Skip to contentSkip to conversation

sched/deadline: Fixes for constrained deadline tasks

PATCH Superseded Daniel Bristot de Oliveira 6 participants 17 messages Feb 10, 2017 – Feb 13, 2017 Scheduler

v1 of 4 Superseded Latest is v4 →

lore
Share & tools
lore
#0 lore raw

cover sched/deadline: Fixes for constrained deadline tasks

While reading sched deadline code, I find out that a constrained deadline task could be replenished before the next period if activated after the deadline, opening the window to run for more than Q/P. The patch [2] explains and fixes this problem.

Furthermore, while fixing this issue, I found that the replenishment timer was being fired at the deadline of the task. This works fine for implicit deadline tasks (deadline == period) because the deadline is at the same point in time of the next period. But that is not true for constrained deadline tasks (deadline < period). This problem is not as visible as the first because the runtime leakage takes place only in the second activation. Next activations receive the correct bandwidth. However, after the 2nd activation, tasks are activated in the (period - dl_deadline) instant, which is before the expected activation. This problem is explained in the fix description as well.

Daniel Bristot de Oliveira (2):
sched/deadline: Replenishment timer should fire in the next period sched/deadline: Throttle a constrained deadline task activated after
the deadline

 kernel/sched/deadline.c | 53 +++++++++++++++++++++++++++++++++++++++++++++++--
 1 file changed, 51 insertions(+), 2 deletions(-)
Signature · 1 line
2.9.3
#1 lore raw

PATCH 1/2 sched/deadline: Replenishment timer should fire in the next period

Currently, the replenishment timer is set to fire at the deadline of a task. Although that works for implicit deadline tasks because the deadline is equals to the begin of the next period, that is not correct for constrained deadline tasks (deadline < period).

For instance:

f.c:
--------------- %< ---------------
int main (void)

{
	for(;;);
}

--------------- >% ---------------

  # gcc -o f f.c
  # trace-cmd record -e sched:sched_switch                              \
   				   -e syscalls:sys_exit_sched_setattr   \
   chrt -d --sched-runtime  490000000 					\
           --sched-deadline 500000000 					\
	   --sched-period  1000000000 0 ./f
  # trace-cmd report | grep "{pid of ./f}"

After setting parameters, the task is replenished and continue running until being throttled.

         f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0

The task is throttled after running 492318 ms, as expected.

         f-11295 [003] 13322.606094: sched_switch:   f:11295 [-1] R ==> \
						   watchdog/3:32 [0]

But then, the task is replenished 500719 ms after the first replenishment:

    <idle>-0     [003] 13322.614495: sched_switch:   swapper/3:0 [120] R \
						   ==> f:11295 [-1]

Running for 490277 ms:

         f-11295 [003] 13323.104772: sched_switch:   f:11295 [-1] R ==>  \
						   swapper/3:0 [120]

Hence, in the first period, the task runs 2 * runtime, and that is a bug.

During the first replenishment, the next deadline is set one period away. So the runtime/period starts to be respected. However, as the second replenishment took place in the wrong instant, the next replenishment will also be held in a wrong instant of time. Rather than occurring in the nth period away from the first activation, it is taking place in the (nth period - relative deadline).

Cc Ingo Molnar <[email protected]>
Cc Peter Zijlstra <[email protected]>
Cc Juri Lelli <[email protected]>
Cc Tommaso Cucinotta <[email protected]>
Cc Luca Abeni <[email protected]>
Cc Steven Rostedt <[email protected]>
---
 kernel/sched/deadline.c | 9 +++++++--
 1 file changed, 7 insertions(+), 2 deletions(-)
kernel/sched/deadline.c +7 -2
index 70ef2b1..3c94d85 100644
@@ -505,10 +505,15 @@ static void update_dl_entity(struct sched_dl_entity *dl_se,
 	}
 }
 
