have manually built and tested the main branch locally, everything looks good. (kernel-6.6.145, x86_64, vm)

Hopefully this adds confidence in the release.

Signature · 5 lines
Regards,
Li Wang

-- 
Mailing list info: https://lists.linux.it/listinfo/ltp