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+	return dl_se->deadline - dl_se->dl_deadline + dl_se->dl_period;
+}
+
 /*
  * If the entity depleted all its runtime, and if we want it to sleep
  * while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
  * and try to activate it.
  *
  * Notice that it is important for the caller to know if the timer
@@ -530,7 +535,7 @@ static int start_dl_timer(struct task_struct *p)
 	 * that it is actually coming from rq->clock and not from
 	 * hrtimer's time base reading.
 	 */
-	act = ns_to_ktime(dl_se->deadline);
+	act = ns_to_ktime(dl_next_period(dl_se));
 	now = hrtimer_cb_get_time(timer);
 	delta = ktime_to_ns(now) - rq_clock(rq);
 	act = ktime_add_ns(act, delta);
Signature · 1 line
2.9.3
#7 lore raw

PATCH 2/2 sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Daniel Bristot de Oliveira

During the activation, CBS checks if it can reuse the current task's runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime/period. In a very load system, this can cause the domino effect, making other tasks to miss their deadlines.

To avoid this problem, in the activation of a constrained deadline task after the deadline but before the next period, throttle the task and set the replenishing timer to the begin of the next period, unless it is boosted.

Reproducer:

--------------- %< ---------------
int main (int argc, char **argv)

  {
	int ret;
	int flags = 0;
	unsigned long l = 0;
	struct timespec ts;
	struct sched_attr attr;

	memset(&attr, 0, sizeof(attr));
	attr.size = sizeof(attr);

	attr.sched_policy   = SCHED_DEADLINE;
	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

	ts.tv_sec = 0;
	ts.tv_nsec = 2000 * 1000;			/* 2 ms */

	ret = sched_setattr(0, &attr, flags);

	if (ret < 0) {
		perror("sched_setattr");
		exit(-1);
	}

	for(;;) {
		/* XXX: you may need to adjust the loop */
		for (l = 0; l < 150000; l++);
		/*
		 * The ideia is to go to sleep right before the deadline
		 * and then wake up before the next period to receive
		 * a new replenishment.
		 */
		nanosleep(&ts, NULL);
	}

	exit(0);

}
--------------- >% ---------------

On my box, this reproducer uses almost 50% of the CPU time, which is obviously wrong for a task with 2/2000 reservation.

Cc Ingo Molnar <[email protected]>
Cc Peter Zijlstra <[email protected]>
Cc Juri Lelli <[email protected]>
Cc Tommaso Cucinotta <[email protected]>
Cc Luca Abeni <[email protected]>
Cc Steven Rostedt <[email protected]>
---
 kernel/sched/deadline.c | 44 ++++++++++++++++++++++++++++++++++++++++++++
 1 file changed, 44 insertions(+)
kernel/sched/deadline.c +44 -0
index 3c94d85..b74d40e 100644
@@ -694,6 +694,36 @@ void init_dl_task_timer(struct sched_dl_entity *dl_se)
 	timer->function = dl_task_timer;
 }
 
+/* During the activation, CBS checks if it can reuse the current task's
+ * runtime and period. If the deadline of the task is in the past, CBS
+ * cannot use the runtime, and so it replenishes the task. This rule
+ * works fine for implicit deadline tasks (deadline == period), and the
+ * CBS was designed for implicit deadline tasks. However, a task with
+ * constrained deadline (deadine < period) might be awakened after the
+ * deadline, but before the next period. In this case, replenishing the
+ * task would allow it to run for runtime / deadline. As in this case
+ * deadline < period, CBS enables a task to run for more than the
+ * runtime / period. In a very load system, this can cause the domino
+ * effect, making other tasks to miss their deadlines.
+ *
+ * To avoid this problem, in the activation of a constrained deadline
+ * task after the deadline but before the next period, throttle the
+ * task and set the replenishing timer to the begin of the next period,
+ * unless it is boosted.
+ */
+static inline void dl_check_constrained_dl(struct sched_dl_entity *dl_se)
+{
+	struct task_struct *p = dl_task_of(dl_se);
+	struct rq *rq = rq_of_dl_rq(dl_rq_of_se(dl_se));
+
+	if (dl_time_before(dl_se->deadline, rq_clock(rq)) &&
+	    dl_time_before(rq_clock(rq), dl_next_period(dl_se))) {
+		if (unlikely(dl_se->dl_boosted || !start_dl_timer(p)))
+			return;
+		dl_se->dl_throttled = 1;
+	}
+}
+
 static
 int dl_runtime_exceeded(struct sched_dl_entity *dl_se)
 {
@@ -927,6 +957,11 @@ static void dequeue_dl_entity(struct sched_dl_entity *dl_se)
 	__dequeue_dl_entity(dl_se);
 }
 
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+	return dl_se->dl_runtime < dl_se->dl_period;
+}
+
 static void enqueue_task_dl(struct rq *rq, struct task_struct *p, int flags)
 {
 	struct task_struct *pi_task = rt_mutex_get_top_task(p);
@@ -953,6 +988,15 @@ static void enqueue_task_dl(struct rq *rq, struct task_struct *p, int flags)
 	}
 
 	/*
+	 * Check if a constrained deadline task was activated
+	 * after the deadline but before the next period.
+	 * If that is the case, the task will be throttled and
+	 * the replenishment timer will be set to the next period.
+	 */
+	if (!pi_se->dl_throttled && dl_is_constrained(pi_se))
+		dl_check_constrained_dl(pi_se);
+
+	/*
 	 * If p is throttled, we do nothing. In fact, if it exhausted
 	 * its budget it needs a replenishment and, since it now is on
 	 * its rq, the bandwidth timer callback (which clearly has not
Signature · 1 line
2.9.3
#2 lore raw

Re: [PATCH 1/2] sched/deadline: Replenishment timer should fire in the next period

In reply to Daniel Bristot de Oliveira
Quoted 17 lines · On Fri, 10 Feb 2017 20:48:10 +0100 Daniel Bristot de Oliveira…

Currently, the replenishment timer is set to fire at the deadline of a task. Although that works for implicit deadline tasks because the deadline is equals to the begin of the next period, that is not correct for constrained deadline tasks (deadline < period).

For instance:

f.c:
--------------- %< ---------------
int main (void)

{
	for(;;);
}

--------------- >% ---------------

  # gcc -o f f.c
Quoted 7 lines
  # trace-cmd record -e sched:sched_switch                              \
   				   -e syscalls:sys_exit_sched_setattr   \
   chrt -d --sched-runtime  490000000 					\
           --sched-deadline 500000000 					\
	   --sched-period  1000000000 0 ./f
  # trace-cmd report | grep "{pid of ./f}"
 # trace-cmd report -F '.*:common_pid == 11295'

does the same ;-)

Or better yet, add "-F" (just -F, no extra paremeter. In report, -F means "filter", in record -F means "follow"), and that will only record the task that is created.

Also, it may be nice to use --ts-diff option to see results. I ran this with my own spinning program, and here's the output:

 # trace-cmd report --ts-diff
[...]
        userspin-1540  [003]   298.725084: (+822)   sys_exit_sched_setattr: 0x0
        userspin-1540  [003]   299.218199: (+493115) sched_switch:         userspin:1540 [4294967295] R ==> rcuc/3:38 [98]
          <idle>-0     [003]   299.225111: (+6912)  sched_switch:         swapper/3:0 [120] R ==> userspin:1540 [4294967295]
        userspin-1540  [003]   299.718192: (+493081) sched_switch:         userspin:1540 [4294967295] R ==> ktimersoftd/3:39 [98]
          <idle>-0     [003]   300.225125: (+506933) sched_switch:         swapper/3:0 [120] R ==> userspin:1540 [4294967295]
        userspin-1540  [003]   300.717185: (+492060) sched_switch:         userspin:1540 [4294967295] R ==> rcuc/3:38 [98]
          <idle>-0     [003]   301.225116: (+507931) sched_switch:         swapper/3:0 [120] R ==> userspin:1540 [4294967295]
        userspin-1540  [003]   301.718177: (+493061) sched_switch:         userspin:1540 [4294967295] R ==> rcuc/3:38 [98]
          <idle>-0     [003]   302.225120: (+506943) sched_switch:         swapper/3:0 [120] R ==> userspin:1540 [4294967295]
Quoted 18 lines

After setting parameters, the task is replenished and continue running until being throttled.

         f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0

The task is throttled after running 492318 ms, as expected.

         f-11295 [003] 13322.606094: sched_switch:   f:11295 [-1] R ==> \
						   watchdog/3:32 [0]

But then, the task is replenished 500719 ms after the first replenishment:

    <idle>-0     [003] 13322.614495: sched_switch:   swapper/3:0 [120] R \
						   ==> f:11295 [-1]  

Running for 490277 ms:

         f-11295 [003] 13323.104772: sched_switch:   f:11295 [-1] R ==>  \
						   swapper/3:0 [120]
Quoted 8 lines

Hence, in the first period, the task runs 2 * runtime, and that is a bug.

During the first replenishment, the next deadline is set one period away. So the runtime/period starts to be respected. However, as the second replenishment took place in the wrong instant, the next replenishment will also be held in a wrong instant of time. Rather than occurring in the nth period away from the first activation, it is taking place in the (nth period - relative deadline).

OK, after you patch, I get this:

        userspin-1581  [003]   103.450129: (+716)   sys_exit_sched_setattr: 0x0
        userspin-1581  [003]   103.943957: (+493828) sched_switch:         userspin:1581 [4294967295] R ==> rcuc/3:38 [98]
          <idle>-0     [003]   104.450172: (+506215) sched_switch:         swapper/3:0 [120] R ==> userspin:1581 [4294967295]
        userspin-1581  [003]   104.942349: (+492177) sched_switch:         userspin:1581 [4294967295] R ==> watchdog/3:36 [0]
          <idle>-0     [003]   105.450164: (+507815) sched_switch:         swapper/3:0 [120] R ==> userspin:1581 [4294967295]
        userspin-1581  [003]   105.942354: (+492190) sched_switch:         userspin:1581 [4294967295] R ==> ktimersoftd/3:39 [98]
          <idle>-0     [003]   106.450159: (+507805) sched_switch:         swapper/3:0 [120] R ==> userspin:1581 [4294967295]
        userspin-1581  [003]   106.942366: (+492207) sched_switch:         userspin:1581 [4294967295] R ==> ktimersoftd/3:39 [98]
          <idle>-0     [003]   107.450164: (+507798) sched_switch:         swapper/3:0 [120] R ==> userspin:1581 [4294967295]

Looks promising. But unrelated, I noticed this with and without your patch:

        userspin-1567  [002]    81.455345: (+1196)  sys_exit_sched_setattr: 0x0
        userspin-1567  [002]    81.457599: (+2254)  sched_switch:         chrt:1567 [4294967295] D ==> rcuc/2:29 [98]
          <idle>-0     [002]    81.466030: (+8431)  sched_switch:         swapper/2:0 [120] R ==> chrt:1567 [4294967295]
        userspin-1567  [002]    81.466123: (+93)    sched_switch:         chrt:1567 [4294967295] D ==> rcuc/2:29 [98]
          <idle>-0     [002]    81.471862: (+5739)  sched_switch:         swapper/2:0 [120] R ==> chrt:1567 [4294967295]
        userspin-1567  [002]    81.471959: (+97)    sched_switch:         chrt:1567 [4294967295] D ==> swapper/2:0 [120]
          <idle>-0     [002]    81.478285: (+6326)  sched_switch:         swapper/2:0 [120] R ==> chrt:1567 [4294967295]
        userspin-1567  [002]    81.478369: (+84)    sched_switch:         chrt:1567 [4294967295] D ==> swapper/2:0 [120]
          <idle>-0     [002]    81.486664: (+8295)  sched_switch:         swapper/2:0 [120] R ==> chrt:1567 [4294967295]
        userspin-1567  [002]    81.487291: (+627)   sched_switch:         chrt:1567 [4294967295] D|W ==> swapper/2:0 [120]
          <idle>-0     [002]    81.494884: (+7593)  sched_switch:         swapper/2:0 [120] R ==> chrt:1567 [4294967295]
        userspin-1567  [002]    81.988095: (+493211) sched_switch:         userspin:1567 [4294967295] R ==> rcuc/2:29 [98]
          <idle>-0     [002]    82.496009: (+507914) sched_switch:         swapper/2:0 [120] R ==> userspin:1567 [4294967295]
        userspin-1567  [002]    82.988158: (+492149) sched_switch:         userspin:1567 [4294967295] R ==> rcuc/2:29 [98]
          <idle>-0     [002]    83.494897: (+506739) sched_switch:         swapper/2:0 [120] R ==> userspin:1567 [4294967295]
        userspin-1567  [002]    83.986181: (+491284) sched_switch:         userspin:1567 [4294967295] R ==> rcuc/2:29 [98]
          <idle>-0     [002]    84.494895: (+508714) sched_switch:         swapper/2:0 [120] R ==> userspin:1567 [4294967295]

A bit of choppiness to get started. I'll have to look more into this.

I'll take a look at this patch deeper to try to understand everything before applying a reviewed-by.

-- Steve

Quoted 44 lines
Cc Ingo Molnar <[email protected]>
Cc Peter Zijlstra <[email protected]>
Cc Juri Lelli <[email protected]>
Cc Tommaso Cucinotta <[email protected]>
Cc Luca Abeni <[email protected]>
Cc Steven Rostedt <[email protected]>
---
 kernel/sched/deadline.c | 9 +++++++--
 1 file changed, 7 insertions(+), 2 deletions(-)
kernel/sched/deadline.c +7 -2
index 70ef2b1..3c94d85 100644
@@ -505,10 +505,15 @@ static void update_dl_entity(struct sched_dl_entity *dl_se,
 	}
 }
 
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+	return dl_se->deadline - dl_se->dl_deadline + dl_se->dl_period;
+}
+
 /*
  * If the entity depleted all its runtime, and if we want it to sleep
  * while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
  * and try to activate it.
  *
  * Notice that it is important for the caller to know if the timer
@@ -530,7 +535,7 @@ static int start_dl_timer(struct task_struct *p)
 	 * that it is actually coming from rq->clock and not from
 	 * hrtimer's time base reading.
 	 */
-	act = ns_to_ktime(dl_se->deadline);
+	act = ns_to_ktime(dl_next_period(dl_se));
 	now = hrtimer_cb_get_time(timer);
 	delta = ktime_to_ns(now) - rq_clock(rq);
 	act = ktime_add_ns(act, delta);
#3 lore raw

Re: [PATCH 1/2] sched/deadline: Replenishment timer should fire in the next period

In reply to Daniel Bristot de Oliveira

Hi Daniel,

On Fri, 10 Feb 2017 20:48:10 +0100
Daniel Bristot de Oliveira <[email protected]> wrote:

[...]

Quoted 22 lines
kernel/sched/deadline.c +5 -1
index 70ef2b1..3c94d85 100644
@@ -505,10 +505,15 @@ static void update_dl_entity(struct
 sched_dl_entity *dl_se, }
 }
 
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+	return dl_se->deadline - dl_se->dl_deadline +
 dl_se->dl_period; +}
+
 /*
  * If the entity depleted all its runtime, and if we want it to sleep
  * while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
  * and try to activate it.
  *
  * Notice that it is important for the caller to know if the timer

kernel/sched/deadline.c static int start_dl_timer(struct task_struct *p) · line 538

Quoted 5 lines
kernel/sched/deadline.c +1 -1
@@ -530,7 +535,7 @@ static int start_dl_timer(struct task_struct *p)
 	 * that it is actually coming from rq->clock and not from
 	 * hrtimer's time base reading.
 	 */
-	act = ns_to_ktime(dl_se->deadline);
+	act = ns_to_ktime(dl_next_period(dl_se));

Looks like there is a real bug in the code, and your fix looks correct to me. I think it should be committed.

Thanks,
Luca

Quoted 3 lines
kernel/sched/deadline.c +0 -0
 	now = hrtimer_cb_get_time(timer);
 	delta = ktime_to_ns(now) - rq_clock(rq);
 	act = ktime_add_ns(act, delta);
#8 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Daniel Bristot de Oliveira

Hi Daniel,

Quoted 11 lines · On Fri, 10 Feb 2017 20:48:11 +0100 Daniel Bristot de Oliveira…

During the activation, CBS checks if it can reuse the current task's runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime/period. In a very load system, this can cause the domino effect, making other tasks to miss their deadlines.

I think you are right: SCHED_DEADLINE implements the original CBS algorithm here, but uses relative deadlines different from periods in other places (while the original algorithm only considered relative deadlines equal to periods).
An this mix is dangerous... I think your fix is correct, and cures a real problem.

Thanks,
Luca

Quoted 145 lines

To avoid this problem, in the activation of a constrained deadline task after the deadline but before the next period, throttle the task and set the replenishing timer to the begin of the next period, unless it is boosted.

Reproducer:

--------------- %< ---------------
int main (int argc, char **argv)

  {
	int ret;
	int flags = 0;
	unsigned long l = 0;
	struct timespec ts;
	struct sched_attr attr;

	memset(&attr, 0, sizeof(attr));
	attr.size = sizeof(attr);

	attr.sched_policy   = SCHED_DEADLINE;
	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms
*/ attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

	ts.tv_sec = 0;
	ts.tv_nsec = 2000 * 1000;			/* 2 ms */

	ret = sched_setattr(0, &attr, flags);

	if (ret < 0) {
		perror("sched_setattr");
		exit(-1);
	}

	for(;;) {
		/* XXX: you may need to adjust the loop */
		for (l = 0; l < 150000; l++);
		/*
		 * The ideia is to go to sleep right before the
deadline
		 * and then wake up before the next period to receive
		 * a new replenishment.
		 */
		nanosleep(&ts, NULL);
	}

	exit(0);

}
--------------- >% ---------------

On my box, this reproducer uses almost 50% of the CPU time, which is obviously wrong for a task with 2/2000 reservation.

Cc Ingo Molnar <[email protected]>
Cc Peter Zijlstra <[email protected]>
Cc Juri Lelli <[email protected]>
Cc Tommaso Cucinotta <[email protected]>
Cc Luca Abeni <[email protected]>
Cc Steven Rostedt <[email protected]>
---
 kernel/sched/deadline.c | 44

++++++++++++++++++++++++++++++++++++++++++++ 1 file changed, 44 insertions(+)

kernel/sched/deadline.c +1 -0
index 3c94d85..b74d40e 100644
@@ -694,6 +694,36 @@ void init_dl_task_timer(struct sched_dl_entity
 *dl_se) timer->function = dl_task_timer;
 }
 
+/* During the activation, CBS checks if it can reuse the current

task's
+ * runtime and period. If the deadline of the task is in the past, CBS
+ * cannot use the runtime, and so it replenishes the task. This rule
+ * works fine for implicit deadline tasks (deadline == period), and the
+ * CBS was designed for implicit deadline tasks. However, a task with
+ * constrained deadline (deadine < period) might be awakened after the
+ * deadline, but before the next period. In this case, replenishing the
+ * task would allow it to run for runtime / deadline. As in this case
+ * deadline < period, CBS enables a task to run for more than the
+ * runtime / period. In a very load system, this can cause the domino
+ * effect, making other tasks to miss their deadlines.
+ *
+ * To avoid this problem, in the activation of a constrained deadline
+ * task after the deadline but before the next period, throttle the
+ * task and set the replenishing timer to the begin of the next period,
+ * unless it is boosted.
+ */
+static inline void dl_check_constrained_dl(struct sched_dl_entity *dl_se) +{

kernel/sched/deadline.c +6 -0
+	struct task_struct *p = dl_task_of(dl_se);
+	struct rq *rq = rq_of_dl_rq(dl_rq_of_se(dl_se));
+
+	if (dl_time_before(dl_se->deadline, rq_clock(rq)) &&
+	    dl_time_before(rq_clock(rq), dl_next_period(dl_se))) {
+		if (unlikely(dl_se->dl_boosted

|| !start_dl_timer(p)))

kernel/sched/deadline.c +19 -0
+			return;
+		dl_se->dl_throttled = 1;
+	}
+}
+
 static
 int dl_runtime_exceeded(struct sched_dl_entity *dl_se)
 {
@@ -927,6 +957,11 @@ static void dequeue_dl_entity(struct
 sched_dl_entity *dl_se) __dequeue_dl_entity(dl_se);
 }
 
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+	return dl_se->dl_runtime < dl_se->dl_period;
+}
+
 static void enqueue_task_dl(struct rq *rq, struct task_struct *p,
 int flags) {
 	struct task_struct *pi_task = rt_mutex_get_top_task(p);
@@ -953,6 +988,15 @@ static void enqueue_task_dl(struct rq *rq,
 struct task_struct *p, int flags) }
 
 	/*
+	 * Check if a constrained deadline task was activated
+	 * after the deadline but before the next period.
+	 * If that is the case, the task will be throttled and
+	 * the replenishment timer will be set to the next period.
+	 */
+	if (!pi_se->dl_throttled && dl_is_constrained(pi_se))
+		dl_check_constrained_dl(pi_se);
+
+	/*
 	 * If p is throttled, we do nothing. In fact, if it exhausted
 	 * its budget it needs a replenishment and, since it now is

on
* its rq, the bandwidth timer callback (which clearly has
not

#9 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

Quoted 20 lines · luca abeni

Hi Daniel,

Quoted 6 lines · On Fri, 10 Feb 2017 20:48:11 +0100 Daniel Bristot de Oliveira…

During the activation, CBS checks if it can reuse the current task's
runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the

Quoted 8 lines

CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the
task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime/period. In a very load system, this can cause the domino effect, making other tasks to miss their deadlines.

Quoted 6 lines

I think you are right: SCHED_DEADLINE implements the original CBS algorithm here, but uses relative deadlines different from periods in other places (while the original algorithm only considered relative deadlines equal to periods).
An this mix is dangerous... I think your fix is correct, and cures a real problem.

Both of these should be tagged for stable as well, or?

-Mike

#10 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

Quoted 2 lines · On Sat, 11 Feb 2017 09:00:06 +0100 Mike Galbraith <[email protected]> wrote:

Both of these should be tagged for stable as well, or?

Yes.

-- Steve

maintainer Reviewed-by Luca Abeni
#4 lore raw

Re: [PATCH 1/2] sched/deadline: Replenishment timer should fire in the next period

In reply to luca abeni
Quoted 28 lines · luca abeni

Hi Daniel,

On Fri, 10 Feb 2017 20:48:10 +0100
Daniel Bristot de Oliveira <[email protected]> wrote:

[...]

Quoted 22 lines
kernel/sched/deadline.c +5 -1
index 70ef2b1..3c94d85 100644
@@ -505,10 +505,15 @@ static void update_dl_entity(struct
 sched_dl_entity *dl_se, }
 }
 
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+	return dl_se->deadline - dl_se->dl_deadline +
 dl_se->dl_period; +}
+
 /*
  * If the entity depleted all its runtime, and if we want it to sleep
  * while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
  * and try to activate it.
  *
  * Notice that it is important for the caller to know if the timer
@@ -530,7 +535,7 @@ static int start_dl_timer(struct task_struct *p)
Quoted 9 lines

kernel/sched/deadline.c static int start_dl_timer(struct task_struct *p) · line 538

Quoted 5 lines
kernel/sched/deadline.c +1 -1
 	 * that it is actually coming from rq->clock and not from
 	 * hrtimer's time base reading.
 	 */
-	act = ns_to_ktime(dl_se->deadline);
+	act = ns_to_ktime(dl_next_period(dl_se));

Looks like there is a real bug in the code, and your fix looks correct to me. I think it should be committed.

I've interpreted this as:

Holler if you disagree.

maintainer
#12 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Daniel Bristot de Oliveira
Quoted 2 lines · Daniel Bristot de Oliveira

+/* During the activation, CBS checks if it can reuse the current task's
+ * runtime and period. If the deadline of the task is in the past, CBS

Broken comment style, fixed that for you.

maintainer
#11 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to luca abeni
Quoted 17 lines · luca abeni

Hi Daniel,

Quoted 11 lines · On Fri, 10 Feb 2017 20:48:11 +0100 Daniel Bristot de Oliveira…

During the activation, CBS checks if it can reuse the current task's runtime and period. If the deadline of the task is in the past, CBS cannot use the runtime, and so it replenishes the task. This rule works fine for implicit deadline tasks (deadline == period), and the CBS was designed for implicit deadline tasks. However, a task with constrained deadline (deadine < period) might be awakened after the deadline, but before the next period. In this case, replenishing the task would allow it to run for runtime / deadline. As in this case deadline < period, CBS enables a task to run for more than the runtime/period. In a very load system, this can cause the domino effect, making other tasks to miss their deadlines.

Quoted 7 lines

I think you are right: SCHED_DEADLINE implements the original CBS algorithm here, but uses relative deadlines different from periods in other places (while the original algorithm only considered relative deadlines equal to periods).
An this mix is dangerous... I think your fix is correct, and cures a real problem.

Made that a "Reviewed-by:" tag in your name again.

#13 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Peter Zijlstra
Quoted 4 lines · Peter Zijlstra
Quoted 2 lines · Daniel Bristot de Oliveira

+/* During the activation, CBS checks if it can reuse the current task's
+ * runtime and period. If the deadline of the task is in the past, CBS

Broken comment style, fixed that for you.

Thanks! I was thinking sending a v1 just because of this...

-- Daniel

reviewer Reviewed-by
#5 lore raw

Re: [PATCH 1/2] sched/deadline: Replenishment timer should fire in the next period

In reply to Peter Zijlstra
Quoted 5 lines · On Mon, 13 Feb 2017 12:10:25 +0100 Peter Zijlstra <[email protected]> wrote:

I've interpreted this as:

Holler if you disagree.

You can add mine too. I put in a lot of trace_printk()s and it all appears to be exactly as Daniel describes.

-- Steve

#14 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Daniel Bristot de Oliveira

kernel/sched/deadline.c static void dequeue_dl_entity(struct sched_dl_entity *dl_se) · line 964

Quoted 6 lines · On Fri, 10 Feb 2017 20:48:11 +0100 Daniel Bristot de Oliveira…
kernel/sched/deadline.c +5 -0
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+	return dl_se->dl_runtime < dl_se->dl_period;
+}
+

Is it ever appropriate for a dl task to have runtime == period? What purpose would that serve? Just run the task as FIFO higher than everything else.

Or was this suppose to be dl_deadline < dl_period?

-- Steve

Reviewed-by
#6 lore raw

Re: [PATCH 1/2] sched/deadline: Replenishment timer should fire in the next period

In reply to Steven Rostedt
Quoted 6 lines · Steven Rostedt
Quoted 2 lines · On Mon, 13 Feb 2017 12:10:25 +0100 Peter Zijlstra <[email protected]> wrote:

I've interpreted this as:

Quoted 9 lines
Quoted 3 lines

Holler if you disagree.

You can add mine too. I put in a lot of trace_printk()s and it all appears to be exactly as Daniel describes.

I'm a bit late, but I looked at it as well and it looks good.

If you want,

Thanks!

- Juri

#15 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

In reply to Steven Rostedt
Quoted 10 lines · Steven Rostedt

kernel/sched/deadline.c static void dequeue_dl_entity(struct sched_dl_entity *dl_se) · line 964

Quoted 5 lines
kernel/sched/deadline.c +5 -0
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+	return dl_se->dl_runtime < dl_se->dl_period;
+}
+

Is it ever appropriate for a dl task to have runtime == period? What purpose would that serve? Just run the task as FIFO higher than everything else.

Or was this suppose to be dl_deadline < dl_period?

Oooooops, my bad :-(, this was supposed to be dl_deadline < dl_period.

I will send a v2 fixing it, along with the problem in the comment that peterz mentioned before.

Thanks Steven!

-- Daniel

#16 lore raw

Re: [PATCH 2/2] sched/deadline: Throttle a constrained deadline task activated after the deadline

Quoted 10 lines · Daniel Bristot de Oliveira
Quoted 9 lines · Steven Rostedt

kernel/sched/deadline.c static void dequeue_dl_entity(struct sched_dl_entity *dl_se) · line 964

Quoted 5 lines
kernel/sched/deadline.c +5 -0
+static inline bool dl_is_constrained(struct sched_dl_entity *dl_se)
+{
+	return dl_se->dl_runtime < dl_se->dl_period;
+}
+

Is it ever appropriate for a dl task to have runtime == period? What purpose would that serve? Just run the task as FIFO higher than everything else.

Quoted 2 lines
Quoted 1 line

Or was this suppose to be dl_deadline < dl_period?

Oooooops, my bad :-(, this was supposed to be dl_deadline < dl_period.

As

+ if (dl_time_before(dl_se->deadline, rq_clock(rq)) &&
+ dl_time_before(rq_clock(rq), dl_next_period(dl_se))) {

is never true for implicit deadline tasks, the problem was not causing further logical issues (apart from being conceptually obviously totally wrong, and causes the check to be called without the need to... me--).

-- Daniel